Device capable of solving vertical transportation of materials

文档序号:1411844 发布日期:2020-03-10 浏览:33次 中文

阅读说明:本技术 一种可解决材料垂直运输的装置 (Device capable of solving vertical transportation of materials ) 是由 刘少瑜 路奎 连珍 徐永刚 秦建平 黄万里 李功绩 江旖旎 于 2019-11-22 设计创作,主要内容包括:本发明涉及一种可解决材料垂直运输的装置,属于建筑机械设备技术领域,用于解决建筑结构复杂、施工空间小无法安装塔吊的位置单元体结构的搬运问题。它包括框架平台、工字钢悬臂及配重,工字钢悬臂通过支撑结构固定,框架平台一侧设置支撑结构,另一侧设置配重;工字钢悬臂两端通过焊接的吊耳和加强钢丝绳与悬臂支架顶部连接;工字钢悬臂前端固定手拉葫芦;框架平台四角分别设置万向轮,框架平台下焊接支撑座;支撑结构由固定架和调节架垂直套接组成,其中,位于下端的固定架底端与框架平台焊接连接,位于上端的调节架与工字钢悬臂固定连接。该装置实现了在建筑结构复杂、施工空间较小或塔吊已经拆除的情况下单元体结构的搬运。(The invention relates to a device capable of solving the problem of vertical transportation of materials, belongs to the technical field of construction machinery equipment, and is used for solving the problem of carrying a unit structure at a position where a tower crane cannot be installed due to the fact that a building structure is complex and a construction space is small. The I-steel cantilever is fixed through a support structure, one side of the frame platform is provided with the support structure, and the other side of the frame platform is provided with the counterweight; two ends of the I-shaped steel cantilever are connected with the top of the cantilever support through welded lifting lugs and reinforced steel wire ropes; a chain block is fixed at the front end of the I-shaped steel cantilever; universal wheels are respectively arranged at four corners of the frame platform, and a supporting seat is welded below the frame platform; the supporting structure is formed by vertically sleeving a fixing frame and an adjusting frame, wherein the bottom end of the fixing frame at the lower end is connected with the frame platform in a welding mode, and the adjusting frame at the upper end is fixedly connected with the I-shaped steel cantilever. The device has realized the transport of cell structure under the condition that building structure is complicated, construction space is less or the tower crane has been demolishd.)

1. A device capable of solving the problem of vertical material transportation is characterized by comprising a frame platform, an I-shaped steel cantilever and a counterweight, wherein the I-shaped steel cantilever is fixed through a supporting structure, one side of the frame platform is provided with the supporting structure, and the other side of the frame platform is provided with the counterweight; two ends of the I-shaped steel cantilever are connected with the top of the cantilever support through welded lifting lugs and reinforced steel wire ropes; a chain block is fixed at the front end of the I-shaped steel cantilever; universal wheels are arranged at four corners of the frame platform respectively, and a supporting seat is welded below the frame platform; the supporting structure is formed by vertically sleeving a fixing frame and an adjusting frame, wherein the bottom end of the fixing frame at the lower end is connected with the frame platform in a welding mode, and the adjusting frame at the upper end is fixedly connected with the I-shaped steel cantilever.

2. The device for solving the problem of vertical transportation of materials in claim 1, wherein the adjusting bracket is vertically fixed on the fixing bracket, and the length of the adjusting bracket is adjusted within a range of 0-1600 mm.

3. The device for solving the problem of vertical transportation of materials according to claim 1, wherein the I-steel cantilever is fixed at an inclination of 25 °.

4. The device for solving the problem of vertical transportation of materials according to claim 1, wherein the fixing frame and the adjusting frame are respectively provided with a connecting hole, and the fixing frame and the adjusting frame are connected in a sleeved mode through a pin or a bolt.

5. The device for vertical transportation of material according to claim 1, wherein the fixed frame and the adjustable frame are made of rectangular square tubes.

6. The device for solving the problem of vertical transportation of materials according to claim 1, wherein the supporting base is a steel pipe, a jacking or a supporting square timber.

7. The device for vertical transportation of material according to claim 1, wherein said frame platform is welded from square steel tubes.

8. The device for solving the problem of vertical transportation of materials as claimed in claim 1, wherein the frame platform is formed by welding channel steel and square steel pipes, and the surface of the frame platform is coated with protective paint.

9. The device for vertical transport of material according to claim 1, characterised in that the frame platform is 4060mm long and 1100mm wide.

10. The device for solving the problem of vertical transportation of materials according to claim 1, wherein a pull rod is arranged between adjacent fixing frames.

Technical Field

The invention relates to the technical field of construction machinery equipment, in particular to a device capable of solving the problem of vertical transportation of materials.

Background

In the engineering construction process, the demand on the unit body structure is more and more increased, and the construction of the building structure is mainly completed by using the larger unit body structure. However, compared with a single member, the unit structure itself has a large volume and weight, and how to transport the unit structure to the upper layer of the building becomes a problem to be solved in the construction process. Generally, tower cranes are generally used for transportation when field conditions permit. However, the tower crane cannot be installed at a position with a complex building structure and a small construction space.

