A kind of construction of railways fast removal equipment

文档序号:1765613 发布日期:2019-12-03 浏览:28次 中文

阅读说明:本技术 一种铁路施工用快速搬运设备 (A kind of construction of railways fast removal equipment ) 是由 周正 于 2019-09-06 设计创作,主要内容包括:本发明公开了一种铁路施工用快速搬运设备,包括机体,所述机体的底面上开设有底腔,所述底腔内铰接设有两组摆动杆,所述摆动杆的底端可以固定在底面上防止所述机体移动,所述机体的左右两侧面上均开设有滑腔,所述机体的左右两侧设有可以收纳的支撑机构,所述支撑机构包括可以滑动设置在所述滑腔内的滑块和可以升降的支座,所述支座可以支撑在地面上,使设备更加稳固,本发明可以通过吊装架可以实现自动对枕木的吊运,省去了人工将枕木搬运上车的步骤,节省了人力,通过升降台的转动,可以实现对各个方向的枕木进行吊运,且滑动板和升降台均可以收纳,减小了体积,节省了设备所占用的空间。(The invention discloses a kind of construction of railways fast removal equipment, including body, bottom cavity is offered on the bottom surface of the body, two groups of oscillating rods are hingedly equipped in the bottom cavity, the bottom end of the oscillating rod, which can be fixed on bottom surface, prevents the body mobile, sliding chamber is offered in the left and right sides of the body, the left and right sides of the body is equipped with the supporting mechanism that can be stored, the supporting mechanism includes the support that can be slidably arranged in the intracavitary sliding block of the cunning He can go up and down, the support can support on the ground, keep equipment more firm, the handling to sleeper automatically can may be implemented in the present invention by mast-up, eliminate the step of manually sleeper carrying is got on the bus, save manpower, pass through the rotation of lifting platform, it may be implemented to carry out handling to the sleeper of all directions, and sliding panel and lifting platform can be stored, Volume is reduced, the occupied space of equipment is saved.)

1. a kind of construction of railways fast removal equipment, including body, it is characterised in that: offer bottom on the bottom surface of the body Chamber is hingedly equipped with two groups of oscillating rods in the bottom cavity, and the bottom end of the oscillating rod, which can be fixed on bottom surface, prevents the body It is mobile, sliding chamber is offered in the left and right sides of the body, the left and right sides of the body is equipped with the support that can be stored Mechanism, the supporting mechanism include the support that can be slidably arranged in the intracavitary sliding block of the cunning He can go up and down, the support It can support on the ground, keep equipment more firm, supporting table is installed on the top surface of the body, is rotated in the supporting table Equipped with spline housing, the top surface internal spline of the spline housing is connected with splined shaft, the top surface of the splined shaft and the lifting The bottom surface of platform is fixed, and is embedded with first motor in the supporting table admittedly, and the top of the first motor is connected by power dynamic gear, Driven gear is installed on the periphery of the spline housing, the driven gear is engaged with the power gear, in the lifting platform Containing cavities are offered, the sliding panel that can be stored are equipped in the containing cavities, it is right that the bottom of the sliding panel is equipped with two groups of front and backs The mast-up of title, the top surface of the supporting table are equipped with the lifting column that can make the lifting of lifting table, the right side of the lifting column Equipped with the memory space that can store timber.

2. a kind of construction of railways fast removal equipment according to claim 1, it is characterised in that: the roof of the bottom cavity Interior solid embedded with storage motor, the left and right ends of the storage motor have been connected by power the first screw shaft, have been located in the bottom cavity First screw shaft periphery on be threadedly engaged and be connected with threaded block, pass through between the threaded block and the oscillating rod Connecting rod is hinged.

3. a kind of construction of railways fast removal equipment according to claim 2, it is characterised in that: the sliding block with it is described First screw shaft is threadedly engaged connection, is installed with the first hydraulic pump on the top surface of the sliding block, on the bottom surface of the sliding block It is installed with fixed column, the top section of the support is slidably arranged in the fixed column.

4. a kind of construction of railways fast removal equipment according to claim 1, it is characterised in that: the bottom of the lifting platform Interior rotation is equipped with swivel becket on face, and the top of the swivel becket and the lifting column is fixed, fixed on the top surface of the supporting table There is fixing sleeve, the lifting column is slidably arranged in the fixing sleeve, it is embedded with the second hydraulic pump in the supporting table admittedly, described the Two hydraulic pumps can control the lifting of the lifting column.

