Slotting method for changing water into electricity

文档序号:1606268 发布日期:2020-01-10 浏览:26次 中文

阅读说明:本技术 一种改水电的开槽方法 (Slotting method for changing water into electricity ) 是由 韩建国 于 2019-09-25 设计创作,主要内容包括:本发明属于装修施工技术领域,尤其涉及一种改水电的开槽方法,根据设计方案进行弹线,弹完线后,操作人员用双手握住角磨机并开启水源电源,沿着上一步弹好的线,由下往上先浅浅的开一道印痕,深度为2-5mm,以防直接锯到所需深度,容易把喷洒的水将弹好的线冲掉,然后再由下往上直接切割到所需的深度,直到把立槽两侧的边界线所有需要开槽的地方全部锯完;然后手持电锤,将电锤调节到无转动档位,只具备冲击力即可,然后将电锤装上钻头,将立槽两侧边界线之间的墙面进行去除。(The invention belongs to the technical field of decoration construction, and particularly relates to a slotting method for changing water and electricity, wherein line snapping is carried out according to a design scheme, an operator holds an angle grinder with both hands and turns on a water source power supply after the line snapping is finished, a shallow trace is firstly marked from bottom to top along the line snapping in the previous step, the depth is 2-5mm, so that the required depth is prevented from being sawed directly, the snapped line is easily flushed by sprayed water, and then the line is directly cut to the required depth from bottom to top until all places needing slotting on boundary lines on two sides of a vertical slot are sawn; then handheld electric hammer adjusts the electric hammer to no rotation gear, only possesses the impact force can, then adorn the drill bit with the electric hammer, get rid of the wall between the border line of the both sides of founding the groove.)

1. A slotting method for changing water into electricity is characterized in that: the method comprises the following steps:

firstly, disassembling all lamp positions, switch panels and socket surfaces and leaving the wall body so as to check the layout of electric wires and further formulate a next construction scheme;

secondly, finding out an indoor horizontal line by using a level meter, wherein the double-control switch only bounces on a wall surface close to the head of the bedroom, the rest do not bounce, the socket switch needs to bounce for a circle indoors, the height of the socket is 500mm, the height of the switch is 1450mm, and the height of the double-control switch is 1000 mm;

thirdly, snapping a line according to a design scheme, adopting a vertical pipe vertical groove mode, not adopting a transverse mode, setting the distance between the vertical grooves of a single pipeline to be 17mm, setting the distance between the vertical grooves of two pipelines to be 34mm, and so on;

fourthly, after the line is popped up, the first slotting scheme is as follows: an operator holds the marble machine with a left hand to cut the wall surface from top to bottom along the elastic lines on the two sides of the vertical groove, holds a beverage bottle with the right hand to be filled with water, pricks a hole with the diameter of 2mm on the cover, squeezes the beverage bottle with the hand during cutting, and sprays water in the beverage bottle through a small water column through the small hole to be sprayed on a marble sheet of the marble machine, so that dust is effectively prevented from spreading; and a second slotting scheme: an angle grinder is adopted to be provided with a marble piece, one side or two sides of a cover of the marble piece are drilled with a hole by an electric drill, a copper elbow is arranged in the hole, the copper elbow is provided with a small hole with the aperture of 2mm, if the hole is drilled at one side, one end of 1 hose is connected with the copper elbow, the other end of the hose is connected with a water pump or tap water, if the holes are drilled at two sides, one end of 2 hoses is respectively connected with the copper elbow, the other end of the hose is connected with the water pump or tap water after being converged, automatic water spraying is realized to prevent dust scattering in the cutting process, when in cutting, an operator holds the angle grinder with two hands and starts a water source power supply, along the line which is bounced in the previous step, a trace is firstly shallowly formed from bottom to top, the depth is 2-5mm, so as to prevent the direct sawing to the required depth, the bounced line is easily washed by the sprayed water, and then, until all the places needing slotting on the boundary lines on the two sides of the vertical slot are sawn;

fifthly, the electric hammer is held by hands, the electric hammer is adjusted to a non-rotation gear and only has impact force, then the electric hammer is provided with a drill bit, and the wall surface between the boundary lines on the two sides of the vertical groove is removed.

2. The slotting method of a modified hydropower of claim 1, characterized in that: and a 150-angle grinder and 156-shaped marble chips are adopted in the slotting scheme II.

Technical Field

The invention belongs to the technical field of decoration construction, and particularly relates to a slotting method for changing water into electricity.

Background

Decoration is also called decoration or decoration, and refers to a whole set of construction scheme and design scheme which is implemented in a certain area and range, including hydropower construction, wall, floor, ceiling, landscape and the like, and is formed according to a certain design concept and aesthetic rules. In the decoration process, the transformation of water and electricity is an important link, and a hidden structure is generally adopted based on a pipeline, so that the process of slotting on a wall is a basic link. Traditional fluting mode is for directly getting rid of the cement on wall with the electric hammer, carries out the fluting, and this kind of fluting mode operation workman's freedom strong operability, and is not unified also nonstandard, and is inefficient to can produce a large amount of dusts in the work progress, it is internal that easily is inhaled by the operation workman, thereby influences operating personnel's health.

Disclosure of Invention

The invention provides a slotting method for improved water and electricity, which aims to solve the problems of non-standardization, low efficiency and easy generation of a large amount of dust in the background technology.

