Fluid remaining amount management device, analysis system, fluid remaining amount management method, and fluid remaining amount management program

文档序号:884035 发布日期:2021-03-19 浏览:14次 中文

阅读说明:本技术 流体剩余量管理装置、分析系统、流体剩余量管理方法及流体剩余量管理程序 (Fluid remaining amount management device, analysis system, fluid remaining amount management method, and fluid remaining amount management program ) 是由 增田真吾 于 2018-08-07 设计创作,主要内容包括:分析系统包括一个或多个分析装置以及流体剩余量管理装置。一个或多个分析装置使用从作为流体源的储气瓶供给的流体进行分析。流体剩余量管理装置包括预定使用量预测部和剩余量不足时期判定部。预定使用量预测部预测在当前时间点以后在一个或多个分析装置中使用的流体的预定使用量的推移。剩余量不足时期判定部基于预测出的预定使用量的推移,来判定各储气瓶的流体的剩余量不足的剩余量不足时期。(The analysis system includes one or more analysis devices and a fluid residual amount management device. One or more analysis devices perform analysis using fluid supplied from a gas cylinder as a fluid source. The fluid remaining amount management device includes a predetermined usage amount prediction unit and a remaining amount shortage time determination unit. The predetermined usage amount prediction unit predicts a transition of a predetermined usage amount of the fluid used in the one or more analysis devices after the current time point. The remaining amount shortage time determination unit determines the remaining amount shortage time when the remaining amount of the fluid in each cylinder is insufficient, based on the predicted transition of the predetermined usage amount.)

1. A fluid residual amount management device for managing a residual amount of a fluid in a fluid source that supplies the fluid to one or more analysis devices, the fluid residual amount management device comprising:

a prediction unit that predicts a transition of a predetermined usage amount of the fluid used in the one or more analysis devices after a current time point; and

and a determination unit that determines a remaining amount shortage timing when the remaining amount of the fluid in the fluid source is short, based on the transition of the predetermined usage amount predicted by the prediction unit.

2. The fluid residual amount managing device according to claim 1,

the fluid supply device further includes a notification unit that notifies a warning indicating that the fluid supply should be replaced at a time earlier than the remaining amount shortage time determined by the determination unit.

3. The fluid residual amount managing device according to claim 1 or 2,

the prediction unit predicts a transition of the predetermined usage amount based on a change in the usage amount of the past fluid related to the one or more analysis devices.

4. A fluid residual amount managing device according to any one of claims 1 to 3,

the prediction unit predicts a transition of the predetermined usage amount based on an analysis schedule of each of the one or more analysis devices.

5. The fluid remainder managing device according to any one of claims 1 to 4,

the notification unit notifies the warning at a timing earlier than a specific timing when the remaining amount shortage timing determined by the determination unit is within the specific timing.

6. The fluid residual amount management device according to any one of claims 1 to 5, further comprising:

a first setting unit that sets priorities for a plurality of analysis schedules of the one or more analysis apparatuses; and

a first changing unit that changes the execution timing of at least a part of the analysis schedule so that the remaining amount shortage timing is out of the specific timing, based on the priority set by the first setting unit.

7. The fluid residual amount management device according to any one of claims 1 to 6, further comprising:

a second setting unit that sets priorities for the plurality of analysis devices, respectively; and

and a second changing unit that changes an operation timing of at least a part of the analysis device so that the remaining amount shortage timing is out of the specific timing, based on the priority set by the second setting unit.

8. An analysis system is provided with:

one or more analysis devices that perform analysis using fluid supplied from a fluid source; and

the fluid residual amount managing device according to any one of claims 1 to 7, which manages a residual amount of fluid in the fluid source.

9. A fluid residual amount management method for managing a residual amount of a fluid in a fluid source that supplies the fluid to one or more analysis devices, the fluid residual amount management method comprising the steps of:

predicting a passage of a predetermined usage amount of fluid used in the one or more analysis devices after a current point in time; and

determining a remaining amount shortage period when the remaining amount of the fluid source is insufficient based on the predicted transition of the predetermined usage amount.

10. The fluid residual amount managing method according to claim 9,

further comprising a notification step of notifying a warning indicating that the fluid source should be replaced at a time earlier than the remaining amount shortage time determined by the determination unit.

