Rapid repair structure for municipal road and construction method

文档序号:1901344 发布日期:2021-11-30 浏览:21次 中文

阅读说明:本技术 一种市政道路快速修补结构及施工方法 (Rapid repair structure for municipal road and construction method ) 是由 夏英志 王海恩 赵大伟 李梓豪 付永胜 马桂杰 林占锋 廉书凯 于 2021-09-24 设计创作,主要内容包括:本发明涉及一种市政道路快速修补结构及施工方法。该市政道路快速修补结构包括混凝土路面本体以及修补块,所述混凝土路面本体上开设有修补槽,所述修补槽的底部设有若干个倒U形钢筋,所述钢筋的两端分别插装在所述修补槽底部,所述修补槽的一侧壁上设有若干个成排布置的插孔,所述修补块的厚度等于所述倒U形钢筋的上侧面与所述混凝土路面本体上侧面之间的距离,所述修补块上预埋有若干个与所述插孔一一插装配合的钢板。相比于现有技术,本发明的市政道路快速修补结构及施工方法施工时间短,修补效率高,修补效果好,修补后的混凝土市政路面强度高。(The invention relates to a municipal road rapid repairing structure and a construction method. This structure is repaired fast to town road includes concrete pavement body and repairs the piece, the repair groove has been seted up on the concrete pavement body, the bottom of repairing the groove is equipped with a plurality of bar of falling the U-shaped, the both ends cartridge respectively of reinforcing bar is in repair groove bottom, be equipped with the jack that a plurality of in bank was arranged on repairing a lateral wall in groove, the thickness of repairing the piece equals the last side of bar of falling the U-shaped with distance between the side on the concrete pavement body, pre-buried on repairing the piece have a plurality of with jack one-by-one cartridge complex steel sheet. Compared with the prior art, the municipal road rapid repairing structure and the construction method have the advantages of short construction time, high repairing efficiency, good repairing effect and high strength of the repaired concrete municipal road surface.)

1. The utility model provides a structure is repaired fast to town road which characterized in that: including the concrete pavement body and repair the piece, the repair groove has been seted up on the concrete pavement body, the bottom of repairing the groove is equipped with the U-shaped reinforcing bar of a plurality of, the both ends cartridge respectively of reinforcing bar is in repair tank bottom portion, be equipped with the jack that a plurality of in bank was arranged on repairing a lateral wall in groove, the thickness of repairing the piece equals the last side of U-shaped reinforcing bar with distance between the side on the concrete pavement body, pre-buried on the repair piece have a plurality of with jack one-by-one cartridge complex steel sheet.

2. The municipal road rapid repair structure according to claim 1, wherein: the inverted U-shaped steel bars are arranged in rows, the jacks are rectangular holes, and the steel plates are of rectangular structures matched with the jacks.

3. The municipal road rapid repair structure according to claim 2, wherein: the repairing groove is a rectangular groove, the repairing block is a rectangular block, the length of the repairing block is equal to that of the rectangular groove, and the width of the repairing block is smaller than that of the rectangular groove.

4. A municipal road rapid repairing method is characterized in that: the method comprises the following steps:

(S1) cutting a repair groove at the damaged position of the concrete pavement by using a slotting machine;

(S2) forming a plurality of pairs of mounting holes in the bottom of the repairing groove by using punching equipment, and inserting inverted U-shaped reinforcing steel bars into each pair of mounting holes;

(S3) using punching equipment to form a plurality of jacks arranged in rows on the wall of the repairing groove;

(S4) prefabricating a repairing block, wherein a plurality of steel plates are prefabricated in the repairing block, the repairing block is placed in a repairing groove, the steel plates on the repairing block are inserted into the inserting holes one by one, the lower side surfaces of the steel plates are supported on the inverted U-shaped steel bars, and the upper side surfaces of the steel plates are coplanar with the upper side surface of the concrete pavement;

(S5) respectively pouring concrete between the repairing block and the groove bottom of the repairing groove and between the repairing block and the groove wall of the repairing groove.

