A kind of concrete renovation agent endurance test system

文档序号:1740870 发布日期:2019-11-26 浏览:16次 中文

阅读说明:本技术 一种混凝土修复剂耐久性试验系统 (A kind of concrete renovation agent endurance test system ) 是由 谭林 周帅 廖嘉欣 米鑫 黄弘 王冲 于 2019-08-27 设计创作,主要内容包括:本发明属于混凝土修复剂检测技术领域,涉及一种混凝土修复剂耐久性试验系统,箱体的内壁上安装的储液罐与试验盒通过输液管道连通,并由中央控制系统控制试验盒中腐蚀性溶液的进入量,试验盒包括底座、纵向固定安装在底座中部的两个隔板和横向均匀插设在隔板之间的若干插板,底座四角上下两面处均开设有圆孔,箱体的底部以及圆孔内均设置有导线接头,相邻底座的圆孔内可拆卸安装有用于堆砌试验盒的导线支柱,导线支柱内部设置有通电导线,试验盒靠近输液管道一侧的侧壁上活动穿设有多种伸缩电极,该混凝土修复剂耐久性试验系统能够综合多方面环境因素,批量完成混凝土修复剂耐久性试验,同时降低修复剂性能检测的难度并提高检测的效率。(The invention belongs to concrete renovation agent detection technique fields, it is related to a kind of concrete renovation agent endurance test system, the fluid reservoir installed on the inner wall of cabinet is connected to test box by liquid-transport pipe-line, and by the inlet of corrosive solution in central control system Control experiment box, test box includes pedestal, longitudinally fixed two partitions for being mounted on the middle of the base and the laterally homogeneous several plates being plugged between partition, circular hole is offered at the upper and lower surface of pedestal quadrangle, terminal is provided in the bottom of cabinet and circular hole, conducting wire pillar for piling up test box is detachably installed in the circular hole of adjacent pans, conducting wire pillar is internally provided with electrified wire, test box activity on the side wall of liquid-transport pipe-line side is worn there are many telescopic electrode, the concrete renovation agent endurance test system can integrate many-sided environmental factor, Batch completes the durability test of concrete renovation agent, while reducing the difficulty of healer properties detection and improving the efficiency of detection.)

1. a kind of concrete renovation agent endurance test system, which is characterized in that including cabinet, be placed on the intracorporal several examinations of case The central control system testing box and being mounted on cabinet is fixedly installed with for placing corrosive solution on the inner wall of cabinet Fluid reservoir, fluid reservoir are connected to test box by liquid-transport pipe-line, and by corrosive solution in central control system Control experiment box Inlet, test box includes pedestal, longitudinally fixed two partitions for being mounted on the middle of the base and laterally homogeneous is plugged in partition Between several plates, offer circular hole at the upper and lower surface of pedestal quadrangle, be provided in the bottom of test box and circular hole Terminal is detachably equipped with the conducting wire pillar for piling up test box in the circular hole of adjacent pans, sets inside conducting wire pillar It is equipped with electrified wire, the electrical connection of test box base conductor connector and adjacent test box is realized by conducting wire pillar, partition is inserted The junction of plate and pedestal offers the groove for placing waterproof material, and test box is living on the side wall of liquid-transport pipe-line side Dynamic to wear there are many telescopic electrode, test box front side is provided with the button for coordination electrode disengaging.

2. concrete renovation agent endurance test system as described in claim 1, which is characterized in that also installed in the cabinet There are heating tube, condenser, humidifier, scavenger fan, ultraviolet radiator, sensor and in connecting with central control system signal Portion's integrated circuit.

3. concrete renovation agent endurance test system as claimed in claim 2, which is characterized in that the central control system Route is internally integrated including display screen, control panel and for connect display screen and control panel.

4. concrete renovation agent endurance test system as described in claim 1, which is characterized in that offered on the pedestal Convenient for two the first guide grooves and several the second guide grooves convenient for plate sliding of partition sliding.

