New Asphalt Pavement Structures

文档序号:1767822 发布日期:2019-12-03 浏览:35次 中文

阅读说明:本技术 新型沥青路面结构 (New Asphalt Pavement Structures ) 是由 陆宗琴 于 2019-07-19 设计创作,主要内容包括:新型沥青路面结构,包括铺设在地表的沥青路面层(1),沥青路面层(1)两侧设有便于雨水快速排放的排水槽(2),排水槽(2)下方埋设有用于收集雨水的管网一(6);沥青路面层(1)下方设有排水隔热层(4),排水隔热层(4)下方设有透水基层(5),透水基层(5)内预埋有用于收集雨水的管网二(7),透水基层(5)下方设有底基层(8);管网一(6)和管网二(7)均连接至滤水沟(9),管网二(7)的引水管一(71)和引水管二(72)呈平行设置、交叉分布,且分别与滤水沟(9)连通设置。本发明提高了路面抗裂缝能力,减少路面水损害和车辙,提升了行驶安全性和舒适性。(New Asphalt Pavement Structures, blacktop (1) including being laid on earth's surface, the rhone (2) that blacktop (1) two sides are equipped with convenient for rainwater quick drain, rhone (2) lower section are embedded with the pipe network one (6) for collecting rainwater;Draining thermal insulation layer (4) is equipped with below blacktop (1), it drains and is equipped with porous base course (5) below thermal insulation layer (4), it is embedded with the pipe network two (7) for collecting rainwater in porous base course (5), is equipped with underlayment (8) below porous base course (5);Pipe network one (6) and pipe network two (7) are connected to water-filtering ditch (9), the aqueduct one (71) and aqueduct two (72) of pipe network two (7) be set in parallel, cross-distribution, and is connected to setting with water-filtering ditch (9) respectively.The present invention improves road surface cracking resistance seam ability, reduces road surface Moisture Damage and track, improves driving safety and comfort.)

1. New Asphalt Pavement Structures, it is characterised in that: the blacktop (1) including being laid on earth's surface, blacktop (1) The rhone (2) that two sides are equipped with convenient for rainwater quick drain, rhone (2) is interior to be equipped with cobblestone (3), buries below rhone (2) Equipped with the pipe network one (6) for collecting rainwater;It is equipped with draining thermal insulation layer (4) below blacktop (1), drains thermal insulation layer (4) Lower section is equipped with porous base course (5), the interior pipe network two (7) being embedded with for collecting rainwater of porous base course (5), under porous base course (5) Side is equipped with underlayment (8);Pipe network one (6) and pipe network two (7) are connected to water-filtering ditch (9), are equipped in water-filtering ditch (9) green with periphery Change several irrigation pipes (10) of band connection setting, water-filtering ditch (9) both ends are equipped with aqueduct (11), and aqueduct (11), which is connected to, to be lauched Road;Pipe network two (7) includes several aqueducts one (71) and aqueduct two (72) that row is located in porous base course (5), aqueduct one (71) and aqueduct two (72) be set in parallel, cross-distribution, and aqueduct one (71) and aqueduct two (72) respectively with drainage Ditch (9) connection setting;Dmp filter mesh sheet (12) are equipped in water-filtering ditch (9).

2. New Asphalt Pavement Structures described in accordance with the claim 1, it is characterised in that: the blacktop (1) and base Layer (8) is the asphalt layer that voidage is no more than 5%.

3. New Asphalt Pavement Structures described in accordance with the claim 1, it is characterised in that: the pitch is according to claim 1 institute The New Asphalt Pavement Structures stated, it is characterised in that: the supercrust (1) with a thickness of 20-25mm.

4. New Asphalt Pavement Structures described in accordance with the claim 1, it is characterised in that: the underlayment (8) with a thickness of 40- 60mm。

5. New Asphalt Pavement Structures described in accordance with the claim 1, it is characterised in that: the draining thermal insulation layer (4) is gap The particulate formula asphalt layer of rate 15%-20%.

6. New Asphalt Pavement Structures described in accordance with the claim 1, it is characterised in that: the draining is according to claim 1 institute The New Asphalt Pavement Structures stated, it is characterised in that: the thermal insulation layer (4) with a thickness of 30-45mm.

7. New Asphalt Pavement Structures described in accordance with the claim 1, it is characterised in that: the porous base course (5) is from top to bottom It successively include coarse sands layer (51), cement stabilized macadam (52) layer and geotextile layer (53).

8. New Asphalt Pavement Structures described in accordance with the claim 1, it is characterised in that: the porous base course (5) with a thickness of 18-30mm。

Technical field

The present invention relates to technical field of municipal construction, specially New Asphalt Pavement Structures.