5. a kind of construction of railways fast removal equipment according to claim 1, it is characterised in that: a left side for the containing cavities Admittedly the second motor is embedded in sidewall bodies, the right end of second motor has been connected by power the second screw shaft, second screw shaft It is threadedly engaged and connect with the sliding panel.

6. a kind of construction of railways fast removal equipment according to claim 1, it is characterised in that: opened in the sliding panel Lifting motor, the front side power of the lifting motor are embedded with admittedly in line chamber, the rear wall around line chamber equipped with downward opening It is connected with horizontal axis, the symmetrical two groups of transfer rollers in front and back are installed on the periphery of the horizontal axis, are wound with wirerope on the transfer roller.

7. a kind of construction of railways fast removal equipment according to claim 6, it is characterised in that: mast-up described in two groups Top connect with the lateral Interal fixation, the top surface of the lateral steel plate is fixed with the wirerope.

8. a kind of construction of railways fast removal equipment according to claim 1, it is characterised in that: the memory space Right side opening disassembly is equipped with baffle, by baffle described in manual teardown, the timber in the memory space can be made to tumble out.

9. a kind of construction of railways fast removal equipment according to claim 1, it is characterised in that: the bottom surface of the body It is equipped with driving runner, the driving runner can drive whole device to advance.

Technical field

The present invention relates to construction of railways technical field, specially a kind of construction of railways fast removal equipment.

Background technique

Railway requires to transport sleeper, steel and sandstone etc. with haulage equipment, traditional sleeper is removed in construction It is generally all inflexible to transport sling cart, and equipment is larger, occupied space is larger, and many haulage equipments require two equipment phases Mutually cooperation, sleeper is transported on transport vehicle, very inconvenient, it is therefore necessary to and one kind is designed, space is saved, it is convenient, flexible Sleeper haulage equipment.

Summary of the invention

It is in the prior art for overcoming the purpose of the present invention is to provide a kind of construction of railways fast removal equipment State defect.

A kind of construction of railways fast removal equipment according to the present invention, including body open up on the bottom surface of the body Have a bottom cavity, be hingedly equipped with two groups of oscillating rods in the bottom cavity, the bottom end of the oscillating rod can be fixed on bottom surface prevent it is described Body is mobile, offer sliding chamber in the left and right sides of the body, and the left and right sides of the body is equipped with and can store Supporting mechanism, the supporting mechanism includes the support that can be slidably arranged in the intracavitary sliding block of the cunning He can go up and down, described Support can support on the ground, keep equipment more firm, be installed with supporting table on the top surface of the body, in the supporting table Rotation is equipped with spline housing, and the top surface internal spline of the spline housing is connected with splined shaft, the top surface of the splined shaft with it is described The bottom surface of lifting platform is fixed, and is embedded with first motor in the supporting table admittedly, the top of the first motor is connected by power dynamic Gear is installed with driven gear on the periphery of the spline housing, and the driven gear is engaged with the power gear, the lifting Containing cavities are offered in platform, the sliding panel that can be stored are equipped in the containing cavities, before the bottom of the sliding panel is equipped with two groups Symmetrical mast-up afterwards, the top surface of the supporting table are equipped with the lifting column that can make the lifting of lifting table, the lifting column Right side is equipped with the memory space that can store timber.

Further technical solution, it is solid embedded with storage motor, the left and right two of the storage motor in the roof of the bottom cavity End has been connected by power the first screw shaft, is threadedly engaged connection on the periphery of first screw shaft in the bottom cavity There is threaded block, it is hinged by connecting rod between the threaded block and the oscillating rod.

Further technical solution, the sliding block are threadedly engaged with first screw shaft and connect, the top surface of the sliding block On be installed with the first hydraulic pump, be installed with fixed column on the bottom surface of the sliding block, the top section of the support slides setting In the fixed column.

Further technical solution, interior rotation is equipped with swivel becket on the bottom surface of the lifting platform, the swivel becket with it is described The top of lifting column is fixed, and fixing sleeve is installed on the top surface of the supporting table, and the lifting column is slidably arranged in the fixation In set, the second hydraulic pump is embedded in the supporting table admittedly, second hydraulic pump can control the lifting of the lifting column.