5. The municipal road rapid repair method according to claim 4, wherein: and inserting the reinforcing steel bars into the mounting holes, and fixing the reinforcing steel bars by using concrete.

6. The municipal road rapid repair method according to claim 5, wherein: the repairing groove is of a rectangular structure, the repairing block is a rectangular block, the length of the repairing block is equal to that of the rectangular groove, and the width of the repairing block is smaller than that of the rectangular groove.

7. The method of claim 6 for the rapid repair of town roads comprising: the reinforcing steel bars are arranged in rows in the length direction of the repairing groove, and the jacks are arranged in rows in the length direction of the repairing groove.

Technical Field

The invention belongs to the technical field of pavement construction, and particularly relates to a municipal road rapid repairing structure and a construction method.

Background

The concept of "sponge city" was first proposed in "2012 low carbon city and regional development science and technology forum". The sponge city means that the city can rapidly permeate into the ground when raining like a sponge, can release the water stored in rainy seasons when dry, and solves the urban problem through city self-regulation.

The construction of a sponge city can not be separated from a sponge body. The urban land features conforming to the characteristics of the sponge body comprise water systems such as rivers, lakes and the like, and urban supporting facilities such as green belts, gardens, permeable ground and the like. Rainwater falls onto the sponge body and can quickly seep to the ground, and the natural ground surface has the functions of storing, purifying and recycling the rainwater, so that various urban diseases are reduced. The permeable road pavement is an important measure in sponge city construction, and covers urban roads, urban green land and square roads, residential road, urban road and other urban roads at all levels. Due to the particularity of the permeable pavement structure, the characteristics of the structure and the material of the permeable pavement structure are greatly different from those of the original road pavement. In the process of research on water permeable pavement, the state issues technical specifications of water permeable brick pavement, water permeable asphalt pavement, water permeable cement concrete pavement and the like in succession, and can guide the construction of water permeable pavement of urban roads to a certain extent.

The pervious concrete is developed and used by countries such as Europe, America, Japan and the like aiming at the defects of the road surface of the original urban road, can make rainwater flow into the ground, effectively supplements the ground water, and relieves some urban environmental problems such as rapid decline of the underground water level of the city and the like. And can effectively eliminate the harm of oil compounds on the ground and the like to the environmental pollution; meanwhile, the material is an excellent paving material which can protect underground water, maintain ecological balance and relieve urban heat island effect; it is beneficial to the benign development of human living environment, the management of urban rainwater, the prevention and treatment of water pollution and the like, and has special significance.

During the use of the concrete road, due to the influence of factors such as climate or geology, the road surface can crack, and the smoothness of vehicles running on the road surface can be seriously influenced after the road surface cracks. At present, the method for repairing the concrete pavement mostly pours new concrete at the crack of the pavement, and in order to ensure the stability of the newly added concrete and ensure that the crack can be filled with the new concrete, the adding amount of the asphalt concrete is often larger than the volume of the crack in the construction and repair process, so that the concrete forms a bulge on the originally flat pavement, the concrete pavement is uneven, and certain potential safety hazards exist.

Disclosure of Invention

In order to achieve the purpose, the invention provides a municipal road rapid repairing structure and a construction method.

The invention discloses a technical scheme of a municipal road rapid repairing structure, which comprises the following steps:

the utility model provides a structure is repaired fast to town road, includes concrete pavement body and repairs the piece, the repair groove has been seted up on the concrete pavement body, the bottom in repair groove is equipped with a plurality of bar of falling the U-shaped, the both ends cartridge respectively of reinforcing bar is in repair groove bottom portion, be equipped with the jack that a plurality of in bank was arranged on a lateral wall in repair groove, the thickness of repairing the piece equals the side of going up of the bar of falling the U-shaped with distance between the side on the concrete pavement body, repair pre-buried on the piece have a plurality of with jack one-by-one cartridge complex steel sheet.