5. concrete renovation agent endurance test system as described in claim 1, which is characterized in that the pedestal is that cavity is long The circular hole depth of cube, pedestal four corners is identical and is respectively arranged with plug and jack, conducting wire pillar in corresponding pedestal circular hole Plug and jack be used cooperatively.

6. concrete renovation agent endurance test system as described in claim 1, which is characterized in that between two partitions away from From for 40mm, the distance between adjacent insert plates are also 40mm.

7. concrete renovation agent endurance test system as described in claim 1, which is characterized in that the electrode on test box is Carbon-point or stud.

8. concrete renovation agent endurance test system as described in claim 1, which is characterized in that the cabinet includes outside Metal cabinet and attaching plug, are inserted on power supply by attaching plug, provide power supply for the terminal on test box.

9. concrete renovation agent endurance test system as described in claim 1, which is characterized in that the heating tube is serpentine-like And it is fixedly mounted on the bottom of box.

10. concrete renovation agent endurance test system as described in claim 1, which is characterized in that the bottom of box can Disassembly is equipped with fixing seat, and the four corners of fixing seat are fixedly installed with anti-skidding support column.

Technical field

The invention belongs to concrete renovation agents to repair detection technique field, be related to a kind of concrete renovation agent durability test The testing inspection system of durability in system more particularly to a kind of concrete renovation agent repairing effect.Ts:(concrete renovation agent Durability)

Background technique

The features such as concrete material is because of its compression strength height, good integrity, plasticity height and low cost is usually with reinforcing bar The form of concrete is widely used in major construction project.Construction composed by it is not easy to demolish on a large scale and rebuild, institute It is just extremely necessary with the presence of concrete renovation agent.Current cement concrete patching material can be divided into inorganic and organic by property Two classes, for inorganic material based on cement-based material, hydration rate is fast, at low cost, but failure easy to fall off.Organic material has polymerization Object material, epoxy resin etc., caking property is strong, but easy to aging falls off.It, need to be to the bonding of renovation agent to determine healer properties quality Performance, anti-permeability performance and durability etc. are tested.

Adhesive strength is tested at this stage, is mainly indicated by indirect method with flexural strength, is repaired with half of reparation and centre It repairs to indicate, test flexural strength realizes that three-point bending method has the dimensions requirement to test specimen by three-point bending method, It needs to dispose test arm in corresponding position, test shearing strength is realized by direct shearing test.

In scholar's adhesive strength research at this stage, for testing the test specimen of standard 40mm × 40mm × 160mm used It by using the fritter semi-rigid sub-base material more than relative quantity and is cut into one using intermediate repairing method by production, one equality of horse The size of fixed number amount is 40mm × 40mm × 80mm test specimen, the half block test specimen fragmented into after flexural strength is tested and former cutting 40mm × 40mm out × 80mm test block is fitted into 40mm × 40mm × 160mm mold, prepares cement mortar according to a certain ratio Repair materials are poured into mold and are made having a size of 40mm × 40mm × 160mm cement mortar bonding testing piece;Yang Quanbing etc. is used Half of repairing method connects the concrete test block for being put into half block in punching block and having fractureed in 40mm × 40mm × 160mm three, then at another Half, which is added renovation agent, obtains having a size of 40mm × 40mm × 160mm cement mortar bonding testing piece;The test specimen of remaining scholar makes Applied mold is similar to both of the above.

Cement concrete repairs interface due to internal structure and hydrated product, vulnerable to air, underground water and soil The chemical erosion of middle harmful components, some organic patching materials even can generate unfavorable shadow to it due to the irradiation of ultraviolet light etc. It rings, causes the decline for repairing the performances such as interfacial volume deformation, intensity and service life so that the structure that is repaired more at present is not up to To causing secondary destruction life expectancy.However mold used in test mode at this stage is merely capable of completing intensity survey It has a try the production of part, the durable Journal of Sex Research of renovation agent is not paid attention to, so the mold of existing test Repair strength Lack the design for related durability test.

