Be applied to fire pipeline erection mechanism in spherical rack steel construction workshop of individual layer

文档序号:483116 发布日期:2022-01-04 浏览:11次 中文

阅读说明:本技术 一种应用于单层球形网架钢结构车间的消防管道架设机构 (Be applied to fire pipeline erection mechanism in spherical rack steel construction workshop of individual layer ) 是由 王星杰 曲业岭 王鹤 李晨 陈波 刘士喜 李燕 张彬 石海荣 李春英 王修 刘 于 2021-09-26 设计创作,主要内容包括:本发明公开一种应用于单层球形网架钢结构车间的消防管道架设机构,包括设置于顶棚内的钢结构组合,所述钢结构组合包括间隔设置的多个球形节点,每个球形节点的周围均可拆卸式连接有多个支撑杆,每个球形节点上方均连接有至少一个用于支撑消防管道的支撑板,所述支撑板上方可拆卸式连接有至少一个用于固定消防管道的压环,所述支撑板的周围可拆卸式连接有多个拉杆,所述拉杆的另一端与对应的支撑杆可拆卸式连接。该机构采用多个连接件可拆卸式连接的方式,可以方便、快捷地进行消防管道的架设及维修工作。(The invention discloses a fire fighting pipeline erecting mechanism applied to a single-layer spherical net rack steel structure workshop, which comprises a steel structure combination arranged in a ceiling, wherein the steel structure combination comprises a plurality of spherical nodes arranged at intervals, a plurality of supporting rods are detachably connected around each spherical node, at least one supporting plate used for supporting a fire fighting pipeline is connected above each spherical node, at least one compression ring used for fixing the fire fighting pipeline is detachably connected above each supporting plate, a plurality of pull rods are detachably connected around each supporting plate, and the other ends of the pull rods are detachably connected with the corresponding supporting rods. The mechanism adopts a mode of detachably connecting a plurality of connecting pieces, and can conveniently and quickly erect and maintain the fire-fighting pipeline.)

1. The utility model provides a be applied to fire control pipeline erection mechanism in spherical rack steel construction workshop of individual layer, a serial communication port, including setting up the steel construction combination in the ceiling, steel construction combination includes a plurality of spherical nodes (13) that the interval set up, and all detachable a plurality of bracing pieces (4) of being connected with around every spherical node, every spherical node top all is connected with at least one backup pad (3) that are used for supporting the fire control pipeline, detachable at least one clamping ring (2) that are used for fixed fire control pipeline that are connected with in backup pad top, detachable a plurality of pull rods (7) of being connected with around the backup pad, the other end of pull rod is connected with bracing piece (4) detachable that correspond.

2. The fire fighting pipeline erecting mechanism applied to the single-layer spherical grid steel structure workshop as claimed in claim 1, wherein a plurality of connecting blocks (8) are arranged on the lower surface of the supporting plate (3), and the pull rod penetrates through the connecting blocks and then is detachably connected with the first nut (9).

3. The fire fighting pipeline erecting mechanism applied to the single-layer spherical grid steel structure workshop as claimed in claim 1, wherein the supporting plate (3) is provided with a plurality of through holes penetrating through the upper and lower surfaces, and the pull rod (7) is detachably connected with the supporting plate through the through holes by using the first nut (12).

4. The fire fighting pipeline erecting mechanism applied to the single-layer spherical net rack steel structure workshop as recited in claim 3, wherein the axis of the through hole is inclined at a set angle with respect to a vertical plane.

5. The fire fighting pipeline erecting mechanism applied to gas stations as recited in claim 1, wherein the supporting plate (3) is provided with a plurality of through holes penetrating through the upper and lower surfaces, each through hole is internally connected with a lifting ring (10), the other end of each lifting ring is rotatably connected with a threaded sleeve (11), and the threaded sleeve is detachably connected with the pull rod (7).

6. The fire fighting pipeline erecting mechanism applied to the single-layer spherical net rack steel structure workshop as recited in claim 1, wherein the other end of each pull rod (7) is connected with a split ring (6), the split ring is sleeved outside the support rod (4), the pull rod is positioned at the opening of the split ring, and the pull rod, the split ring and the support rod are detachably connected through a screw and nut combination (5).

7. The fire fighting pipeline erecting mechanism applied to the single-layer spherical net rack steel structure workshop as claimed in claim 1, wherein the compression ring (2) is of an inverted U-shaped structure, and two ends of the inverted U-shaped structure are detachably connected with the second nut (9) after penetrating through the supporting plate (3).

Technical Field

The invention relates to the field of mechanical structures, in particular to a fire fighting pipeline erecting mechanism applied to a single-layer spherical net rack steel structure workshop.

