A kind of construction engineering cost teaching demonstration method

文档序号:1743347 发布日期:2019-11-26 浏览:21次 中文

阅读说明:本技术 一种建筑工程造价教学演示方法 (A kind of construction engineering cost teaching demonstration method ) 是由 夏占国 夏雨寒 朱朝旭 周毅英 杨文玲 于 2019-08-28 设计创作,主要内容包括:本发明公开了一种建筑工程造价教学演示方法,包括如下步骤:首先,在项目公示网上获取已经完成的项目,得到该已经完成的项目的各阶段进度以及各个阶段的进度所对应的造价信息;其次,根据用户选择的要演示的项目和该项目要演示的阶段的信息,将该项目的在该阶段的进度通过三维视图显示给用户;再次,用户根据该项目在该阶段的三维视图进行该阶段工程造价的评估;最后,将用户录入的工程造价的数值信息与该项目在该阶段实际的工程造价的数值信息进行对比,得到两者之间的差值反馈给用户。本发明通过将实际的工程以虚拟的技术手段展示给学生,在根据该具体工程进行造价,使得在教学的过程中,具体的实例更加贴近于实际。(The invention discloses a kind of construction engineering cost teaching demonstration method, include the following steps: to obtain cost information corresponding to each stage progress and the progress in each stage of the project completed firstly, obtain the project completed on the net in project publicity;Secondly, the progress at this stage of the project is shown to user by 3-D view according to the project to be demonstrated and the information in the stage to be demonstrated of the project of user's selection;Again, user carries out the assessment of the stage project cost according to the 3-D view of the project at this stage;Finally, the numerical information of the numerical information of the project cost of user's typing and the project actual project cost at this stage is compared, the difference obtained between the two feeds back to user.The present invention is carrying out cost according to the concrete engineering, so that specific example is more close to reality during teaching by the way that actual engineering is showed student with virtual technological means.)

1. a kind of construction engineering cost teaching demonstration method, which comprises the steps of:

S1: obtaining the project completed in project publicity on the net, obtain the project completed each stage progress and Cost information corresponding to the progress in each stage, and receive the project to be demonstrated and the rank to be demonstrated of the project of user's selection The information of section;

S2: according to the project to be demonstrated and the information in the stage to be demonstrated of the project of user's selection, by the project in the rank The progress of section constructs the 3-D view of the project at this stage by the means of three-dimensional simulation, and 3-D view is shown to use Family;

S3: user carries out the assessment of the stage project cost according to the 3-D view of the project at this stage, and by the number of assessment Value information carries out typing;

S4: by the numerical information of the numerical information of the project cost of user's typing and the project actual project cost at this stage It compares, the difference obtained between the two feeds back to user.

2. a kind of construction engineering cost teaching demonstration method as described in claim 1, which is characterized in that in step sl, packet Include following steps:

S1-1: the project of publicity is obtained on the net in project publicity;

S1-2: by being split according to each stage of publicity of project obtained in step S1-1, the public affairs in each stage are obtained Show content;

S1-3: the cost information in the publicity content in each stage is extracted respectively;

S1-4: the stage to be demonstrated in the project to be demonstrated and the project of user's selection is received.

3. a kind of construction engineering cost teaching demonstration method as claimed in claim 2, which is characterized in that in step S1-2, According to being split for each stage of publicity, include the following steps:

S1-2-1: the publicity full text of publicity project is extracted;

S1-2-2: being retrieved in the full text of publicity according to the keyword of setting, and marks the position of the keyword retrieved;

S1-2-3: separator is set in the top of the position for the keyword that label retrieves;

S1-2-4: interception segmentation is carried out in the position of separator, each stage of the publicity after being divided.

4. a kind of construction engineering cost teaching demonstration method as described in claim 1, which is characterized in that in step s 2, packet Include following steps:

S2-1: the stage to be demonstrated in the project to be demonstrated and the project of user's selection, and being somebody's turn to do according to the project are received Stage extracts the progress msg of the project at this stage;

S2-2: it is searched in three-dimensional modeling data storehouse according to the progress msg in the stage obtained in step S2-1 and is believed with the project Cease corresponding 3-D view;

S2-3: the 3-D view found is shown to user by way of threedimensional model;

Three-dimensional corresponding to each progress msg and each progress msg of the three-dimensional modeling data storehouse for stored items View.

5. a kind of construction engineering cost teaching demonstration method as described in claim 1, which is characterized in that in step s 4, packet Include following steps:

S4-1: the numerical value of the numerical information of the project cost of user's typing and the project actual project cost at this stage is believed Breath carries out the conversion of format, is allowed to be converted into the numerical value of format;

S4-2: by the numerical information of the project cost of user's typing after conversion and the project actual project cost at this stage Numerical information carry out the ratio that division arithmetic both obtains;

S4-3: by properly converting for the ratio both obtained in step S4-2, and giving after conversion as the result is shown is used Family.

