pavement repairing method

文档序号:1704946 发布日期:2019-12-13 浏览:33次 中文

阅读说明:本技术 一种路面修补方法 (pavement repairing method ) 是由 田国芝 王旭荣 于 2019-09-26 设计创作,主要内容包括:本发明公开了一种路面修补方法,属于道路维护技术领域,包括以下步骤:(1)测量破损路面的面积,根据破损路面的形状在周围画出封闭环,所述封闭环包围破损路面;(2)开挖所述封闭环内的破损基;(3)制作与封闭环形状相适配的钢制环,将钢制环沿封闭环下沉至破损基的基础;(4)清理钢制环内的破损基;(5)在钢制环内填灌混凝土,并夯实;(6)在所述钢制环内位于所述混凝土的上方铺设加固钢网;(7)将所述加固钢网的周边与所述钢制环内壁焊接固定;(8)浇注沥青;(9)压实。本发明使用方便,能够快速修补路面,缩短了路面维护工期,广泛应用于道路维护中。(the invention discloses a pavement repairing method, which belongs to the technical field of road maintenance and comprises the following steps: (1) measuring the area of the damaged pavement, and drawing a closed ring around the damaged pavement according to the shape of the damaged pavement, wherein the closed ring surrounds the damaged pavement; (2) excavating damaged bases in the closed ring; (3) manufacturing a steel ring matched with the shape of the closed ring, and sinking the steel ring to the foundation of the damaged base along the closed ring; (4) cleaning damaged bases in the steel ring; (5) filling concrete in the steel ring and tamping; (6) paving a reinforcing steel net above the concrete in the steel ring; (7) welding and fixing the periphery of the reinforcing steel mesh and the inner wall of the steel ring; (8) pouring asphalt; (9) and (6) compacting. The invention is convenient to use, can quickly repair the road surface, shortens the maintenance period of the road surface and is widely applied to road maintenance.)

1. A pavement patching method is characterized by comprising the following steps: (1) measuring the area of the damaged pavement, and drawing a closed ring around the damaged pavement according to the shape of the damaged pavement, wherein the closed ring surrounds the damaged pavement; (2) excavating the damaged base in the closed ring, wherein the distance between the edge of the excavated base and the closed ring is 20-30 mm, and the excavation depth is equal to the foundation of the damaged base; (3) manufacturing a steel ring matched with the shape of the closed ring, wherein the height of the steel ring is equivalent to the excavation depth, sinking the steel ring to the foundation of the damaged base along the closed ring, and the upper top surface of the steel ring is 5-10 mm lower than the road surface; (4) cleaning damaged bases in the steel ring; (5) filling concrete in the steel ring and tamping; (6) paving a reinforcing steel net above the concrete in the steel ring; (7) welding and fixing the periphery of the reinforcing steel mesh and the inner wall of the steel ring; (8) pouring asphalt; (9) and (6) compacting.

2. The method of road patching of claim 1, wherein the lower end of the steel ring is provided with a cutting edge.

3. The method of road patching of claim 2, wherein the sharp corner of the blade foot is inclined from the outer surface of the steel ring to the inner surface of the steel ring.

4. A method of road patching as claimed in claim 3, wherein the inner surface of the steel ring is provided with an annular flange at the upper end of the steel ring.

5. The method of repairing a roadway of claim 4 wherein the edge of the concrete abuts the lower surface of the annular flange.

6. The method of repairing a pavement according to claim 5, wherein a transverse reinforcement is provided in said concrete.

7. A pavement patching method as claimed in any one of claims 1 to 6, wherein the ends of the transverse reinforcement bars bear against the inner surface of the steel loop.

8. The method of repairing a road surface according to any one of claims 1 to 7, wherein in the step (6), the upper surface of the reinforcing steel net is 5 to 10 mm from the upper top surface of the steel ring.

Technical Field

The invention relates to the technical field of road maintenance, in particular to a pavement repairing method.

Background

after the highway construction is accomplished and is put into use, through a period of wearing and tearing, road surface damage, hollow phenomenon can appear, need intercept the road when maintaining at present, use the machineshop car to chisel the damaged road surface, fill pitch after clearing up again, it is well known, the cost of machineshop car is very high, this to the routine maintenance of road, undoubtedly greatly increased the maintenance cost, and the required equipment of this kind of repair mode is numerous, area is big, operator's the amount of labour is big, the work period is long, the normal use of road has been influenced. In addition, in the traditional road maintenance, after a damaged road surface is chiseled, concrete is usually filled for treatment, and then asphalt is filled, so that the combination effect of the concrete and the original roadbed is not ideal, and the filled road surface is often damaged again after being used for a long time; the tamping method is also adopted for improving the strength of the filled concrete, but when the filled concrete is tamped, the original roadbed can be damaged, and the service life of the adjacent pavement is influenced.

Therefore, based on the above-mentioned drawbacks, there is still a need for research and improvement of new road surface repairing methods in the field of road maintenance, which is also a research focus and focus in the field of road maintenance at present, and is the starting point and the driving force of the present invention.