11. The fluid residual amount managing method according to claim 10,

the notifying step includes the steps of: in a case where the determined remaining amount shortage period is within a specific period, the warning is notified at a period earlier than the specific period.

12. A fluid remaining amount management program for managing a remaining amount of a fluid in a fluid source that supplies the fluid to one or more analysis devices, the fluid remaining amount management program causing a computer to execute the steps of:

predicting a passage of a predetermined usage amount of fluid used in the one or more analysis devices after a current point in time; and

determining a remaining amount shortage period when the remaining amount of the fluid source is insufficient based on the predicted transition of the predetermined usage amount.

Technical Field

The present invention relates to a fluid remaining amount management device for managing a remaining amount of a fluid in a fluid source, an analysis system using the fluid remaining amount management device, a fluid remaining amount management method, and a fluid remaining amount management program.

Background

Various analysis devices for performing analysis using a fluid such as a gas or a liquid are being used. For example, patent document 1 describes a gas chromatograph and a fluid control device used for the gas chromatograph. In a gas chromatograph, a sample gas is supplied into a column together with a carrier gas to perform analysis. The flow control device controls the supply of carrier gas to the column. As the carrier gas, He (helium gas) is used, for example. In this case, a gas bomb for storing He is connected to the gas chromatograph.

Documents of the prior art

Patent document

Patent document 1: japanese patent laid-open publication No. 2016-57148

Disclosure of Invention

Problems to be solved by the invention

In a gas chromatograph, if the column is at a high temperature in a state where no gas flows through the column, destruction of the liquid phase occurs. Therefore, in the fluid control device having the gas supply pressure sensor, the temperature control is stopped after an error occurs before the gas in the gas cylinder is insufficient based on the supply pressure detected by the supply pressure sensor. Thereby, the column is protected.

However, in the fluid control device having no supply pressure sensor, a decrease in the supply pressure of the gas cannot be detected. For example, when the detector of the gas chromatograph is a hydrogen Flame Ionization Detector (FID) or a Flame Thermionic Detector (FTD) (Japanese: フレームサーミオニック detector), gas is supplied to the detector. Generally, a supply pressure sensor is not provided in a fluid control device for a detector. Therefore, it is impossible to predict that the analysis of the gas chromatograph is stopped due to the shortage of the gas to be supplied to the detector.

The pressure of the gas in the cylinder is reduced by a pressure regulator and then supplied to the gas chromatograph. Thus, the pressure detected by the supply pressure sensor is the pressure of the gas supplied to the gas chromatograph, not the pressure (residual pressure) of the gas remaining in the cylinder. Therefore, it is difficult to recognize the tendency of the remaining amount in the gas cylinder based on the pressure detected by the supply pressure sensor.

Further, depending on the number of gas chromatographs connected to one gas cylinder, the time from the occurrence of an error due to a decrease in the supply pressure detected by each supply pressure sensor until the remaining amount of gas in the gas cylinder becomes insufficient differs. When a plurality of gas chromatographs are connected to one gas bomb, the shortage of gas may occur immediately after an error occurs due to a decrease in supply pressure. As a result, the column is sometimes not protected in time.

Further, depending on the type of gas stored in the gas cylinder, it may be difficult to install an electrical system including a sensor or the like in the gas cylinder.

Such a problem is not limited to a gas chromatograph, but may occur in other analysis devices using a fluid such as a gas or a liquid.

The present invention aims to provide a fluid remaining amount management device, an analysis system using the same, a fluid remaining amount management method, and a fluid remaining amount management program, which can determine the shortage timing of the remaining amount of fluid in a fluid source regardless of the number of analysis devices connected to the fluid source without directly detecting the remaining amount of fluid in the fluid source.

Means for solving the problems

(1) A remaining fluid amount management device according to an aspect of the present invention is a fluid amount management device for managing a remaining amount of a fluid in a fluid source that supplies the fluid to one or more analysis devices, the device including: a prediction unit that predicts a transition of a predetermined usage amount of fluid used in one or more analysis devices after a current time point; and a determination unit that determines a remaining amount shortage timing when the remaining amount of the fluid in the fluid source is short, based on the transition of the predetermined usage amount predicted by the prediction unit.