Influencing concrete structure durability key factor is harmful ion corrosion function, wherein sulfate ion, chloride ion The effects of it is relatively conventional.There are many varieties in saline-alkali areas in the provinces such as China Hebei, Shandong, Qinghai, once occurred concrete sewer pipe, Concrete foundation, concrete culvert etc. destroy situation, concrete structure highway, overpass, the water of the cold districts such as Jinan, Zhengzhou All there are problems that concrete structure in the buildings such as electrical engineering by sulfate attack.China's research sulfate invades concrete Erosion be since in the 1950s just, be substantially carried out the test method and failure mechanism of resisting erosion of sulfate.Sulfuric acid Root penetrates into inside concrete from the external world, and chemical reaction occurs with certain components of concrete and generates erosion to it.

Since the real life intermediate ion corrosion function period is longer, therefore mainly use electric osmose pulse in the lab at this stage Real-life long-time is simulated to use.Electric osmose pulse technique is produced between additional power source anode and cathode using electric osmosis principle Raw potential difference promotes cation to drive hydrone by bonding interface to cathode flow, to reach under positive voltage pulse effect To the effect of accelerated test.Cement concrete sulfate attack in Practical Project is accelerated for electric pulse mode, Wang Chong etc. is at it It is against corrosion under different eating conditions from the concrete of doping quantity of fly ash by testing Different Water-Cement Ratio, immersion way in research Coefficient acts on lower its test result of sulfate attack mechanism using scanning electron microscope analysis electric pulse and shows that electric pulse accelerates The sulfate attack of concrete, the concrete Sulphate-resistant property accelerated test method based on electric pulse principle are technically feasible. Liu Huanqin describes specific research method and device in its research, only forms a concrete sample, both sides in mold For solution, electrode is inserted into solution, connects impulse generator, do comparative analysis using clear water complete immersion and sodium sulphate complete immersion.

But ion erosion is one of the factor for influencing durability, environment temperature, humidity etc. are to renovation agent working condition Influence with performance is that significantly, the reparation interface of different renovation agents and concrete is shown completely not under difficult environmental conditions With anti-cracking ability, intensity and endurance, detecting in previous healer properties room is the wet standard state such as isothermal, Do not consider the coupling of multi-environment factor, therefore leads to desk research and the practical disconnection of application.In order to efficiently use, improve The quality of reparation, the endurance issues for testing renovation agent under the multi-environment factor coupling of lab analysis are imperative.

Have to the simulation of concrete actual working environment and performance test mainly using foundation large-scale environmental simulation test room Method, China Mining University etc. once carried out similar research, but disadvantage is to build and maintenance cost is high, and time-consuming, it is difficult to Receive by general Study and using unit.Large-scale environmental simulation test room is not suitable for small-sized reparation Interface Study, and not Consider the special tectonic of the reparation durable Journal of Sex Research in interface.

Since existing mold can not meet durability test and adhesive strength test simultaneously at this stage, in order to complete Whole efficient detection goes out renovation agent repairing performance, it is necessary to make a kind of examination that durability test (accelerated test) can be carried out to sample Check system reduces the difficulty of healer properties detection and improves the efficiency of detection.

Summary of the invention

In view of this, the present invention simulates above-mentioned existing for mold ask to solve existing concrete renovation agent detection effect Topic, provides a kind of concrete renovation agent endurance test system, which can integrate more Aspect environmental factor, batch complete the durability test of concrete renovation agent, while reducing the difficulty of healer properties detection and mentioning The efficiency of high detection.