As a further improvement to the technical scheme, the inverted U-shaped steel bars are arranged in rows, the jacks are rectangular holes, and the steel plates are of rectangular structures matched with the jacks.

As a further improvement to the above technical solution, the repair groove is a rectangular groove, the repair block is a rectangular block, the length of the repair block is equal to the length of the rectangular groove, and the width of the repair block is smaller than the width of the rectangular groove.

The invention discloses a technical scheme of a municipal road rapid repairing method, which comprises the following steps:

a municipal road rapid repairing method comprises the following steps:

(S1) cutting a repair groove at the damaged position of the concrete pavement by using a slotting machine;

(S2) forming a plurality of pairs of mounting holes in the bottom of the repairing groove by using punching equipment, and inserting inverted U-shaped reinforcing steel bars into each pair of mounting holes;

(S3) using punching equipment to form a plurality of jacks arranged in rows on the wall of the repairing groove;

(S4) prefabricating a repairing block, wherein a plurality of steel plates are prefabricated in the repairing block, the repairing block is placed in a repairing groove, the steel plates on the repairing block are inserted into the inserting holes one by one, the lower side surfaces of the steel plates are supported on the inverted U-shaped steel bars, and the upper side surfaces of the steel plates are coplanar with the upper side surface of the concrete pavement;

(S5) respectively pouring concrete between the repairing block and the groove bottom of the repairing groove and between the repairing block and the groove wall of the repairing groove.

As a further improvement to the above technical solution, after the reinforcing steel bars are inserted into the mounting holes, the reinforcing steel bars are fixed by using concrete.

As a further improvement to the above technical solution, the repairing groove has a rectangular structure, the repairing block is a rectangular block, the length of the repairing block is equal to the length of the rectangular groove, and the width of the repairing block is smaller than the width of the rectangular groove.

As a further improvement to the above technical solution, the reinforcing bars are arranged in rows in the length direction of the repair groove, and the insertion holes are arranged in rows in the length direction of the repair groove.

The invention provides a municipal road rapid repairing structure and a construction method, compared with the prior art, the municipal road rapid repairing structure has the following beneficial effects:

according to the municipal road rapid repairing structure and the construction method, the repairing groove and the prefabricated repairing block are arranged on the concrete damaged pavement, so that the repairing time of the concrete municipal road is greatly shortened. In addition, an inverted U-shaped steel bar is arranged at the bottom of the repairing groove, and a jack is arranged on the wall of the repairing groove, so that a steel plate matched with the jack is prefabricated in the repairing block; concrete is poured between the repairing blocks and the repairing grooves, so that the structural strength of the repaired concrete municipal road is enhanced. Compared with the prior art, the municipal road rapid repairing structure and the construction method have the advantages of short construction time, high repairing efficiency, good repairing effect and high strength of the repaired concrete municipal road surface.

Drawings

FIG. 1 is a first schematic structural view of the municipal road quick repair structure of the invention;

FIG. 2 is a schematic structural view of a concrete pavement body in the municipal rapid repair structure of the invention;

FIG. 3 is a schematic view of the construction of the patch in the town road quick-repair structure of the present invention;

FIG. 4 is a flow chart of the municipal road quick repair method of the invention.

In the figure; 1. a concrete pavement body; 2. repairing the groove; 3. reinforcing steel bars; 4. a jack; 5. repairing the block; 6. and (3) a steel plate.

Detailed Description

The following detailed description of embodiments of the present invention is provided in connection with the accompanying drawings and examples. The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention.

The concrete embodiment of the municipal road rapid repair structure comprises a concrete pavement body 1 and repair blocks 5, wherein a repair groove 2 is formed in the concrete pavement body 1, a plurality of inverted-U-shaped steel bars 3 are arranged at the bottom of the repair groove 2, two ends of the steel bars 3 are respectively inserted into the bottom of the repair groove 2, a plurality of insertion holes 4 arranged in rows are formed in one side wall of the repair groove 2, the thickness of each repair block 5 is equal to the distance between the upper side surface of each inverted-U-shaped steel bar 3 and the upper side surface of the concrete pavement body 1, and a plurality of steel plates 6 which are inserted into the insertion holes 4 in a one-to-one mode are embedded in each repair block 5.

