Dovetail type hoop of fixing equipment for angle steel tower body

文档序号:1267499 发布日期:2020-08-25 浏览:27次 中文

阅读说明:本技术 一种在角钢塔塔身固定设备的燕尾式卡箍 (Dovetail type hoop of fixing equipment for angle steel tower body ) 是由 敬晓宇 于 2020-04-21 设计创作,主要内容包括:本发明提供一种在角钢塔塔身固定设备的燕尾式卡箍,该卡箍包括第一卡箍件、第二卡箍件,第一卡箍件、第二卡箍件将角钢塔塔身夹在中间,第一卡箍件和第二卡箍件通过锁紧件进行连接,当卡箍在角钢塔塔身上固定完毕时,第一卡箍件或者第二卡箍件产生弹性形变;进一步地,第一卡箍件、第二卡箍件为双层结构。本发明提供的燕尾式卡箍采用钣金件与螺栓螺母的组合装配形式,具有用料少、材料利用率高、生产成本低、加工效率高的特点,能够减少企业对卡箍的生产成本,并缩短抱箍的生产周期;双层结构的第一卡箍件、第二卡箍件相对于实心的单层结构的第一卡箍件、第二卡箍件,所用材料少,极大的减少卡箍的整体重力,减少安装人员爬上角钢塔时携带的负重。(The invention provides a dovetail type hoop of angle steel tower body fixing equipment, which comprises a first hoop member and a second hoop member, wherein the first hoop member and the second hoop member clamp an angle steel tower body in the middle, the first hoop member and the second hoop member are connected through a locking member, and when the hoop is fixed on the angle steel tower body, the first hoop member or the second hoop member generates elastic deformation; further, the first clamp piece and the second clamp piece are of a double-layer structure. The dovetail type hoop provided by the invention adopts a combined assembly form of the sheet metal part and the bolt and the nut, has the characteristics of less material consumption, high material utilization rate, low production cost and high processing efficiency, can reduce the production cost of an enterprise on the hoop, and shortens the production period of the hoop; bilayer structure's first clamp spare, second clamp spare for solid single layer construction's first clamp spare, second clamp spare, used material is few, the whole gravity of very big reduction clamp, the heavy burden that carries when reducing the installer and climbing the angle-steel tower.)

1. The utility model provides a dovetail clamp at angle steel tower body of tower fixed equipment, its characterized in that, this clamp include first clamp spare, second clamp spare, and first clamp spare, second clamp spare press from both sides angle steel tower body in the centre, and first clamp spare and second clamp spare are connected through the retaining member, and when the clamp was fixed when finishing on angle steel tower body, first clamp spare or second clamp spare produced elastic deformation.

2. The dovetail clip of claim 1, wherein the first and second clip members are of a double-layer construction.

3. The dovetail clip of claim 2, wherein the first clip member comprises a first mounting plate, a second mounting plate, and a first connecting plate, the first connecting plate connecting the first mounting plate and the second mounting plate; the second clamp piece includes third mounting panel, fourth mounting panel and second connecting plate, and third mounting panel and fourth mounting panel are connected to the second connecting plate.

4. The dovetail clip of claim 3, wherein the first mounting plate is substantially identical to the second mounting plate, and the third mounting plate is substantially identical to the fourth mounting plate.

5. The dovetail clip of claim 3, wherein the first mounting plate has a first mounting surface and a second mounting surface for contacting the turret body, the first mounting surface and the second mounting surface forming an angle of 80 ° to 90 °.

6. The dovetail clip of claim 3, wherein the locking member is connected to the first connecting plate and the second connecting plate, and the locking member is provided with at least two locking members, or more than three locking members.

7. The dovetail clip of claim 4, wherein the first mounting plate has a notch on a side thereof that contacts the turret body.

8. The dovetail clip of claim 7, wherein the notch is angled, and wherein a first hole is formed in a corner of the notch.

9. The dovetail clip of claim 4, wherein the third mounting plate has a second hole in a side thereof that contacts the turret body.