Background

The single-layer spherical net rack steel structure workshop has the advantages of light building weight, high strength, large span, large space, low cost and the like, and becomes one of the options that owners like industrial plants. The owner is for promoting the space needs, so laying of fire control facility extremely be important, and the lower part of spherical structure is taken to the mode of traditional fire control pipeline of erectting, occupies the lower part available space of steel construction with the fire control pipeline.

Disclosure of Invention

Aiming at the problems, the invention discloses a fire fighting pipeline erecting mechanism applied to a single-layer spherical net rack steel structure, which adopts a mode that a plurality of connecting pieces are detachably connected, and can conveniently and quickly erect and maintain fire fighting pipelines.

In order to achieve the technical purpose, the invention adopts the following technical scheme:

the utility model provides a be applied to fire pipeline erection mechanism in spherical rack steel construction workshop of individual layer, is including setting up the steel construction combination in the ceiling, steel construction combination includes a plurality of spherical nodes that the interval set up, and all detachable a plurality of bracing pieces that are connected with around every spherical node, every spherical node top all is connected with at least one backup pad that is used for supporting the fire pipeline, the detachable at least one clamping ring that is used for fixed fire pipeline that is connected with in backup pad top, detachable a plurality of pull rods that are connected with around the backup pad, the other end and the bracing piece detachable connection that corresponds of pull rod.

Preferably, the lower surface of the supporting plate is provided with a plurality of connecting blocks, and the pull rod penetrates through the connecting blocks and then is detachably connected with the first nut.

Preferably, the support plate is provided with a plurality of through holes penetrating through the upper surface and the lower surface, and the pull rod penetrates through the through holes and is detachably connected with the support plate through a first nut.

Preferably, the axis of the through hole and the vertical plane are obliquely arranged at a set angle.

Preferably, the backup pad is provided with a plurality of through-holes that run through upper and lower surface, all connects a rings in every through-hole, the other end of rings rotates and is connected with the thread bush, the thread bush is connected with the pull rod is detachable.

Preferably, the other end of each pull rod is connected with an open ring, the open ring is sleeved outside the support rod, the pull rod is positioned at the opening of the open ring, and the pull rod, the open ring and the support rod are detachably connected through a screw and nut combination.

Preferably, the clamping ring is of an inverted U-shaped structure, and two ends of the inverted U-shaped structure penetrate through the supporting plate and then are detachably connected with the second nut.

The invention has the advantages of

According to the invention, the supporting plate is additionally arranged above the steel structure node, the fire fighting pipeline is supported by the supporting plate, and the periphery of the supporting plate is connected with the supporting rod of the steel structure by the pull rod, so that the connection strength and firmness are increased, all the components are in detachable threaded connection, welding is not required, and stress change caused by welding to the steel structure is avoided, and the safety performance of the steel structure is not influenced.

Drawings

In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present application, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.

FIG. 1 is a first schematic structural diagram according to a first embodiment of the present invention;

FIG. 2 is a second schematic structural diagram according to an embodiment of the present invention;

FIG. 3 is a schematic structural diagram of a second embodiment of the present invention;

FIG. 4 is a schematic structural diagram of a third embodiment of the present invention;

in the figure, the fire fighting pipeline comprises a pressure ring 1, a fire fighting pipeline 2, a pressure ring 3, a support plate 4, a support rod 5, a bolt and nut combination 6, a split ring 7, a pull rod 8, a connecting block 9, a second nut 10, a hanging ring 11, a thread sleeve 12, a first nut 13 and a spherical node.

Detailed Description

The technical solutions in the embodiments of the present application will be described clearly and completely with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the present application without making any creative effort, shall fall within the protection scope of the present application.

In the description of the present invention, it is to be understood that the terms "inner", "outer", "left" and "right" indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.

Example one

The invention discloses a fire fighting pipeline erecting mechanism applied to a single-layer spherical net rack steel structure as shown in figures 1-2, which comprises a steel structure combination arranged on a workshop ceiling and an auxiliary connecting piece fixedly erecting a fire fighting pipeline 1 together with the steel structure combination. The steel structure combination includes spherical node 13 and bracing piece 4, and spherical node 13 is a plurality of, and a plurality of spherical nodes are set for the distance at the ceiling interval of filling station and are arranged, 6 screw holes of surface processing of spherical node, bracing piece 4 through threaded connection in every screw hole, and the bracing piece of adjacent spherical node passes through connecting rod and relevant structure interconnect and becomes a whole. The spherical node and the supporting rod are manufactured by machining after the quenching and tempering of 45 steel, the hardness of a workpiece is HB 240 plus 270, the outer surface is subjected to anti-corrosion treatment, the surface is required to be smooth and free of burrs after the surface machining, and the surface roughness is recommended to be 12.5 mu m or below.

