Automatic grinding ball lifting and loading device for ball mill

文档序号:1725740 发布日期:2019-12-20 浏览:26次 中文

阅读说明:本技术 一种球磨机用磨球自动提升装填装置 (Automatic grinding ball lifting and loading device for ball mill ) 是由 朱立立 于 2019-09-05 设计创作,主要内容包括:本发明公开了一种球磨机用磨球自动提升装填装置,包括球磨机,所述球磨机的仓门一侧设置有底座,所述底座上端固接有轨道,所述轨道上端滑动连接有活动台,所述活动台的侧面开设有滑槽,所述滑槽内部竖直滑动连接有运输块,所述运输块的上端开设有球形槽,其中位于滑槽左侧的活动台上端开设有倾斜的第一滑轨,位于所述轨道左侧的底座上端还固定支撑有倾斜设置的物料盘,所述物料盘较低端侧壁开设有开口,所述开口处焊接有倾斜设置的第二滑轨,所述第二滑轨的最低点位于第一滑轨的正上方。本发明可自动将成批磨球逐个排列并提升装填至球磨机的罐体内,节省人工装球的时间精力,工作效率更高;且能降低磨球装入时对球磨机罐体内部的损伤。(The invention discloses an automatic grinding ball lifting and filling device for a ball mill, which comprises a ball mill, wherein a base is arranged on one side of a bin gate of the ball mill, a track is fixedly connected to the upper end of the base, a movable table is connected to the upper end of the track in a sliding manner, a sliding groove is formed in the side surface of the movable table, a conveying block is vertically connected to the inside of the sliding groove in a sliding manner, a spherical groove is formed in the upper end of the conveying block, an inclined first sliding rail is formed in the upper end of the movable table on the left side of the sliding groove, an inclined material disc is fixedly supported at the upper end of the base on the left side of the track, an opening is formed in the lower end side wall of the material disc, a second sliding rail which is. The ball mill can automatically arrange the grinding balls in batches one by one and lift and fill the grinding balls into the tank body of the ball mill, so that the time and energy for manually loading the grinding balls are saved, and the working efficiency is higher; and the damage to the inside of the tank body of the ball mill when the grinding balls are loaded can be reduced.)

1. The utility model provides a ball mill is with ball milling automatic lifting loading device, includes ball mill (1), its characterized in that, bin gate one side of ball mill (1) is provided with base (2), base (2) upper end rigid coupling has track (3), track (3) upper end sliding connection has movable table (4), spout (5) have been seted up to the side of movable table (4), the inside vertical sliding connection of spout (5) has transport block (6), spherical groove has been seted up to the upper end of transport block (6), wherein is located the left movable table (4) upper end of spout (5) and sets up the first slide rail of slope, is located still fixed support has material dish (7) that the slope set up on the left base (2) of track (3), the opening has been seted up to the lower terminal lateral wall of material dish (7), the opening part welding has second slide rail (8) that the slope set up, the lowest point of second slide rail (8) is located directly over first slide rail, base (2) upper end still fixed stay has transport seat (9), transport seat (9) adopt the cuboid structure, transport seat (9) inside runs through and has seted up pipeline (10), and the lower mouth of pipe of pipeline (10) is located transport block (6) spherical groove directly over and slightly be higher than activity platform (4) upper surface, the rigid coupling has one deck magnetic material on pipeline (10) inner wall, the upper end lateral wall of transport seat (9) is seted up jaggedly (11), breach (11) department welding has direction slide (12) that the slope set up, and the other end of direction slide (12) inserts and establish in the door of advancing ball mill (1), base (2) upper end still is equipped with the actuating mechanism who is connected with transport block (6).

2. The automatic grinding ball lifting and filling device for the ball mill according to claim 1, wherein the driving mechanism comprises a first rotating shaft (13) rotatably connected with the side wall of the transportation block (6), a connecting block (14) is welded at one end of the first rotating shaft (13) far away from the transportation block (6), a second rotating shaft (15) is fixedly connected with the side wall of the lower end of the connecting block (14), a limiting seat (16) and a driving motor are fixedly arranged at the upper end of the base (2), and one end of the second rotating shaft (15) far away from the connecting block (14) penetrates through the limiting seat (16) and is fixedly connected with the output end of the driving motor.

3. The automatic lifting and filling device for the grinding balls of the ball mill according to claim 1 is characterized in that the linear distance between the lowest point of the second slide rail (8) and the side wall of the conveying seat (9) is slightly larger than the diameter of one grinding ball, and the vertical height between the lowest point of the second slide rail (8) and the first slide rail is slightly smaller than the diameter of one grinding ball.