10. The dovetail clip of claim 4, wherein the first mounting plate has a radius on a side thereof remote from the angle tower body, the radius opening facing away from the angle tower body.

Technical Field

The invention relates to the technical field of communication equipment, in particular to a dovetail type hoop of an angle steel tower body fixing device.

Background

The existing mobile network 2G equipment, 3G equipment and 4G equipment coexist, several networks need a sky space for installing antennas, and the existing sky space is seriously insufficient along with the preparation of 5G equipment for market.

The existing communication equipment is installed on an angle steel tower and generally adopts two installation modes: firstly, equipment is bound on an angle steel tower by using a steel binding belt, and when the installation mode is adopted, the steel binding belt is small in bearing and only can be used for fixing light equipment, and potential safety hazards exist when heavy equipment is fixed; secondly, when the steel strip is customized according to the angle steel tower, the steel strip is welded into an equipment mounting platform and is mounted on the angle steel tower, and when the angle steel tower is fixed by adopting the mode, the problem of small bearing is solved, but because the angle steel tower schemes are various, measurement is needed before each angle steel tower is mounted, the problems of long customization period and complex processing exist, in addition, when a large batch of angle steel towers are mounted, each angle steel tower needs to be welded, the efficiency is slow, in addition, the mounting platform formed by welding has large dead weight and poor corrosion resistance, frequent tower mounting maintenance is needed, and the workload and the potential safety hazard are increased invisibly.

Disclosure of Invention

The invention aims to provide a dovetail type hoop of an angle steel tower body fixing device, which aims to solve the problems in the background technology.

The technical scheme adopted by the invention is that the dovetail type hoop of the angle steel tower body fixing equipment comprises a first hoop member and a second hoop member, the first hoop member and the second hoop member clamp the angle steel tower body in the middle, the first hoop member and the second hoop member are connected through a locking member, and when the hoop is fixed on the angle steel tower body, the first hoop member or the second hoop member generates elastic deformation.

Further, the first clamp piece and the second clamp piece are of a double-layer structure.

Further, the first hoop component comprises a first mounting plate, a second mounting plate and a first connecting plate, and the first connecting plate is connected with the first mounting plate and the second mounting plate; the second clamp piece includes third mounting panel, fourth mounting panel and second connecting plate, and third mounting panel and fourth mounting panel are connected to the second connecting plate.

Further, the first mounting plate and the second mounting plate are identical in shape, and the third mounting plate and the fourth mounting plate are identical in shape.

Furthermore, a first mounting surface and a second mounting surface which are in contact with the tower body of the angle steel tower are arranged on the first mounting plate, and an included angle formed between the first mounting surface and the second mounting surface is 80-90 degrees.

Furthermore, the locking piece is connected with the first connecting plate and the second connecting plate, and the locking piece is at least provided with two or more than three.

Furthermore, a notch is formed in one side, in contact with the body of the angle steel tower, of the first mounting plate.

Furthermore, the notch is in an angle shape, and a first hole is formed in the corner of the notch.

Furthermore, a second hole is formed in one side, in contact with the angle steel tower body, of the third mounting plate.

Furthermore, an arc is arranged on one side, far away from the angle steel tower body, of the first mounting plate, and the back of the arc opening is opposite to the angle steel tower body.

Furthermore, a supporting piece is arranged between the third mounting plate and the fourth mounting plate, and an oblique angle is formed in the supporting piece.

In conclusion, the beneficial effects of the invention are as follows: the dovetail type hoop provided by the invention adopts a combined assembly form of the sheet metal part and the bolt and the nut, has the characteristics of less material consumption, high material utilization rate, low production cost and high processing efficiency, can reduce the production cost of an enterprise on the hoop, and shortens the production period of the hoop; compared with the solid first clamp piece and the solid second clamp piece which are of a single-layer structure, the first clamp piece and the second clamp piece which are of a double-layer structure are made of a small amount of materials, so that the overall gravity of the clamps is greatly reduced, and the load carried by an installer when climbing the angle steel tower is reduced; the first clamp piece and the second clamp piece are connected through the locking piece, when the clamp is fixed on the angle steel tower body, the first clamp piece or the second clamp piece generates elastic deformation, the clamping force of the first clamp piece and the second clamp piece on the angle steel tower is increased, the maximum friction force of the clamp when the clamp slides on the angle steel tower body can be improved, and the bearing capacity of the clamp is increased; the surface of the clamp is free of welding spots, so that the clamp has strong corrosion resistance, and the trouble of frequent maintenance is avoided; locking device can fix the staple bolt fast, simple to operate greatly reduces the engineering time.