Every spherical node top all is connected with a supporting sleeve, at supporting sleeve top erection joint backup pad 3, can be in advance at the mill with the supporting sleeve lower extreme with spherical node welding firm, supporting sleeve upper end and backup pad welding firm, then transport the assembly scene of filling station, backup pad 3 is diameter 300 mm's circular steel sheet, the fire control pipeline transversely places in the top of a plurality of backup pads, it is fixed with backup pad 3 through clamping ring 2, places and falls. The clamping ring 2 is an inverted U-shaped structure formed by processing reinforcing steel bars or round steel bars through a bending machine, threaded screw rods are processed at two ends of the inverted U-shaped structure, and the screw rods penetrate through the supporting plate 3 and are fastened through second nuts 9. The arc part of the inverted U-shaped structure and the support plate are combined to form a closed space, and the fire fighting pipeline is extruded and fixed in the closed space.

For further reinforcing fixed fastness, set up four connecting blocks 8 at the lower surface of backup pad, this connecting block can weld in the backup pad lower surface in the lump when welding the support sleeve can, every connecting block all processes horizontal through-hole, and wherein one end of pull rod 7 is fixed with the nut after running through this through-hole, and the other end and the trompil ring 6 of pull rod 7 are connected. The split ring 6 is sleeved outside the support rod 4, the two ends of the opening of the split ring are provided with connecting end plates, each connecting end plate is provided with a through hole, the pull rod is inserted between the two connecting end plates, the through hole of the rear pull rod is coaxial with the through holes of the two connecting end plates, the screw and nut combination 5 is screwed after being inserted into the through holes, the support rod is tightly held by the split ring, and the position of the pull rod is firmly fixed.

The split ring, the pull rod and the compression ring are processed by 45 steel and then are subjected to quenching and tempering treatment, the hardness is kept at HRC50-55, after the processing is finished, all parts are chamfered into acute angles, the surfaces are smooth and have no burrs or flashes, and the surfaces are subjected to bluing treatment or are plated with an anticorrosive coating. When the four pull rods and the connecting block are screwed, the four pull rods and the connecting block need to be screwed up in a crossed, symmetrical, gradual and uniform manner.

Example two

In this embodiment, only the connection manner of the support plate and the pull rod is different, and the rest of the structure is the same as that of the first embodiment. The connected mode of lug connection is chooseed for use to the backup pad with the connected mode of pull rod, it has a plurality of through-holes that run through to be in backup pad 3 promptly, the through-hole of lower surface, the axis in hole is the setting angle slope setting with vertical plane, this through-hole is the hole of all inclining in vertical plane and horizontal plane promptly, pull rod 7 is fixed with second nut 9 and backup pad after running through this through-hole, this kind of connected mode utilizes the effect of bracing piece 4 to decompose the power of pull rod into vertical ascending holding power and the outside pulling force of level, the support of auxiliary stay board to the fire control pipeline, can improve stability, alleviate the heavy burden of backup pad, the whole fastness of reinforcing device.

EXAMPLE III

In this embodiment, only the connection manner of the support plate and the pull rod is different, and the rest of the structure is the same as that of the first embodiment. The surface of the supporting plate 3 is provided with a plurality of through holes penetrating through the upper surface and the lower surface, each through hole is internally connected with a lifting ring 10, the other end of each lifting ring is rotatably connected with a threaded sleeve 11, the end, without the through hole, of the pull rod 7 is provided with a thread, after the pull rod 7 is connected with the split ring through the through hole, the threaded end is screwed into the threaded sleeve, and the threaded sleeve is connected with the pull rod 7 through the threads. This kind of connected mode can solve backup pad and pull rod lug connection or through the skew that the connecting block arouses because the direction deviation when being connected, and the screw thread cover can be followed rings and rotated in pull rod threaded connection's in-process, does not receive the direction restriction.

Example four

In this embodiment, only the connection manner of the threaded sleeve and the pull rod is different, and the rest of the structure is the same as that of the third embodiment. After four pull rods are screwed into corresponding threaded sleeves, through holes are machined in the pull rods and the threaded sleeves, pin shafts penetrate into the through holes and are split pins, the contact rate is not less than 60% of the matching length, the tail portions of the pins are pulled open after installation, and the threaded sleeves are prevented from being separated from the pull rods after thread sliding. After the pull rod is connected with the threaded sleeve, a pin shaft is also driven between the threaded sleeve and the lifting ring to prevent the threaded sleeve from continuously rotating around the lifting ring.

The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

7页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种交叉位移管道自动连接分离装置

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类