Further technical solution is embedded with the second motor in the left side wall body of the containing cavities admittedly, second motor Right end has been connected by power the second screw shaft, and second screw shaft is threadedly engaged with the sliding panel to be connect.

Further technical solution offers in the sliding panel downward opening around line chamber, the rear wall around line chamber It is inside embedded with lifting motor admittedly, has been connected by power horizontal axis on front side of the lifting motor, front and back is installed on the periphery of the horizontal axis Symmetrical two groups of transfer rollers are wound with wirerope on the transfer roller.

Further technical solution, the top of mast-up described in two groups are connect with the lateral Interal fixation, the cross It is fixed to the top surface of steel plate with the wirerope.

The right side opening disassembly of further technical solution, the memory space is equipped with baffle, by described in manual teardown Baffle can make the timber in the memory space tumble out.

Further technical solution, the bottom surface of the body are equipped with driving runner, and the driving runner can drive whole A device is advanced.

The beneficial effects of the present invention are: the present invention can realize the fixation to whole device by oscillating rod and oscillating rod, The handling to sleeper automatically may be implemented by mast-up, eliminate the step of manually sleeper carrying is got on the bus, save manpower, By the rotation of lifting platform, may be implemented to carry out handling to the sleeper of all directions, and sliding panel and lifting platform can be stored, Volume is reduced, saves the occupied space of equipment, and the configuration of the present invention is simple, easy to operate, stable transmission is less prone to Failure, convenient for promoting.

Detailed description of the invention

Fig. 1 is overall structure diagram inside a kind of construction of railways fast removal equipment of the invention;

Fig. 2 is the schematic diagram of body part in the present invention;

Fig. 3 is the left view of mast-up in the present invention;

Fig. 4 is the top view of lifting motor of the present invention.

Specific embodiment

Below with reference to Fig. 1-4, the present invention is described in detail, for sake of convenience, now such as to hereafter described orientation regulation Under: hereafter described front-rear direction up and down is consistent with the front-rear direction up and down of Fig. 1 projection relation itself.

Referring to Fig.1-4, a kind of construction of railways fast removal equipment of embodiment according to the present invention, including body 10, Bottom cavity 46 is offered on the bottom surface of the body 10, is hingedly equipped with two groups of oscillating rods 43, the oscillating rod 43 in the bottom cavity 46 Bottom end can be fixed on bottom surface and prevent the body 10 mobile, offer sliding chamber in the left and right sides of the body 10 40, the left and right sides of the body 10 is equipped with the supporting mechanism 71 that can be stored, and the supporting mechanism 71 includes that can slide to set The support 48 setting the sliding block 38 in the sliding chamber 40 and can going up and down, the support 48 can support on the ground, make equipment It is more firm, supporting table 25 is installed on the top surface of the body 10, rotation is equipped with spline housing 20 in the supporting table 25, described The top surface internal spline of spline housing 20 is connected with splined shaft 19, the bottom surface of the top surface of the splined shaft 19 and the lifting platform 50 It is fixed, first motor 22 is embedded in the supporting table 25 admittedly, the top of the first motor 22 is connected by power dynamic gear 23, Driven gear 21 is installed on the periphery of the spline housing 20, the driven gear 21 is engaged with the power gear 23, described Containing cavities 12 are offered in lifting platform 50, are equipped with the sliding panel 14 that can be stored in the containing cavities 12, the sliding panel 14 Bottom is equipped with the symmetrical mast-up 31 in two groups of front and backs, can store timber, the top surface of the supporting table 25 on the mast-up 31 It is equipped with the lifting column 24 that the lifting platform 50 can be made to go up and down, the right side of the lifting column 24 is equipped with the storage that can store timber Space 30.

Valuably or illustratively, solid in the roof of the bottom cavity 46 to be embedded with storage motor 45, the storage motor 45 Left and right ends have been connected by power the first screw shaft 39, on the periphery of first screw shaft 39 in the bottom cavity 46 It is threadedly engaged and is connected with threaded block 41, it is hinged by connecting rod 44 between the threaded block 41 and the oscillating rod 43, by described The work for storing motor 45, allows the threaded block 41 to horizontally slip, and then the oscillating rod 43 is made to store or be unfolded.