Drawings

FIG. 1 is a schematic view of the overall structure of a dovetail type clamp;

FIG. 2 is an exploded view of FIG. 1;

FIG. 3 is a top view of FIG. 1;

FIG. 4 is a schematic view of a dovetail clip secured to an angle tower body;

fig. 5 is a structural view of the first clip member of a single-layer structure.

Detailed Description

Embodiments of the invention are described in further detail below with reference to the accompanying drawings, it being noted that the examples are merely illustrative of the invention and should not be considered as limiting, and that all features disclosed in the examples of the invention, or steps in all methods or processes disclosed, may be combined in any way, except for mutually exclusive features and/or steps.

The invention provides a dovetail type hoop for fixing equipment on an angle steel tower body, which is used for stably fixing the equipment on the angle steel tower and comprises a first hoop part 10 and a second hoop part 20, wherein the first hoop part 10 and the second hoop part 20 clamp an angle steel tower body 30 in the middle, and the first hoop part 10 and the second hoop part 20 are connected through a locking part 40, and referring to the attached drawings 1 and 4. The angle tower body 30 is generally a long steel strip with two perpendicular sides and an angle shape, and the lengths of the two sides of the long steel strip selected on the angle tower are generally the same. Specifically, the first hoop member 10 is installed on the inner side of the angle tower body 30, the second hoop member 20 is installed on the outer side of the angle tower body 30, the first hoop member 10 and the second hoop member 20 are of a double-layer structure, and the double-layer structure can enable the first hoop member 10 and the second hoop member 20 to be stably installed on the angle tower body 30. If the first and second clip members 10 and 20 have a single-layer structure, the first and second clip members 10 and 20 need to have a sufficient thickness in order to ensure stability after installation. Referring to fig. 5, the first collar member 10 having a single-layer structure is shown in the drawing, and compared to the first collar member 10 having a double-layer structure shown in fig. 2, the first collar member 10 having a single-layer structure requires more materials for manufacturing, has high manufacturing cost, heavy parts, and is inconvenient to carry, and in an actual installation test, the effect of the first collar member 10 having a single-layer structure after being installed on the body 30 of the angle iron tower is substantially the same as that of the first collar member 10 having a double-layer structure, so the first collar member 10 and the second collar member 20 preferably have a double-layer structure.

The first clip member 10 includes a first mounting plate 11, a second mounting plate 12, and a first connecting plate 13, the first connecting plate 13 connecting the first mounting plate 11 and the second mounting plate 12; the second clip member 20 includes a third mounting plate 21, a fourth mounting plate 22, and a second connecting plate 23, and the second connecting plate 23 connects the third mounting plate 21 and the fourth mounting plate 22. The locking member 40 connects the first connecting plate 13 and the second connecting plate 23, so that the first hoop member 10 and the second hoop member 20 sandwich the angle-steel tower body 30. As a further preferred scheme, the first mounting plate 11 and the second mounting plate 12 are the same in shape, the third mounting plate 21 and the fourth mounting plate 22 are the same in shape, the first connecting plate 13 is perpendicular to the plane of the first mounting plate 11 and the second mounting plate 12, and the second connecting plate 23 is perpendicular to the plane of the third mounting plate 21 and the fourth mounting plate 22. When the clamp is installed on the angle steel tower body 30, the first installation plate 11 and the second installation plate 12 on the first clamp 10 are abutted against the inner side of the angle steel tower body 30, and the third installation plate 21 and the fourth installation plate 22 on the second clamp 20 are abutted against the outer side of the angle steel tower body 30. When the locking member 40 connects the first connecting plate 13 and the second connecting plate 23, the force provided by the locking member 40 to the first collar member 10 and the second collar member 20 is always perpendicular to the length direction of the angle tower body 30, and the force along the length direction of the angle tower body 30 is not resolved. Furthest's the clamp force of having remain between clamp and angle steel tower body 30 to promote the maximum frictional force of clamp when sliding on angle steel tower body 30, make the clamp be difficult for sliding behind the angle steel tower body 30.