In order to achieve the above objectives, the present invention provides a kind of concrete renovation agent endurance test system, including cabinet, placement In the intracorporal several test boxs piled up along short transverse of case and the central control system being mounted on cabinet, the inner wall of cabinet On be fixedly installed with fluid reservoir for placing corrosive solution, fluid reservoir is connected to test box by liquid-transport pipe-line, and in The inlet for entreating corrosive solution in control system Control experiment box, realizes the automation of corrosive solution fluid injection, corrosivity Solution is sodium sulphate, magnesium sulfate, sodium chloride etc.;Test box includes pedestal, longitudinally fixed two partitions for being mounted on the middle of the base And the laterally homogeneous several plates being plugged between partition, circular hole, the bottom of test box are offered at the upper and lower surface of pedestal quadrangle It is provided with terminal in portion and circular hole, the conducting wire for piling up test box is detachably installed in the circular hole of adjacent pans Pillar, conducting wire pillar are internally provided with electrified wire, realize test box base conductor connector and adjacent examination by conducting wire pillar The electrical connection of box is tested, the junction of partition, plate and pedestal offers the groove for placing waterproof material, and test box is close to defeated Activity is worn there are many telescopic electrode on the side wall of liquid pipe road side, be provided on front side of test box for coordination electrode disengaging by Button.

The beneficial effect of this base case is: test box is multi-layered devices, is formed by stacking by monolayer assay box, layer and layer Between by overlapping conducting wire pillar form entirety, realization makes full use of space.The bottom of box is placed and is provided with protrusion at test box Terminal, after the terminal of bottom test box and the bottom of box closely connects, test box and system become one it is whole Body can design the electrode for having variant type by central control system Control experiment box energization situation, monolayer assay box, can basis It is freely taken needed for experimenter's durability test.There are the more patch panel designs of more partitions inside monolayer assay box, independent assortment utilizes Make experimenter that can generate different test specimens according to self-condition, each plate and pedestal junction are also devised with waterproof groove.The present invention is real The laboratory simulation to practical engineering application environment is showed, has made obtained data and result more for actual reference, more Mend the vacancy situation of renovation agent durability research device now.

The trial zone of partition room can be averagely divided into several cavitys by the cooperation of partition, plate and pedestal, convenient for not With type concrete renovation agent sample preparation, a variety of concrete can be produced and repair test specimen, meet kinds of experiments needs.Terminal It is set in the same even depth circular hole of test box quadrangle upper and lower surface and the bottom of cabinet, conducting wire pillar both ends, which is equipped with, to be connect Head, inside are electrified wire.The same even depth circular hole that conducting wire pillar is designed by main body quadrangle upper and lower surface is by adjacent loading and unloading It sets to be connected and makes the connection of test box overlapping and cabinet and test box bottom, play support, reinforce and down devices is made to be powered Effect.

Further, be also equipped in cabinet heating tube, condenser, humidifier, scavenger fan, ultraviolet radiator, sensor with And route is internally integrated with what central control system signal was connect.The utility model has the advantages that heating tube, condenser, humidifier and ventilation wind Fan is respectively used to provide heat source, cold source, humidity, air flowing for the concrete renovation agent in test box, and ultraviolet radiator is used for mould Quasi- ultraviolet light irradiates the aging of lower renovation agent and repairs the variation of interfacial property, sensor for experience the intracorporal temperature of case and It is strong to adjust box interior temperature, humidity, ultraviolet light by every order that central control system inputs peripheral operation on demand for humidity The environmental conditions such as ionic species are corroded in degree, test box.

Further, central control system includes display screen, control panel and for connecting in display screen and control panel Portion's integrated circuit, wherein display screen can obtain every real-time physical parameter of box house, and control panel can be as required The physical parameters such as the intracorporal temperature of regulating box, humidity, uitraviolet intensity, the amount of being automatically added to and test box of control corrosion rate solution The opening and closing of internal electric field acceleration ion erosion device.The utility model has the advantages that the temperature, humidity condition in cabinet can pass through temperature and humidity On a display screen, while display screen can show the parameter of other governing factors to sensor feedback, and case is adjusted by control panel The environmental conditions such as temperature, humidity, uitraviolet intensity, erosion ionic species in body, reach and sufficiently simulate actual working environment Purpose.

Further, it is offered on pedestal convenient for two article of first guide groove of partition sliding and several convenient for the of plate sliding Two guide grooves.It is slided the utility model has the advantages that the first guide groove facilitates two partitions relative to pedestal, the second guide groove facilitates Plate is slided relative to pedestal.