Technical Field

The invention relates to the technical field of ball mills, in particular to an automatic grinding ball lifting and filling device for a ball mill.

Background

Grinding balls of the ball mill need to be replaced after being used for a period of time, most of the existing ball mills adopt manual ball loading, the labor intensity is high, and the working efficiency is low; some manufacturers pursue efficiency and use a lifting device to pour bagged grinding balls into the ball mill tank body from the upper part of the ball mill tank body at one time, but because the quality of the grinding balls is large, a plurality of grinding balls are poured into the ball mill tank body from the upper part at the same time, and the damage to the lining of the ball mill tank body is easily caused.

Therefore, we propose an automatic grinding ball lifting and loading device for a ball mill.

Disclosure of Invention

The invention aims to solve the problems in the background art and provides an automatic grinding ball lifting and filling device for a ball mill.

In order to achieve the purpose, the invention adopts the following technical scheme: an automatic grinding ball lifting and filling device for a ball mill comprises a ball mill, wherein a base is arranged on one side of a bin gate of the ball mill, a track is fixedly connected to the upper end of the base, a movable table is slidably connected to the upper end of the track, a sliding groove is formed in the side face of the movable table, a conveying block is vertically and slidably connected to the inside of the sliding groove, a spherical groove is formed in the upper end of the conveying block, an inclined first sliding rail is arranged at the upper end of the movable table on the left side of the sliding groove, an inclined material disc is fixedly supported at the upper end of the base on the left side of the track, an opening is formed in the side wall of the lower end of the material disc, a second sliding rail which is obliquely welded at the opening, the lowest point of the second sliding rail is positioned right above the first sliding rail, a conveying seat is fixedly supported at, and pipeline's lower mouth of pipe is located directly over the spherical groove of transportation piece and is a little higher than the movable table upper surface, the rigid coupling has one deck magnetic material on the pipeline inner wall, the breach has been seted up to the upper end lateral wall of transport seat, the welding of breach department has the direction slide that the slope set up, and the other end of direction slide inserts and establishes in the storehouse door of ball mill, the base upper end still is equipped with the actuating mechanism who is connected with the transportation piece.

In foretell ball mill is loaded with ball automatic lifting device, actuating mechanism rotates the first pivot of connecting including transportation piece lateral wall, the one end welding of transportation piece is kept away from to first pivot has the connecting block, the lower extreme lateral wall rigid coupling of connecting block has a second pivot, the fixed spacing seat and a driving motor that is equipped with in base upper end, the one end that the connecting block was kept away from in the second pivot runs through spacing seat and driving motor's output rigid coupling.

In the automatic ball mill ball lifting device filling device for a ball mill, the linear distance between the lowest point of the second slide rail and the side wall of the conveying seat is slightly larger than the diameter of one ball, and the vertical height between the lowest point of the second slide rail and the first slide rail is slightly smaller than the diameter of one ball.

Compared with the prior art, this ball mill is with ball automatic lifting filling device's advantage lies in:

1. the movable table, the sliding chute and the conveying block which are driven by the motor to do circulating motion are matched with the material tray, the second sliding rail, the conveying seat and the conveying pipeline for use, so that grinding balls can be conveyed one by one and accumulated in the conveying pipeline, and then are rolled into the bin door of the ball mill one by one through the guide sliding plate and enter the tank body of the ball mill, the time and the energy for manually loading the balls are saved, and the working efficiency is higher;

2. the deceleration strip arranged on the guide sliding plate is matched with the grinding balls rolled out from the notch of the conveying pipeline for use, so that the rolling speed of the grinding balls is weakened, the grinding balls can slide along the inner wall of the ball mill after entering the bin gate of the ball mill, and the damage to the inner part of the tank body of the ball mill is reduced.

Drawings

FIG. 1 is a schematic structural view of an automatic grinding ball lifting and loading device for a ball mill according to the present invention;

FIG. 2 is a top view of the structure of a material plate part in the automatic ball-grinding lifting device for a ball mill according to the present invention;

FIG. 3 is a side view showing the structure of a connecting block portion in an automatic ball elevator apparatus for a ball mill according to the present invention.

In the figure: 1 ball mill, 2 bases, 3 tracks, 4 movable tables, 5 chutes, 6 transport blocks, 7 material trays, 8 second slide rails, 9 transport seats, 10 transport pipelines, 11 gaps, 12 guide sliding plates, 13 first rotating shafts, 14 connecting blocks, 15 second rotating shafts and 16 limiting seats.

Detailed Description

The following examples are for illustrative purposes only and are not intended to limit the scope of the present invention.