In some other embodiments, the first and second clip members 10 and 20 can also be a multi-layer structure, for example, three or more layers. The first and second ferrule members 10 and 20 having the three-layer structure can achieve similar effects to the first and second ferrule members 10 and 20 having the two-layer structure when they are mounted. However, in the factory processing process, the first clamp member 10 and the second clamp member 20 with the double-layer structure can be formed (sheet metal parts) by sheet metal stamping and bending, and the processing is easy and the processing cost is low; however, in general, the three-layer structure cannot be directly processed by a sheet metal process, and a casting mold mode is selected, so that the processing is complicated, and the processing cost is high. Therefore, the first clip member 10 having a two-layer structure is preferable in the case where the difference in performance is not large, and cost saving can be achieved.

Preferably, the first mounting plate 11 is connected to the second mounting plate 12 through two first connecting plates 13, and the third mounting plate 21 is connected to the fourth mounting plate 22 through two second connecting plates 23. Correspondingly, at least two or more than three locking members 40 are arranged for connecting the first connecting plate 13 and the second connecting plate 23, and at least one locking member 40 is arranged between each first connecting plate 13 and the second connecting plate 23. The locking member 40 can enable the first hoop member 10 and the second hoop member 20 to be fixed on the angle steel tower body 30 in a balanced mode, and the situation that one side of the first hoop member is fixed tightly and one side of the second hoop member is fixed loosely cannot occur.

Preferably, referring to fig. 2, the first connecting plate 13 is provided with a first connecting hole 14, the second connecting plate 23 is provided with a second connecting hole 24, and the first collar member 10 and the second collar member 20 can be connected by passing bolts and nuts through the first connecting hole 14 and the second connecting hole 24. This connection has an advantage that the bolt and the nut can be tightened easily, and the first clip member 10 and the second clip member 20 can be fixed firmly by tightening the bolt and the nut. In some other embodiments, the first clamp member 10 and the second clamp member 20 can be connected by passing the cable tie through the first connecting hole 14 and the second connecting hole 24, the cable tie can be made of steel cable tie, the connection method has the advantages of quick fixation, but has the defects of difficult tightening, and therefore the fixation is weaker than bolt and nut. The clamp is fixed on the angle steel tower body 30, the primary purpose is to fix firmly, therefore, the bolt and nut which can be tightened is the preferable connection mode in the invention, and the locking piece 40 comprises a bolt 41, a flat gasket 42, a spring gasket 43 and a nut 44. Of course, the locking member 40 can be selected from other conventional connection methods according to different application scenarios, and the selection of the connection method is not limited in this invention.

Preferably, referring to fig. 2 and 3, the first mounting plate 11 is provided with a first mounting surface 15 and a second mounting surface 16 which contact the angle steel tower body 30, the third mounting plate 21 is provided with a third mounting surface 25 and a fourth mounting surface 26 which contact the angle steel tower body 30, (the first mounting plate 11 and the second mounting plate 12 have the same shape, the second mounting plate 12 is also provided with the first mounting surface 15 and the second mounting surface 16 which contact the angle steel tower body 30, the third mounting plate 21 and the fourth mounting plate 22 have the same shape, the fourth mounting plate 22 is also provided with the third mounting surface 25 and the fourth mounting surface 26 which contact the angle steel tower body 30), the first mounting surface 15 and the second mounting surface 16 contact the inner side of the angle steel tower body 30, and the third mounting surface 25 and the fourth mounting surface 26 contact the outer side of the angle steel tower body 30. Because two sides of the angle steel tower body 30 are perpendicular to each other, in order to enable the first clamp member 10 and the second clamp member 20 to be well mounted on the angle steel tower body 30, the first mounting surface 15 and the second mounting surface 16 form an angle of 90 degrees, and the third mounting surface 25 and the fourth mounting surface 26 also form an angle of 90 degrees, so that the first clamp member 10 and the second clamp member 20 can be just attached to the angle steel tower body 30.