Further, pedestal is cavity cuboid, and the circular hole depth of pedestal four corners is identical and is respectively arranged with plug and inserts Hole, conducting wire pillar in corresponding pedestal circular hole plug and jack be used cooperatively.The utility model has the advantages that one end of conducting wire pillar is socket Shape plug, the other end are the jack to match with plug, realize that the grafting of monolayer assay box is piled up by conducting wire pillar, and shape At complete circuit, the stability and detachability of tier testing box are good.

Further, the distance between two partitions are 40mm, and the distance between adjacent insert plates are also 40mm.The utility model has the advantages that The distance between adjacent separator and adjacent insert plates are 40mm, and partition and plate are oppositely arranged and complement each other to form for coagulation The cavity of native renovation agent durability test test specimen sample preparation.

Further, the electrode on test box is carbon-point or stud.The utility model has the advantages that carbon-point or stud electrolysis effectiveness are good, Telescopic carbon-point or stud can carry out the experiment of electric field acceleration ion erosion according to the access of test corrosion demand and electric discharge, The service life of Different electrodes can also be extended.

Further, cabinet includes external metallization cabinet and attaching plug, is inserted on power supply by attaching plug, is test box Terminal provide power supply.

Further, heating tube is serpentine-like and is fixedly mounted on the bottom of box.The utility model has the advantages that snakelike heating tube is in cabinet In test box test test specimen heating effect more preferably, the intracorporal uniform heat distribution of case.

Further, the bottom of box is detachably equipped with fixing seat, and the four corners of fixing seat are fixedly installed with anti-skidding support column.

The beneficial effects of the present invention are:

1, concrete renovation agent endurance test system disclosed in this invention, using split-type design, curing in the mold is extremely Demoulding after mortar solidifies completely removes partition and plate, neither shadow using the guide groove structure on pedestal below partition and plate Ring specimen shape does not influence probe intensity again;Concrete sample does not need curing in the mold to regulation age, improves the use of device Efficiency.

2, concrete renovation agent endurance test system disclosed in this invention, by plate by the sky between two pieces of partitions Chamber is divided into the chamber of same size, is convenient for the renovation agent sample preparation of variety classes concrete, can produce a variety of concrete reparations Test specimen meets kinds of experiments needs.The number of plate is adjustable simultaneously, can according to need while preparing sizes examination The test specimen of part, preparation can carry out the multinomial mechanical test such as bending test, beam test, shear test.

3, concrete renovation agent endurance test system disclosed in this invention, other than it can carry out test material preparation, The durability test that can also carry out concrete can be carried out different types of by the way that different types of corrosive solution is added Durability test, such as the test of Testing Resistance of Concrete To Sulfate, precenting chlorate corrosion etc.;It, can by adjusting the size of electric current To study influence etc. of the different degradation speeds for reparation interface.It is as follows that durability corrodes principle:

Entringite crystal type: solubility in water minimum entringite sulfate and 4CaOAl2O313H2O and 3CaO·Al2O3·CaSO4·12H2O reaction generates product 3CaOAl2O3·3CaSO4·32H2O, that is, entringite, ionic reaction Equation are as follows:

AlO2-+2OH-+2H2O→[Al(OH)6]3-

2[Al(OH)6]3-+6Ca2++24H2O→{Ca6[Al(OH)6]2·24H2O}6+

{Ca6[Al(OH)6]2·24H2O}6++3SO4 2-+2H2O→{Ca6[Al(OH)6]2·24H2O}(SO4)3·2H2O

MgSO4 corrosion-crystal type: aluminum sulphate improver is to be primarily due to Mg to the maximum one kind of concrete destruction2+With SO4 2-It is all to corrode former, reactional equation are as follows:

Mg2SO4+Ca(OH)2+2H2O→CaSO4·2H2O+Mg(OH)2

C-S-H+Mg2SO4+5H2O→Mg(OH)2+CaSO4·2H2O+2H2SiO4

4CaO·Al2O3·13H2O+3MgSO4+2Ca(OH)2→3CaO·Al2O3·3CaSO4·32H2O+3Mg(H)2

4, concrete renovation agent endurance test system disclosed in this invention, it is reusable, even if a portion The component that parts damages can also facilitate replacement to damage, can save test space using the design of test box multilayer build-up.