According to the fluid remaining amount management device, transition of a scheduled usage amount of fluid used in one or more analysis devices after a current time point is predicted, and a remaining amount shortage time is determined based on the predicted transition of the scheduled usage amount. Thus, the remaining amount of the fluid in the fluid source is not directly detected, and the shortage time of the remaining amount of the fluid in the fluid source can be determined regardless of the number of the analyzers connected to the fluid source. As a result, the fluid source can be replaced before the remaining amount of the fluid in the fluid source becomes insufficient, and therefore, the analysis of the analyzer can be prevented from being stopped.

(2) The fluid remaining amount management device may further include a notification unit that notifies a warning indicating that the fluid source should be replaced at a time earlier than the remaining amount shortage time determined by the determination unit. In this case, the user is prompted to replace the fluid source. Thus, the user can replace the fluid source before the remaining amount of fluid of the fluid source is insufficient. Therefore, it is possible to prevent the analysis from being stopped due to the shortage of the remaining amount of the fluid.

(3) The prediction unit may predict the transition of the predetermined usage amount based on a change in the usage amount of the past fluid related to one or more analysis devices. In this case, the transition of the predetermined usage amount can be easily predicted.

(4) The prediction unit may predict the transition of the predetermined usage amount based on an analysis schedule of each of the one or more analysis devices. In this case, the transition of the predetermined usage amount can be predicted relatively accurately.

(5) The notification unit may notify the warning at a timing earlier than the bit timing when the remaining amount shortage determined by the determination unit is within the specific period. In this case, when it is difficult to replace the fluid source at a specific time, the fluid source can be replaced in advance.

(6) The fluid remaining amount management device may further include: a first setting unit that sets priorities for a plurality of analysis schedules of one or more analysis apparatuses; and a first changing unit that changes the execution timing of at least a part of the analysis schedule so that the remaining amount shortage timing is out of the specific timing, based on the priority set by the first setting unit.

In this case, by changing the execution timing of the analysis schedule having the low priority, it is possible to prevent the remaining amount of the fluid in the fluid source from being insufficient at a specific timing. Thus, analysis scheduling with high priority can be executed at a specific time.

(7) The fluid remaining amount management device may further include: a second setting unit that sets priorities for the plurality of analysis devices; and a second changing unit that changes the operation timing of at least a part of the analysis devices so that the remaining amount shortage timing is out of the specific timing based on the priority set by the second setting unit.

In this case, by changing the operation timing of the analyzer having a low priority, the remaining amount of the fluid in the fluid source can be prevented from being insufficient at a specific timing. This enables the analyzer having a high priority to be operated at a specific time.

(8) An analysis system according to another aspect of the present invention includes: one or more analysis devices that perform analysis using fluid supplied from a fluid source; and the fluid residual amount management device for managing the residual amount of the fluid in the fluid source.

In this case, the remaining amount of the fluid in the fluid source is not directly detected, and the shortage period of the remaining amount of the fluid in the fluid source can be determined regardless of the number of the analyzing devices connected to the fluid source. This makes it possible to replace the fluid source before the remaining amount of the fluid in the fluid source becomes insufficient, and therefore, it is possible to prevent the analysis of the analyzer from being stopped.

(9) A remaining amount of fluid management method according to another aspect of the present invention is a method for managing a remaining amount of fluid in a fluid source that supplies fluid to one or more analysis devices, including the steps of: predicting a passage of a predetermined usage amount of fluid used in one or more analysis devices after a current point in time; and determining a remaining amount shortage period when the remaining amount of the fluid source is insufficient based on the predicted transition of the predetermined usage amount.

According to this fluid remaining amount management method, the remaining amount of the fluid in the fluid source is not directly detected, and the shortage period of the remaining amount of the fluid in the fluid source can be determined regardless of the number of the analyzers connected to the fluid source. This makes it possible to replace the fluid source before the remaining amount of the fluid in the fluid source becomes insufficient, and therefore, it is possible to prevent the analysis of the analyzer from being stopped.

(10) The fluid remaining amount management method may further include a step of notifying a warning indicating that the fluid source should be replaced at a time earlier than the remaining amount shortage time determined by the determination unit. In this case, the user is prompted to replace the fluid source. Thereby, the user can replace the fluid source before the remaining amount of the fluid source is insufficient. Therefore, it is possible to prevent the analysis from being stopped due to the shortage of the remaining amount of the fluid.

(11) The notifying step may also include the steps of: when the determined remaining amount shortage period is within a specific period, a warning is notified at a period earlier than the bit timing period.