Further, when the angle between the first mounting surface 15 and the second mounting surface 16 and the angle between the third mounting surface 25 and the fourth mounting surface 26 are 90 degrees, respectively. After being fixed in angle steel tower body 30 with the clamp, the clamp force between first clamp 10 and the second clamp 20 is controlled by retaining member 40, because first clamp 10, second clamp 20 can laminate with angle steel tower body 30 just, after first clamp 10, the laminating of second clamp 20, because the laminating is inseparable, does not have the space of moving, installer just can't or hardly spin nut 44 again. At this time, the nut 44 is fixed to the bolt 41 by the repulsive force generated by the spring washer 43 when tightened, but such connection is not firm. Because conventional spring washers 43 will accommodate the deformation in the tightened state over time, resulting in less spring back force, nuts 44 will loosen, indirectly resulting in first and second clamp members 10, 20 not being able to clamp angle tower body 30 tightly, which may slip down along angle tower body 30 with the equipment if the equipment mounted thereon is heavy.

In order to ensure that the clamp and the equipment thereon are not loosened after being mounted on the angle steel tower body 30 for a long time, the clamp can still be firmly fixed on the angle steel tower body 30 and cannot slide downwards. The adopted technical scheme is as follows: when the clamp is completely fixed to the turret body 30, the locking member 40 elastically deforms the first clamp member 10 or the second clamp member 20. Specifically, in this embodiment, referring to fig. 3, mainly, the first clamp member 10 is elastically deformed, a notch 17 is disposed on one side of the first mounting plate 11, which is in contact with the angle-steel tower body 30, the notch 17 is in an angle shape, the notch 17 divides the first clamp member 10 into a left part and a right part, so that the first clamp member 10 has a capability of deforming in a direction of the notch 17, meanwhile, a first hole 18 is disposed at a corner position of the notch 17, the first hole 18 makes the corner position of the notch 17 of the first clamp member 10 not easily break in a deformation process, and the first hole 18 is preferably a circular hole. Meanwhile, an arc 19 is arranged on one side, far away from the angle steel tower body 30, of the first mounting plate 11, the opening back of the arc 19 is opposite to the position of the angle steel tower body 30 (the opening direction of the arc 19 is opposite to the opening direction of the notch 17), the length of one side, far away from the angle steel tower body 30, of the first mounting plate 11 is prolonged by the arc 19, and one side, far away from the angle steel tower body 30, of the first clamping hoop part 10 on the first mounting plate 11 in the deformation process cannot be broken due to stretching. As a further preferred solution, the angle between the first mounting surface 15 and the second mounting surface 16 is in the interval of 80 ° to 90 °, preferably 85 °; the third mounting surface 25 and the fourth mounting surface 26 form an angle of 90 °, and the notch 17 forms an angle in the interval of 60 ° to 120 °, preferably 90 °. Although the first collar member 10 cannot be completely attached to the angle tower body 30 in an undeformed state, the first collar member 10 is elastically deformed after the first collar member 10 and the second collar member 20 are completely attached to the angle tower body 30 by tightening the locking member 40, and at this time, the included angle formed between the first mounting surface 15 and the second mounting surface 16 is 90 degrees, and the first mounting surface 15 and the second mounting surface 16 are completely attached to the inner side of the angle tower body 30. In this state, since the first clip member 10 is elastically deformed, the first clip member 10 transmits an elastic force to the nut 44 in the locking member 40, and the elastic force generated by the first clip member 10 is much greater than the resilient force generated by the spring washer 43, so that the nut 44 is firmly fixed to the bolt 41 and is difficult to be loosened after being fixed for a long time. In addition, the clamping force transmitted to the angle steel tower body 30 by the first clamp member 10 and the second clamp member 20 in the deformation state is also larger than the clamping force when the first clamp member 10 is not deformed, so that the maximum friction force of the clamp when the clamp slides on the angle steel tower body 30 can be improved, and the bearing capacity of the clamp is increased. During the deformation of the first hoop member 10, the first hoop member 10 will transmit a part of the force to the second hoop member 20 through the locking member 40, and the second hoop member 20 may also be deformed, so as to avoid the fracture of the second hoop member 20 at the boundary position between the third mounting surface 25 and the fourth mounting surface 26, a second hole 27 is provided at the corner position of the third mounting plate 21 contacting the angle tower body 30, and the second hole 27 is preferably a circular hole. It should be noted that even if the second clip member 20 is deformed, the deformation degree is slight because the included angle formed by the third mounting surface 25 and the fourth mounting surface 26 is 90 °, the second clip member 20 is already attached to the angle-steel tower body 30, and the deformation space is insufficient.