5, concrete renovation agent endurance test system disclosed in this invention, using circuit integration to test box main body and In test box, it is exposed to realize no circuit, makes device simplicity, solve circuit due to environmental change bring may leak electricity, The problems such as short-circuit, improves the safety of device.

6, concrete renovation agent endurance test system disclosed in this invention, by the way of system control, to test specimen The simulation of the environment such as different humidity, temperature, electromagnetic wave, automatic fluid injection can be carried out, the functions such as automatic power on-off realize concrete The automation of the test material preparation of renovation agent durability and maintenance.

Other advantages, target and feature of the invention will be illustrated in the following description to a certain extent, and And to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, Huo Zheke To be instructed from the practice of the present invention.Target of the invention and other advantages can be realized by following specification and It obtains.

Detailed description of the invention

To make the objectives, technical solutions, and advantages of the present invention clearer, the present invention is made below in conjunction with attached drawing excellent The detailed description of choosing, in which:

Fig. 1 is the structural schematic diagram of concrete renovation agent endurance test system of the present invention;

Fig. 2 is the structural schematic diagram in concrete renovation agent endurance test system of the present invention after test box overlapping;

Fig. 3 is the structural schematic diagram of conducting wire pillar in concrete renovation agent endurance test system of the present invention;

Fig. 4 is the structural schematic diagram of monolayer assay box in concrete renovation agent endurance test system embodiment 1 of the present invention;

Fig. 5 is the structural schematic diagram of monolayer assay box in concrete renovation agent endurance test system embodiment 2 of the present invention.

Appended drawing reference: central control system 1, display screen 11, control panel 12, cabinet 2, scavenger fan 21, ultraviolet radiator 22, condenser 23, fluid reservoir 24, humidifier 25, liquid-transport pipe-line 26, heating tube 27, test box 3, attaching plug 4, conducting wire pillar 5, pedestal 31, button 310, external groove 32, first partition 331, second partition 332, the first guide groove 34, the second guide groove 35, First plate 361, the second plate 362, third plate 363, the 4th plate 364, the 5th plate 365, the 6th plate the 366, the 7th Plate 367, inner groovy 37, electrode 38, terminal 39.

Specific embodiment

Illustrate embodiments of the present invention below by way of specific specific example, those skilled in the art can be by this specification Other advantages and efficacy of the present invention can be easily understood for disclosed content.The present invention can also pass through in addition different specific realities The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints and application, without departing from Various modifications or alterations are carried out under spirit of the invention.It should be noted that diagram provided in following embodiment is only to show Meaning mode illustrates basic conception of the invention, and in the absence of conflict, the feature in following embodiment and embodiment can phase Mutually combination.

Wherein, the drawings are for illustrative purposes only and are merely schematic diagrams, rather than pictorial diagram, should not be understood as to this The limitation of invention;Embodiment in order to better illustrate the present invention, the certain components of attached drawing have omission, zoom in or out, not Represent the size of actual product;It will be understood by those skilled in the art that certain known features and its explanation may be omitted and be in attached drawing It is understood that.

The same or similar label correspond to the same or similar components in the attached drawing of the embodiment of the present invention;It is retouched in of the invention In stating, it is to be understood that if there is the orientation or positional relationship of the instructions such as term " on ", "lower", "left", "right", "front", "rear" To be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description of the present invention and simplification of the description, rather than indicate or It implies that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore is described in attached drawing The term of positional relationship only for illustration, is not considered as limiting the invention, for the ordinary skill of this field For personnel, the concrete meaning of above-mentioned term can be understood as the case may be.