(12) A fluid remaining amount management program according to another aspect of the present invention is a fluid remaining amount management program for managing a remaining amount of a fluid in a fluid source that supplies the fluid to one or more analysis devices, the fluid remaining amount management program causing a computer to execute the steps of: predicting a passage of a predetermined usage amount of fluid used in one or more analysis devices after a current point in time; and determining a remaining amount shortage period when the remaining amount of the fluid source is insufficient based on the predicted transition of the predetermined usage amount.

According to this fluid remaining amount management program, the remaining amount of the fluid in the fluid source is not directly detected, and the shortage period of the remaining amount of the fluid in the fluid source can be determined regardless of the number of the analyzers connected to the fluid source. This makes it possible to replace the fluid source before the remaining amount of the fluid in the fluid source becomes insufficient, and therefore, it is possible to prevent the analysis of the analyzer from being stopped.

ADVANTAGEOUS EFFECTS OF INVENTION

According to the present invention, the remaining amount of the fluid in the fluid source is not directly detected, and the shortage period of the remaining amount of the fluid in the fluid source can be determined regardless of the number of the analyzing devices connected to the fluid source.

Drawings

Fig. 1 is a block diagram showing a configuration of an analysis system according to an embodiment of the present invention.

Fig. 2 is a block diagram showing the structure of the analysis device of fig. 1.

Fig. 3 is a schematic diagram showing an example of the schedule table.

Fig. 4 is a schematic diagram showing an example of a management screen displayed on the display device of the fluid remaining amount management device of fig. 1.

Fig. 5 is a block diagram showing a functional structure of the fluid remaining amount managing apparatus of fig. 1.

Fig. 6 is a flowchart showing an algorithm of the fluid remaining amount management program.

Fig. 7 is a flowchart showing an algorithm of the fluid remaining amount management program.

Fig. 8 is a diagram for explaining the relationship between the remaining amount shortage timing, the replacement timing, and the specific timing.

Fig. 9 is a diagram for explaining the relationship between the remaining amount shortage timing, the replacement timing, and the specific timing.

Detailed Description

Hereinafter, a fluid remaining amount management device, an analysis system, a fluid remaining amount management method, and a fluid remaining amount management program according to embodiments of the present invention will be described in detail with reference to the drawings.

(1) Structure of analysis system

Fig. 1 is a block diagram showing a configuration of an analysis system according to an embodiment of the present invention. The analysis system 100 of fig. 1 includes one or more analysis devices 1 and a fluid remaining amount management device 2. In the present embodiment, the remaining fluid amount management apparatus 2 is connected to a plurality of analyzers 1. Hereinafter, when the plurality of analysis devices 1 are divided, the plurality of analysis devices 1 are referred to as analysis devices 1a, 1b, and 1c, respectively. In the present embodiment, each analysis device 1 is a gas chromatograph, and the fluid is a gas.

The plurality of analyzers 1 are connected to gas cylinders 3a and 3b, respectively. The gas cylinders 3a and 3b supply the gas after pressure reduction to the plurality of analyzers 1 by pressure regulators (not shown). The gas bomb 3a is for storing He (helium gas), for example. Gas cylinder 3b for storing e.g. H2(Hydrogen). A plurality of analysis devices 1 are provided in the analysis chamber. The plurality of analyzers 1 may be provided in the same analysis chamber or in different analysis chambers. The gas cylinders 3a and 3b may be installed in the analysis chamber or may be installed outdoors. The fluid remaining amount management device 2 includes a data processing device 21, a storage device 22, an information input unit 23, and a display device 24.

The data processing device 21 is composed of a CPU (central processing unit), a RAM (random access memory), and a ROM (read only memory), and is, for example, a personal computer or a server. The ROM stores a fluid remaining amount management program. The data processing device 21 is connected to the plurality of analysis devices 1, acquires various information such as a schedule table described later from each analysis device 1, and provides various instructions and various information to each analysis device 1.

The storage device 22 includes a storage medium such as a hard disk, an optical disk, a magnetic disk, a semiconductor memory, or a memory card, and stores schedule information and the like described later. The storage device 22 may also store a fluid remaining amount management program.

The information input unit 23 includes a keyboard, a pointing device, a communication interface, and the like, and is used to input various information, data, and the like. When the information input unit 23 is connected to a communication network such as the internet, various information such as weather forecast can be acquired from the internet or the like. The display device 24 includes a liquid crystal display, an organic electroluminescence display, or the like, for displaying various information and images.