The technical problem solved by the invention is realized by adopting the following technical scheme:

a slotting method for changing water into electricity comprises the following steps:

firstly, disassembling all lamp positions, switch panels and socket surfaces and leaving the wall body so as to check the layout of electric wires and further formulate a next construction scheme;

secondly, finding out an indoor horizontal line by using a level meter, wherein the double-control switch only bounces on a wall surface close to the head of the bedroom, the rest do not bounce, the socket switch needs to bounce for a circle indoors, the height of the socket is 500mm, the height of the switch is 1450mm, and the height of the double-control switch is 1000 mm;

thirdly, snapping a line according to a design scheme, adopting a vertical pipe vertical groove mode, not adopting a transverse mode, setting the distance between the vertical grooves of a single pipeline to be 17mm, setting the distance between the vertical grooves of two pipelines to be 34mm, and so on;

fourthly, after the line is popped up, the first slotting scheme is as follows: an operator holds the marble machine with a left hand to cut the wall surface from top to bottom along the elastic lines on the two sides of the vertical groove, holds a beverage bottle with the right hand to be filled with water, pricks a hole with the diameter of 2mm on the cover, squeezes the beverage bottle with the hand during cutting, and sprays water in the beverage bottle through a small water column through the small hole to be sprayed on a marble sheet of the marble machine, so that dust is effectively prevented from spreading; and a second slotting scheme: an angle grinder is adopted to be provided with a marble piece, one side or two sides of a cover of the marble piece are drilled with a hole by an electric drill, a copper elbow is arranged in the hole, the copper elbow is provided with a small hole with the aperture of 2mm, if the hole is drilled at one side, one end of 1 hose is connected with the copper elbow, the other end of the hose is connected with a water pump or tap water, if the holes are drilled at two sides, one end of 2 hoses is respectively connected with the copper elbow, the other end of the hose is connected with the water pump or tap water after being converged, automatic water spraying is realized to prevent dust scattering in the cutting process, when in cutting, an operator holds the angle grinder with two hands and starts a water source power supply, along the line which is bounced in the previous step, a trace is firstly shallowly formed from bottom to top, the depth is 2-5mm, so as to prevent the direct sawing to the required depth, the bounced line is easily washed by the sprayed water, and then, until all the places needing slotting on the boundary lines on the two sides of the vertical slot are sawn;

fifthly, the electric hammer is held by hands, the electric hammer is adjusted to a non-rotation gear and only has impact force, then the electric hammer is provided with a drill bit, and the wall surface between the boundary lines on the two sides of the vertical groove is removed.

And a 150-angle grinder and 156-shaped marble chips are adopted in the slotting scheme II.

The invention has the beneficial effects that:

through this technical scheme, not only great improvement the efficiency of construction, saved a large amount of manual works, the cost is reduced to construction quality is more secure, and is more unified and pleasing to the eye, and this technical scheme has still solved the problem of job site dust diffusion, and the effectual dust that prevents is inhaled the lung by operating personnel in, has protected site constructor's health, and this technical scheme's fluting method, easy and simple to handle, the implementation is convenient for, and it is very ideal to implement the effect.

Drawings

FIG. 1 is a schematic structural view of an inventive angle grinder;

in the figure: 1-angle grinder, 2-marble piece, 3-cover, 4-copper elbow, 5-copper elbow, 6-hose, 7-hose, 8-header pipe, 9-electric wire, 10-water tank, and 11-water pump.

Detailed Description

A slotting method for changing water into electricity comprises the following steps:

firstly, disassembling all lamp positions, switch panels and socket surfaces and leaving the wall body so as to check the layout of electric wires and further formulate a next construction scheme;

secondly, finding out an indoor horizontal line by using a level meter, wherein the double-control switch only bounces on a wall surface close to the head of the bedroom, the rest do not bounce, the socket switch needs to bounce for a circle indoors, the height of the socket is 500mm, the height of the switch is 1450mm, and the height of the double-control switch is 1000 mm;

thirdly, snapping a line according to a design scheme, adopting a vertical pipe vertical groove mode, not adopting a transverse mode, setting the distance between the vertical grooves of a single pipeline to be 17mm, setting the distance between the vertical grooves of two pipelines to be 34mm, and so on;

fourthly, after the line is popped up, the first slotting scheme is as follows: an operator holds the marble machine with a left hand to cut the wall surface from top to bottom along the elastic lines on the two sides of the vertical groove, holds a beverage bottle with the right hand to be filled with water, pricks a hole with the diameter of 2mm on the cover, squeezes the beverage bottle with the hand during cutting, and sprays water in the beverage bottle through a small water column through the small hole to be sprayed on a marble sheet of the marble machine, so that dust is effectively prevented from spreading; and a second slotting scheme: an angle grinder is adopted to be provided with a marble piece, one side or two sides of a cover of the marble piece are drilled with a hole by an electric drill, a copper elbow is arranged in the hole, the copper elbow is provided with a small hole with the aperture of 2mm, if the hole is drilled at one side, one end of 1 hose is connected with the copper elbow, the other end of the hose is connected with a water pump or tap water, if the holes are drilled at two sides, one end of 2 hoses is respectively connected with the copper elbow, the other end of the hose is connected with the water pump or tap water after being converged, automatic water spraying is realized to prevent dust scattering in the cutting process, when in cutting, an operator holds the angle grinder with two hands and starts a water source power supply, along the line which is bounced in the previous step, a trace is firstly shallowly formed from bottom to top, the depth is 2-5mm, so as to prevent the direct sawing to the required depth, the bounced line is easily washed by the sprayed water, and then, until all the places needing slotting on the boundary lines on the two sides of the vertical slot are sawn;

fifthly, the electric hammer is held by hands, the electric hammer is adjusted to a non-rotation gear and only has impact force, then the electric hammer is provided with a drill bit, and the wall surface between the boundary lines on the two sides of the vertical groove is removed.

And a 150-angle grinder and 156-shaped marble chips are adopted in the slotting scheme II.