Background technique

Urban road is the skeleton in city, accelerates the construction of city emphasis Municipal Road Engineering, is both to improve city road network knot Structure builds convenient unobstructed urban road system, effectively improves road passage capability, and changes appearance of city and benefit the people's livelihood Important engineering.The moisture that current pavement engineering leans on cross fall nature dissipation extra mostly, when the water suction of asphalt pavement surface layer is full When can not rapidly permeate downwards, a large amount of ponding can be formed on the whole, water can be made to freeze when winter temperature is low, beat road surface It is sliding even to damage tile work by volume expansion, cause road surface inconvenient walking.

Summary of the invention

In order to solve the above technical problems, the present invention provides New Asphalt Pavement Structures, the pitch including being laid on earth's surface Supercrust, the rhone that blacktop two sides are equipped with convenient for rainwater quick drain are equipped with cobblestone in rhone, under rhone Side is embedded with the pipe network one for collecting rainwater;It is equipped with draining thermal insulation layer below blacktop, is equipped with below draining thermal insulation layer Porous base course is embedded with the pipe network two for collecting rainwater in porous base course, is equipped with underlayment below porous base course;One He of pipe network Pipe network two is connected to water-filtering ditch, and several irrigation pipes with periphery greening band connection setting, water-filtering ditch both ends are equipped in water-filtering ditch Equipped with aqueduct, aqueduct is connected to sewer;Pipe network two includes several aqueducts one and the diversion that row is located in porous base course Pipe two, aqueduct one and aqueduct two be set in parallel, cross-distribution, and aqueduct one and aqueduct two connect with water-filtering ditch respectively Logical setting;Dmp filter mesh sheet is equipped in water-filtering ditch.

Further, blacktop and underlayment are the asphalt layer that voidage is no more than 5%.Bituminous pavement Layer with a thickness of 20-25mm.Underlayment with a thickness of 40-60mm.

Further, the particulate formula asphalt layer that draining thermal insulation layer is voidage 15%-20%.Drain the thickness of thermal insulation layer Degree is 30-45mm.

Further, porous base course successively includes coarse sands layer, cement stabilized macadam layer and geotextile layer from top to bottom.It is permeable Base with a thickness of 18-30mm.

The present invention improves road surface cracking resistance seam ability, reduces road surface Moisture Damage and track, is promoted

Driving safety and comfort.Pipe network is set, rainwater is drained, realizes smooth discharge, rainwater is avoided to hoard.This The aqueduct of invention is connected with the greenbelt on periphery, improves urban landscape water weight.

Detailed description of the invention

Fig. 1 is schematic structural view of the invention.

In figure, 1. blacktops, 2. rhones, 3. cobblestones, 4. draining thermal insulation layers, 5. porous base courses, 6. Pipe network one, 7. pipe networks two, 8. underlayments, 9. water-filtering ditchs, 10. irrigation pipes, 11. aqueducts, 12. dmp filter mesh sheet, 51. coarse sands layer, 52. cement stabilized macadams, 53. geotextile layers, 71. aqueducts one, 72. aqueducts two.

Specific embodiment

As shown in Figure 1, New Asphalt Pavement Structures, the blacktop 1 including being laid on earth's surface, 1 liang of blacktop The rhone 2 that side is equipped with convenient for rainwater quick drain, rhone 2 is interior to be equipped with cobblestone 3, is embedded with below rhone 2 for receiving Collect the pipe network 1 of rainwater;It is equipped with draining thermal insulation layer 4 below blacktop 1, drains and is equipped with porous base course 5 below thermal insulation layer 4, It is embedded with the pipe network 27 for collecting rainwater in porous base course 5, is equipped with underlayment 8 below porous base course 5;Pipe network 1 and pipe network 27 are connected to water-filtering ditch 9, are equipped with several irrigation pipes 10 with periphery greening band connection setting in water-filtering ditch 9, and 9 liang of water-filtering ditch End is equipped with aqueduct 11, and aqueduct 11 is connect by pipeline with sewer.If pipe network 27 includes that row is located in porous base course 5 Dry aqueduct 1 and aqueduct 2 72, aqueduct 1 and aqueduct 2 72 be set in parallel, cross-distribution, and aqueduct one 71 and aqueduct 2 72 be connected to setting with water-filtering ditch 9 respectively;Dmp filter mesh sheet 12 is equipped in water-filtering ditch 9.1 He of blacktop Underlayment 8 is the asphalt layer that voidage is no more than 5%.Blacktop 1 with a thickness of 20-25mm.Underlayment 8 With a thickness of 40-60mm.Porous base course 5 successively includes coarse sands layer 51,52 layers of cement stabilized macadam and geotextile layer 53 from top to bottom. Porous base course 5 with a thickness of 18-30mm.The particulate formula asphalt layer that thermal insulation layer 4 is voidage 15%-20% is drained, can be led Dynamic temperature control.Drain thermal insulation layer 4 with a thickness of 30-45mm.

5页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:沥青道路修复方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!