(2) Structure of analysis device 1

Fig. 2 is a block diagram showing the configuration of the analysis device 1 of fig. 1. The analysis device 1 of fig. 1 includes an analysis control unit 11, a storage unit 12, an operation unit 13, and a display unit 14. The analysis control unit 11 is composed of a CPU, a RAM, and a ROM. The storage unit 12 includes a storage medium such as a hard disk, an optical disk, a magnetic disk, a semiconductor memory, or a memory card, and stores various information such as a schedule table described later. The operation unit 13 includes a keyboard, a pointing device, and the like, and is used for inputting various information, data, and the like. The display unit 14 includes a liquid crystal display, an organic electroluminescence display, or the like, and displays various information and images.

The analyzer 1 further includes flow control devices 15 and 16, a column 17, a sample vaporizing chamber 18, and a detector 19. The flow rate control device 15 supplies helium gas supplied from the gas bomb 3a through the pipe P1 into the sample vaporizing chamber 18 as a carrier gas, for example. A flow rate detection sensor for detecting the flow rate of the carrier gas is provided in the flow rate control device 15. The flow rate control device 16 supplies helium gas supplied from the gas cylinder 3a through a pipe P1 to the detector 19 as a supplementary gas (Makeup gas), and supplies hydrogen gas supplied from the gas cylinder 3b through a pipe P2 to the detector 19. The flow rate control device 16 is provided with flow rate sensors that detect the flow rates of the make-up gas and the hydrogen gas, respectively.

In the present embodiment, a hydrogen Flame Ionization Detector (FID) or a Flame Thermionic Detector (FTD) is used as the detector 19. In the case of using an electron capture type detector (ECD) or a Thermal Conductivity Detector (TCD) as the detector 19, only the supplementary gas (helium gas) from the gas bomb 3a is supplied to the flow control device 16. In the case of using a Flame Photometric Detector (FPD) as the detector 19, only the hydrogen gas from the gas cylinder 3b is supplied to the flow rate detector 16. In the present embodiment, the column 17 is a capillary column and is housed in a column heating furnace 17 a.

When performing analysis, a sample solution is introduced into the sample vaporization chamber 18. The sample solution is heated to a predetermined temperature in the sample vaporizing chamber 18. Thereby, the components in the sample solution are vaporized and introduced into the column 17 as a sample gas. The sample gas passes through the column 17 together with the carrier gas, and the components separated in the time direction are introduced into the detector 19. The detector 19 outputs a detection signal corresponding to the amount of each component contained in the sample gas to the analysis control unit 11.

The flow rate control device 15 controls the flow rate of the carrier gas. The flow control device 16 controls the flow of make-up gas and hydrogen. The analysis control unit 11 calculates the amount of each gas to be used by integrating the flow rates of each gas detected by the flow rate sensors of the flow rate control devices 15 and 16 over time. The analysis controller 11 may calculate the amount of each gas used for each analysis based on the flow rate of the gas and the supply time of the gas included in the analysis method file, which will be described later. The amount of each gas used is stored in the storage unit 12. The usage amount of each gas stored in the storage unit 12 is updated every fixed time or every time analysis is performed.

(3) Scheduling table

Fig. 3 is a schematic diagram showing an example of the schedule table. The schedule table ST in fig. 3 indicates the analysis schedule of one analysis device 1, and is stored in the storage unit 12 in fig. 2. One or more analysis schedules are registered in the schedule table ST. Each analysis schedule includes the contents of more than one analysis. In the example of fig. 3, schedule numbers sa1, sa2 for determining a plurality of analysis schedules are included in the schedule table ST. Each analysis schedule of the plurality of schedule numbers sa1, sa2 includes a plurality of analyses. One row in the schedule table ST of fig. 3 corresponds to one analysis. Each analysis is specified by an analysis number, a sample name, an analysis method file name, and the like. The analysis method file includes analysis conditions such as operation conditions of each part of the analyzer 1. The analysis conditions include, for example, the flow rates and supply times of the carrier gas, the replenishment gas, and the hydrogen gas. In the example of fig. 3, in the analysis schedule of the schedule number sa1, the analysis number "a 1", the sample name "a", and the analysis Method file name "Method _ 1" are registered as the first analysis, the analysis number "a 2", the sample name "B", and the analysis Method file name "Method _ 1" are registered as the second analysis, and the analysis number "a 3", the sample name "C", and the analysis Method file name "Method _ 1" are registered as the third analysis. In the analysis schedule of the schedule number sa2, the analysis number "b 1", the sample name "D", and the analysis Method file name "Method _ 2" are registered as the first analysis, the analysis number "b 2", the sample name "E", and the analysis Method file name "Method _ 2" are registered as the second analysis, and the analysis number "b 3", the sample name "F", and the analysis Method file name "Method _ 2" are registered as the third analysis. Each analysis method file is stored in the storage unit 12.