Therefore, how to realize the transportation of the unit structure under the condition that the building structure is complicated, the construction space is small or the tower crane is already dismantled is a technical problem which needs to be solved urgently by technical personnel in the field.

Disclosure of Invention

The novel device capable of solving the problem of vertical transportation of materials is provided for the carrying problem of the position unit body structure of the tower crane which is complicated in building structure and small in construction space and cannot be installed.

In order to solve the technical problems, the technical scheme of the invention is as follows:

a device capable of solving the problem of vertical material transportation comprises a frame platform, an I-shaped steel cantilever and a counterweight, wherein the I-shaped steel cantilever is fixed through a supporting structure, one side of the frame platform is provided with the supporting structure, and the other side of the frame platform is provided with the counterweight; two ends of the I-shaped steel cantilever are connected with the top of the cantilever support through welded lifting lugs and reinforced steel wire ropes; a chain block is fixed at the front end of the I-shaped steel cantilever; universal wheels are arranged at four corners of the frame platform respectively, and a supporting seat is welded below the frame platform; the supporting structure is formed by vertically sleeving a fixing frame and an adjusting frame, wherein the bottom end of the fixing frame at the lower end is connected with the frame platform in a welding mode, and the adjusting frame at the upper end is fixedly connected with the I-shaped steel cantilever.

Further, the adjusting bracket is vertically fixed on the fixing bracket, and the length adjusting range of the adjusting bracket is 0-1600 mm.

Further, the I-shaped steel cantilever is fixed in an inclined mode at an angle of 25 degrees.

Furthermore, the fixing frame and the adjusting frame are respectively provided with a connecting hole, and the fixing frame and the adjusting frame are connected in a sleeved mode through a pin or a bolt.

Furthermore, the fixing frame and the adjusting frame are both made of rectangular square tubes.

Further, the supporting seat is a steel pipe, a jacking support or a supporting square timber.

Further, the frame platform is formed by welding steel square pipes.

Furthermore, the frame platform is formed by welding channel steel and steel square pipes, and the surface of the frame platform is coated with protective paint.

Further, the frame platform is 4060mm long and 1100mm wide.

Furthermore, a pull rod is arranged between the adjacent fixing frames.

Compared with the prior art, the invention has the beneficial technical effects as follows:

(1) according to the device capable of solving the problem of vertical material transportation, the supporting structure is vertically arranged above the frame platform, the I-shaped steel cantilever is fixed above the supporting structure, the chain block is arranged at the front end of the I-shaped steel cantilever, the support above the I-shaped steel cantilever and the I-shaped steel cantilever are connected with the reinforced steel wire rope, and the universal wheel and the supporting seat are arranged below the frame platform; moreover, this bearing structure adopts and to cup joint the side pipe by two of pin or bolt fixed connection and constitute to can adjust bearing structure's alignment jig's position from top to bottom again when playing the supporting role, satisfied the requirement of not co-altitude construction, and dismantle the convenience, be convenient for transport when shifting between different building sites or place.

(2) The device capable of solving the problem of vertical material transportation provided by the invention adopts the vertical main body supporting structure, and compared with inclined support, the device can meet the construction height, effectively save the occupied area of a horizontal field, and is more beneficial to conveying construction materials to a high-rise building in a field with smaller space.

(3) According to the device capable of solving the problem of vertical material transportation, the frame platform is supported by the vertical supporting structure, and compared with a traditional single-arm crane which adopts inclined supports, the device can effectively avoid the influence of the height and thickness of the parapet wall on a hoisting system. Moreover, the device can adjust the hoisting height, has simple and practical structure and convenient movement, has better flexibility than a crane and a tower crane, and changes the defects of the existing hoisting method. The device is matched with other hoisting methods for use, so that the hoisting and outdoor installation problems of the special-shaped structural unit body or the large-volume square steel can be solved.

Drawings

Fig. 1 is a schematic structural diagram of an apparatus for vertical transportation of materials according to an embodiment of the present invention.

In the figure:

1-a frame platform; 2-an i-steel cantilever; 3-counterweight; 4-lifting lugs; 5-reinforcing the steel wire rope; 6-cantilever support; 7-chain block; 8-a pull rod; 9-universal wheels; 10-a support seat; 11-a fixing frame; 12-adjusting frame.

Detailed Description

The present invention will be described in detail with reference to the accompanying drawings and embodiments, wherein the apparatus and method for vertical transportation of materials is provided. Advantages and features of the present invention will become apparent from the following description and from the claims. It is to be noted that the drawings are in a very simplified form and are not to precise scale, which is merely for the purpose of facilitating and distinctly claiming the embodiments of the present invention. For convenience of description, the directions of "up" and "down" described below are the same as the directions of "up" and "down" in the drawings, but this is not a limitation of the technical solution of the present invention.

The structural components of the device for vertical transportation of materials according to the present invention will be described in detail with reference to fig. 1.

6页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种履带式起重机门型架

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类