Curb clamping device

文档序号:1403195 发布日期:2020-03-06 浏览:15次 中文

阅读说明:本技术 一种路缘石夹持装置 (Curb clamping device ) 是由 付志伟 欧阳浩博 祝文斌 金强 于周旭 于 2019-11-22 设计创作,主要内容包括:本发明公开了一种路缘石夹持装置,包括交叉铰接的支撑杆,所述支撑杆端部内侧固定连接有适于夹紧路缘石的凸起部。优选的,所述凸起部外包裹有缓冲层。优选的,所述支撑杆有多个交叉连接孔。本发明两套组合使用,结构合理,操作方便,使用安全可靠,而且能提高施工效率和质量,节约施工成本。(The invention discloses a curb clamping device which comprises supporting rods hinged in a crossed mode, wherein the inner sides of the end parts of the supporting rods are fixedly connected with protruding parts suitable for clamping a curb. Preferably, the bulge is wrapped with a buffer layer. Preferably, the support rod has a plurality of cross-connection holes. The invention combines two sets for use, has reasonable structure, convenient operation and safe and reliable use, can improve the construction efficiency and quality and save the construction cost.)

1. A curb clamping device which characterized in that: the device comprises a supporting rod (1) which is hinged in a crossing manner, wherein a protruding part (2) suitable for clamping a curb is fixedly connected to the inner side of the end part of the supporting rod (1).

2. A kerb retaining apparatus as claimed in claim 1, wherein: the bulge (2) is wrapped with a buffer layer (4).

3. A kerb retaining apparatus as claimed in claim 1, wherein: the supporting rod (1) is provided with a plurality of cross connecting holes (5).

4. A kerb retaining apparatus as claimed in claim 3, wherein: the support rod (1) is connected with the connecting hole (5) through a bolt (3).

5. A kerb retaining apparatus as claimed in claim 1, wherein: the other end of the supporting rod (1) is provided with a blocking hand (6).

6. A kerb retaining apparatus as claimed in claim 1, wherein: the support rod (1) is S-shaped.

7. A kerbstone clamping apparatus of claim 6, wherein: the tail end of the supporting rod (1) and the lug boss (2) are wrapped with a second buffer layer (7).

8. A kerb retaining apparatus as claimed in claim 2, wherein: the buffer layer (4) is made of rubber or polyurethane.

9. A kerbstone clamping apparatus of claim 7, wherein: the second buffer layer (7) is made of rubber or polyurethane.

Technical Field

The invention belongs to erection and adjustment devices for construction of heavy kerbs of roads, and particularly relates to a kerb clamping device.

Background

At present, in the construction process of a road, the installation and erection construction of the kerbstone is an important process, and for enabling the material at the edge of the road to be more durable, the longitudinal line type of the kerbstone is ensured to be smooth and attractive, the prior art mostly uses heavy stone materials such as finished granite and the like, because the stone materials are heavy, the accurate positioning in the installation process is more troublesome, and how to quickly erect and adjust the position is particularly important.

Disclosure of Invention

The technical problem to be solved by the invention is as follows: a curb clamping device is provided that is quick to erect and adjust position.

In order to solve the technical problems, the inventor has practiced and summarized the technical scheme of the invention, and the invention discloses a kerbstone clamping device which comprises a cross-hinged supporting rod, wherein a lug boss suitable for clamping a kerbstone is fixedly connected to the inner side of the end part of the supporting rod.

Preferably, the bulge is wrapped with a buffer layer.

Preferably, the support rod has a plurality of cross-connection holes.

Preferably, the support rod connecting holes are connected through bolts.

Preferably, the other end of the supporting rod is provided with a blocking hand.

Preferably, the support bar is S-shaped.

Preferably, the tail end of the support rod and the bulge are wrapped with a second buffer layer.

Preferably, the buffer layer is rubber or polyurethane.

Preferably, the second buffer layer is rubber or polyurethane.

Compared with the prior art, the invention can obtain the following technical effects:

1. the invention combines two sets for use, has reasonable structure, convenient operation and safe and reliable use, can improve the construction efficiency and quality and save the construction cost.

2. The buffer layer or the second buffer layer plays a role in buffering and protecting the curb in the process of clamping the curb.

3. The S-shaped structure is easier for workers to apply force, and the operation is safer.

Drawings

In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.

FIG. 1 is a schematic structural view of example 1;

FIG. 2 is a schematic structural view of example 2.

In the figure:

1 support bar

2 raised part

3 bolt

4 buffer layer

5 connecting hole

6 keep off hand

Detailed Description

In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.

The application of the principles of the present invention will be further described with reference to the accompanying drawings and specific embodiments.

5页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种人造草坪自动化铺设装置及铺设方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类