Valuably or illustratively, the sliding block 38 is threadedly engaged with first screw shaft 39 and connect, the sliding block 38 Top surface on be installed with the first hydraulic pump 36, fixed column 47 is installed on the bottom surface of the sliding block 38, the support 48 Top section is slidably arranged in the fixed column 47, is worked by controlling first hydraulic pump 36, makes the support 48 can be with It slides up and down.

Valuably or illustratively, interior rotation is equipped with swivel becket 18, the swivel becket 18 on the bottom surface of the lifting platform 50 It is fixed with the top of the lifting column 24, fixing sleeve 26 is installed on the top surface of the supporting table 25, the lifting column 24 slides It is arranged in the fixing sleeve 26, is embedded with the second hydraulic pump 28 in the supporting table 25 admittedly, second hydraulic pump 28 can be controlled Make the lifting of the lifting column 24.

Valuably or illustratively, the second motor 11, second electricity are embedded in the left side wall body of the containing cavities 12 admittedly The right end of machine 11 has been connected by power the second screw shaft 13, and second screw shaft 13 is threadedly engaged with the sliding panel 14 and connect, By the work of second motor 11, second screw shaft 13 is rotated, and then the sliding panel 14 can be allow to receive It receives into the containing cavities 12.

Valuably or illustratively, offered in the sliding panel 14 it is downward opening around line chamber 15, it is described around line chamber 15 Rear wall in be embedded with lifting motor 33 admittedly, the front side of the lifting motor 33 has been connected by power horizontal axis 35, the horizontal axis 35 it is outer It is installed with the symmetrical two groups of transfer rollers 16 in front and back on week, is wound with wirerope 17 on the transfer roller 16.

Valuably or illustratively, the top of mast-up 31 described in two groups is fixedly connected with the lateral steel plate 32, institute Top surface and the wirerope 17 for stating lateral steel plate 32 are fixed.

Valuably or illustratively, the right side opening disassembly of the memory space 30 is equipped with baffle 29, passes through manual teardown The baffle 29 can make the timber in the memory space 30 tumble out.

Valuably or illustratively, the bottom surface of the body 10 is equipped with driving runner 27, and the driving runner 27 can be with Whole device is driven to advance.

When needing to carry sleeper, control storage motor 45 works first, rotates the first screw shaft 39, and then make sliding block 38 stretch out outside sliding chamber 40, while oscillating rod 43 is unfolded, and make the card of oscillating rod 43 on the ground, then control 36 work of the first hydraulic pump Make, moves down support 48, and then fix support 48 on the ground, keep whole device more stable, then control the second motor 11 work, rotate the second screw shaft 13, and then sliding panel 14 is made to draw containing cavities 12, and then lifting motor 33 works, and make to turn Roller 16 rotates, and then moves down mast-up 31, then manually rolls on mast-up 31 sleeper, then controls the second hydraulic pump 28 Work rises lifting column 24, and then increase lifting platform 50, and mast-up 31 is made to leave ground, then controls first motor 22 Work makes power gear 23 that driven gear 21 be driven to rotate, and then turns to lifting platform 50, facilitates the wood of different directions Material is lifted, and is pushed mast-up 31 manually, is tumbled the timber on mast-up 31 into memory space 30, when storage is empty Between sleeper in 30 when filling with, sliding block 38 can be made to be accommodated in sliding chamber 40 when whole device runs to destination, manually will gear Plate 29 removes, and pushes sleeper to drop out outside memory space 30 manually.

The beneficial effects of the present invention are: the present invention can realize the fixation to whole device by oscillating rod and oscillating rod, The handling to sleeper automatically may be implemented by mast-up, eliminate the step of manually sleeper carrying is got on the bus, save manpower, By the rotation of lifting platform, may be implemented to carry out handling to the sleeper of all directions, and sliding panel and lifting platform can be stored, Volume is reduced, saves the occupied space of equipment, and the configuration of the present invention is simple, easy to operate, stable transmission is less prone to Failure, convenient for promoting.

Those skilled in the art can define, can in the case of not departing from overall spirit of the invention and design To make the various modifications for above embodiments.It falls within the scope of protection of the present invention.Protection scheme of the invention It is subject to claims appended hereto.

7页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:轮胎吊辅助系统及控制方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类