Technical field

The present invention relates to teaching demonstration method and technology field, in particular to a kind of construction engineering cost teaching demonstration method.

Background technique

Construction engineering cost generally refers to carry out the expense that a certain engineering construction is spent, i.e., from establishing final acceptance of construction Full payment used in handing over.It is taken by building installation engineering, equipment Work tool purchase commodity, and engineering construction is other to take and reserve fund And tax composition.

The course for having opened up construction engineering cost profession in the course of university now, can turn out to engineering in this way The relevant professional of cost technical field.But in the teaching of project cost, by the way that a specific engineering pair can be passed through Student explains, and the engineering mostly demonstrated in teaching is all that teacher is imagined, thus can be with reality Engineering there are some differences.It is also resulted in when demonstration in this way, cost cannot be carried out according to true situation meeting engineering.

Summary of the invention

The purpose of the present invention is overcoming above-mentioned problems of the prior art, a kind of construction engineering cost teaching is provided and is drilled Show method, by the way that actual engineering is showed student with virtual technological means, cost is being carried out according to the concrete engineering, is being made It obtains during teaching, specific example is more close to reality.

For this purpose, the present invention provides a kind of construction engineering cost teaching demonstration method, include the following steps:

S1: obtaining the project completed in project publicity on the net, obtains each stage progress of the project completed And cost information corresponding to the progress in each stage, and the project to be demonstrated for receiving user's selection will be demonstrated with the project Stage information;

S2: according to the project to be demonstrated and the information in the project stage to be demonstrated of user's selection, which is existed The progress in the stage constructs the 3-D view of the project at this stage by the means of three-dimensional simulation, and 3-D view is shown to User;

S3: user carries out the assessment of the stage project cost according to the 3-D view of the project at this stage, and will assessment Numerical information carry out typing;

S4: by the numerical value of the numerical information of the project cost of user's typing and the project actual project cost at this stage Information compares, and the difference obtained between the two feeds back to user.

Further, in step sl, include the following steps:

S1-1: the project of publicity is obtained on the net in project publicity;

S1-2: by being split according to each stage of publicity of project obtained in step S1-1, each stage is obtained Publicity content;

S1-3: the cost information in the publicity content in each stage is extracted respectively;

S1-4: the stage to be demonstrated in the project to be demonstrated and the project of user's selection is received.

Further, in step S1-2, according to being split for each stage of publicity, include the following steps:

S1-2-1: the publicity full text of publicity project is extracted;

S1-2-2: being retrieved in the full text of publicity according to the keyword of setting, and marks the keyword retrieved Position;

S1-2-3: separator is set in the top of the position for the keyword that label retrieves;

S1-2-4: interception segmentation is carried out in the position of separator, each stage of the publicity after being divided.

Further, in step s 2, include the following steps:

S2-1: the stage to be demonstrated in the project to be demonstrated and the project of user's selection is received, and according to the project The stage extract the progress msg of the project at this stage;

S2-2: it is searched in three-dimensional modeling data storehouse according to the progress msg in the stage obtained in step S2-1 and this The corresponding 3-D view of mesh information;

S2-3: the 3-D view found is shown to user by way of threedimensional model;

Corresponding to each progress msg and each progress msg of the three-dimensional modeling data storehouse for stored items 3-D view.

Further, in step s 4, include the following steps:

S4-1: by the number of the numerical information of the project cost of user's typing and the project actual project cost at this stage Value information carries out the conversion of format, is allowed to be converted into the numerical value of format;

S4-2: by the numerical information of the project cost of user's typing after conversion and the project actual engineering at this stage The numerical information of cost carries out division arithmetic and obtains the ratio of the two;

S4-3: by properly converting for the ratio both obtained in step S4-2, and by after conversion as the result is shown To user.

A kind of construction engineering cost teaching demonstration method provided by the invention, has the following beneficial effects:

1, it by the way that actual engineering is showed student with virtual technological means, is made according to the concrete engineering Valence, so that specific example is more close to reality during teaching.

Detailed description of the invention

Fig. 1 is a kind of flow diagram of construction engineering cost teaching demonstration method provided by the invention;

Fig. 2 is that the specific process in a kind of step S1 of construction engineering cost teaching demonstration method provided by the invention is shown It is intended to;

Fig. 3 is the specific process in a kind of step S1-2 of construction engineering cost teaching demonstration method provided by the invention Schematic diagram;

Fig. 4 is that the specific process in a kind of step S2 of construction engineering cost teaching demonstration method provided by the invention is shown It is intended to;

Fig. 5 is that the specific process in a kind of step S4 of construction engineering cost teaching demonstration method provided by the invention is shown It is intended to.

Specific embodiment

With reference to the accompanying drawing, the specific embodiment of the present invention is described in detail, it is to be understood that of the invention Protection scope be not limited by the specific implementation.

It is known in those skilled in the art without specific number of element types and structure in present specification The prior art, those skilled in the art can set according to the needs of actual conditions, in the embodiment of present specification Specific restriction is not done.