Disclosure of Invention

In view of the above-mentioned drawbacks, the present inventors have made extensive and intensive studies and, as a result, have completed the present invention after having paid full inventive efforts.

Specifically, the technical problems to be solved by the present invention are: the pavement repairing method is convenient to operate, can quickly repair damaged pavements, does not affect the service life of adjacent pavements, and shortens the pavement maintenance period.

In order to solve the technical problem, the technical scheme of the invention is to provide a pavement repairing method, which comprises the following steps: measuring the area of the damaged road surface, and drawing a closed ring around the damaged road surface according to the shape of the damaged road surface, wherein the closed ring surrounds the damaged road surface; (2) excavating the damaged base in the closed ring, wherein the distance between the edge of the excavated damaged base and the closed ring is 20-30 mm, and the excavation depth is up to the foundation of the damaged base; (3) manufacturing a steel ring matched with the shape of the closed ring, wherein the height of the steel ring is equivalent to the excavation depth, the steel ring is sunk to the foundation of the damaged base along the closed ring, and the upper top surface of the steel ring is 5-10 mm lower than the road surface; (4) cleaning damaged groups in the steel ring; (5) filling concrete in the steel ring and tamping; (6) laying a reinforcing steel mesh above the concrete in the steel ring; (7) welding and fixing the periphery of the reinforcing steel net and the inner wall of the steel ring; (8) pouring asphalt; and (9) compacting.

In the method for repairing a road surface according to the present invention, as a preferable embodiment, the lower end of the steel ring is provided with a blade edge.

In the road surface repairing method of the present invention, as a preferable mode, the sharp corner of the blade leg is inclined from the outer surface of the steel ring to the inner surface of the steel ring.

In the method for repairing a road surface according to the present invention, as a preferable mode, an annular flange is provided on an inner surface of the steel ring, and the annular flange is located at an upper end of the steel ring.

In the method of repairing a road surface according to the present invention, as a preferable mode, an edge of the concrete abuts against a lower surface of the annular flange.

In the pavement patching method of the invention, as a preferable technical scheme, transverse steel bars are arranged in the concrete.

In the method for repairing a road surface according to the present invention, preferably, the ends of the transverse reinforcing bars are abutted against the inner surface of the steel ring.

in the road surface repairing method of the present invention, as a preferable embodiment, in the step (6), the upper surface of the reinforcing steel net is 5 to 10 mm away from the upper top surface of the steel ring.

In the pavement repair method, as a preferable technical scheme, the concrete comprises the following materials in parts by weight: 20-35 parts of cement, 20-30 parts of sand, 28-45 parts of stones, 14-16 parts of water, 4-6 parts of calcium sulfate whiskers and 7-9 parts of organic silicon resin.

In the pavement patching method of the invention, as a further preferable technical scheme, the concrete comprises the following materials in parts by weight: 20-35 parts of cement, 20-30 parts of sand, 28-45 parts of stones, 14-16 parts of water, 4-6 parts of calcium sulfate whiskers, 7-9 parts of organic silicon resin and 0.5-1 part of sodium percarbonate.

By adopting the technical scheme, the invention has the beneficial effects that:

(1) The invention uses the steel ring to isolate the damaged base from the complete road surface, and only constructs in the steel ring, not only the construction period is short, the repaired road surface after construction has high strength and long service life, but also the service life of the adjacent road surface is not affected during construction.

(2) Because the lower extreme of steel ring is equipped with the sword foot, can make the steel ring sink fast to under the sword foot effect, can concentrate the steel ring intra-annular with the damaged base of reserving in the closed ring, make the steel ring on the one hand sink the route perpendicular to road surface, do not harm peripheral road bed, on the other hand is convenient for clear away the intra-annular damaged base of steel.

(3) Because the edge top of concrete leans on the lower surface of annular flange, is equipped with horizontal reinforcing bar in the concrete, and horizontal reinforcing bar has increased the intensity after the concrete shaping for the wholeness is stronger after the concrete shaping, and the annular flange of steel ring receives the supporting role at the edge of concrete, and the bearing capacity of steel ring also improves by a wide margin, can not sink along with ground pressure's increase and sink, has prolonged the life on repair back road surface greatly.

Drawings

Fig. 1 is a schematic structural diagram of a repaired roadbed in the embodiment of the invention;

FIG. 2 is a schematic structural diagram of a steel ring according to an embodiment of the present invention;

Wherein in fig. 1 and 2, respective numerical references refer to the following specific meanings, elements and/or components, respectively.

In the figure: 1. a steel ring; 101. a blade foot; 102. an annular flange; 2. concrete; 3. reinforcing a steel mesh; 4. asphalt; 5. and transverse reinforcing steel bars.

Detailed Description

The present invention will be described in detail with reference to specific embodiments with reference to the attached drawings, but the use and purpose of these embodiments are merely to illustrate the present invention, and the present invention is not limited to the actual scope of the present invention in any form, and the present invention is not limited to the scope of the present invention.

7页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种道路结构及其施工方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!