Preferably, in some other embodiments, the second clip member 20 can be deformed to fix the clip firmly. The angle formed between the first mounting surface 15 and the second mounting surface 16 is 90 °, and the angle formed between the third mounting surface 25 and the fourth mounting surface 26 is in the interval of 90 ° to 100 °, preferably 95 °. In some other embodiments, the first clip member 10 and the second clip member 20 are deformed together to fix the clips firmly. The included angle formed between the first mounting surface 15 and the second mounting surface 16 is in the range of 80-90 degrees, and preferably 85 degrees; the third mounting surface 25 and the fourth mounting surface 26 form an angle in the interval of 90-100 degrees, preferably 95 degrees.

Preferably, the second clamp member 20 is used for connecting equipment, and the third mounting plate 21 and the fourth mounting plate 22 are provided with mounting holes 28, and the third mounting plate 21 and the fourth mounting plate 22 are provided with at least two mounting holes 28, respectively, and the mounting holes 28 are used in pairs, because the single mounting hole 28 cannot limit the rotation of the equipment when the equipment is fixed. In addition, because the second hoop member 20 has a double-layer structure, when the second hoop member 20 is connected to a device through the mounting hole 28, the third mounting plate 21 and the fourth mounting plate 22 may be bent, so that the support member 50 is disposed between the third mounting plate 21 and the fourth mounting plate 22, the support member 50 can support the third mounting plate 21 and the fourth mounting plate 22, and the support member 50 is provided with the bevel 51, so that the support member 50 can be conveniently installed between the third mounting plate 21 and the fourth mounting plate 22. As a further preferred option, since the mounting holes 28 are used in pairs, referring to fig. 2, the supporting member 50 can be two cylindrical sleeves, or two through holes are provided in one supporting member 50, and the size of the through holes is the same as that of the mounting holes 28.

Preferably, the first clamp member 10, the second clamp member 20, and the assembled dovetail clamp are symmetrical. Due to the design, the hoop is not distinguished in the direction during installation, and the installation is convenient.

Preferably, the first and second clip members 10 and 20 are made of a high-strength steel material, which is not easily deformed and does not rust. The clamp adopts the equipment mode of part formula, and the clamp need not the welding in the installation, and the installation is simple swift, and the installation is accomplished the back product surface and does not have the welding point, has better corrosion resisting ability, work load when can reducing the later maintenance. The bolt 41 and the nut 44 in the locker 40 are surface-treated to increase the hardness thereof and make it less prone to rust.

The above description is only an embodiment of the invention, but the scope of the invention is not limited thereto, and any changes or substitutions that are not thought of through the inventive work should be included in the scope of the invention, and therefore, the scope of the invention should be subject to the scope defined by the claims.

11页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种层板封边安装结构及柜体和安装方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类