In this embodiment, the inverted U-shaped reinforcing bars 3 are arranged in rows, the insertion holes 4 are rectangular holes, and the steel plate 6 has a rectangular structure matched with the insertion holes 4.

In this embodiment, the repairing groove 2 is a rectangular groove, the repairing block 5 is a rectangular block, the length of the repairing block 5 is equal to the length of the rectangular groove, and the width of the repairing block 5 is smaller than the width of the rectangular groove.

According to the municipal road rapid repairing structure and the construction method, the repairing groove 2 and the prefabricated repairing block 5 are arranged on the concrete damaged pavement, so that the repairing time of the concrete municipal road is greatly shortened. In addition, an inverted U-shaped reinforcing steel bar 3 is arranged at the bottom of the repairing groove 2, a jack 4 is arranged on the groove wall of the repairing groove 2, and a steel plate 6 matched with the jack 4 is prefabricated in the repairing block 5; concrete is poured between the repairing blocks 5 and the repairing grooves 2, so that the structural strength of the repaired concrete municipal road is enhanced. Compared with the prior art, the municipal road rapid repairing structure and the construction method have the advantages of short construction time, high repairing efficiency, good repairing effect and high strength of the repaired concrete municipal road surface.

The specific embodiment of the rapid repair method for the municipal road disclosed by the invention comprises the following steps as shown in FIG. 4:

(S1) cutting a repair groove at the damaged position of the concrete pavement by using a slotting machine;

(S2) forming a plurality of pairs of mounting holes in the bottom of the repairing groove by using punching equipment, and inserting inverted U-shaped reinforcing steel bars into each pair of mounting holes;

(S3) using punching equipment to form a plurality of jacks arranged in rows on the wall of the repairing groove;

(S4) prefabricating a repairing block, wherein a plurality of steel plates are prefabricated in the repairing block, the repairing block is placed in a repairing groove, the steel plates on the repairing block are inserted into the inserting holes one by one, the lower side surfaces of the steel plates are supported on the inverted U-shaped steel bars, and the upper side surfaces of the steel plates are coplanar with the upper side surface of the concrete pavement;

(S5) respectively pouring concrete between the repairing block and the groove bottom of the repairing groove and between the repairing block and the groove wall of the repairing groove.

In this embodiment, after the reinforcing steel bar is inserted into the mounting hole, the reinforcing steel bar is fixed by using concrete.

In this embodiment, the repairing groove is a rectangular structure, the repairing block is a rectangular block, the length of the repairing block is equal to the length of the rectangular groove, and the width of the repairing block is smaller than the width of the rectangular groove.

In this embodiment, the reinforcing bars are arranged in rows in the length direction of the repair groove, and the insertion holes are arranged in rows in the length direction of the repair groove.

According to the municipal road rapid repairing structure and the construction method, the repairing groove and the prefabricated repairing block are arranged on the concrete damaged pavement, so that the repairing time of the concrete municipal road is greatly shortened. In addition, an inverted U-shaped steel bar is arranged at the bottom of the repairing groove, and a jack is arranged on the wall of the repairing groove, so that a steel plate matched with the jack is prefabricated in the repairing block; concrete is poured between the repairing blocks and the repairing grooves, so that the structural strength of the repaired concrete municipal road is enhanced. Compared with the prior art, the municipal road rapid repairing structure and the construction method have the advantages of short construction time, high repairing efficiency, good repairing effect and high strength of the repaired concrete municipal road surface.

The above description is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and substitutions can be made without departing from the technical principle of the present invention, and these modifications and substitutions should also be regarded as the protection scope of the present invention.