The analysis control unit 11 of the analysis device 1 in fig. 2 controls each unit of the analysis device 1 so that each analysis of one or more analysis schedules is sequentially executed in accordance with the schedule ST stored in the storage unit 12. The display unit 14 displays the schedule table ST stored in the storage unit 12. The user can delete the analysis schedule or analysis registered in the schedule table ST using the operation unit 13, and can register a new analysis schedule or analysis in the schedule table ST.

The data processing device 21 of the remaining fluid amount management device 2 in fig. 1 acquires the schedule table ST from the plurality of analysis devices 1, and generates the schedule information by integrating the acquired schedule tables ST. The schedule information includes the execution order of one or more analysis schedules and the priorities of the analysis schedules, and the like, in association with the plurality of analysis apparatuses 1. The schedule information is displayed on the management screen by the display device 24.

(4) Management picture

Fig. 4 is a schematic diagram showing an example of a management screen displayed on the display device 24 of the fluid remaining amount management device 2 in fig. 1.

As shown in fig. 4, the management screen AD displays the device numbers "1 a" to "1 c" of the plurality of analysis devices 1a to 1c, and the check boxes CHa to CHc corresponding to the device numbers "1 a" to "1 c", respectively. Further, schedule numbers "sa 1" to "sa 3" corresponding to the device number "1 a" are displayed, schedule numbers "sb 1" to "sb 3" corresponding to the device number "1 b" are displayed, and schedule numbers "sc 1" to "sc 3" corresponding to the device number "1 c" are displayed. Check boxes CHa1 to CHa3, CHb1 to CHb3, and CHb1 to CHc3 corresponding to schedule numbers "sa 1" to "sa 3", "sb 1" to "sb 3", and "sc 1" to "sc 3" are also displayed, respectively. By checking the check box, the corresponding analysis device 1 or the corresponding analysis schedule is in a selected state. By canceling the check of the check box, the corresponding analysis apparatus 1 or the corresponding analysis schedule is set to the non-selection state. The analysis device 1 in the non-selection state does not operate. In addition, the analysis schedule in the non-selection state is not executed.

The management screen AD displays input fields PR1 to PR3 of priorities corresponding to the device numbers "1 a" to "1 c". Input fields PR11 to PR13, PR21 to PR23, and PR31 to PR33, which have priorities corresponding to schedule numbers "sa 1" to "sa 3", "sb 1" to "sb 3", and "sc 1" to "sc 3", are displayed. The display columns 30a and 30b at the uppermost portion of the management screen AD display the replacement timing of the gas cylinders 3a and 3 b. In addition, warning display portions 31a and 31b are displayed in correspondence with the display fields 30a and 30 b.

In the example of fig. 4, check boxes CHa to CHc are checked. In this case, the analyzers 1a, 1b, 1c are operated. The check boxes CHa1 to CHa3, CHb1 to CHb3, CHc1, and CHc2 are checked, and the check box CHc3 is an empty box. In this case, the analysis device 1a sequentially executes the analysis schedules of the schedule numbers "sa 1 to" sa 3. In the analyzer 1b, analysis schedules of schedule numbers "sb 1 to" sb3 are executed in order. In the analyzer 1c, the analysis schedules of the schedule numbers "sc 1 and" sc2 are sequentially executed, and the execution of the analysis schedule of the schedule number "sc 3 is suspended.

The user can input priorities to the priority input fields PR1 to PR3, PR11 to PR13, PR21 to PR23, and PR31 to PR 33. In the example of fig. 4, the analyzing device 1a has a higher priority than the analyzing devices 1b and 1 c. The analysis schedule of the schedule number "sa 1 has higher priority than the analysis schedules of the schedule numbers" sb1 and "sc 1. The data processing device 21 may automatically set priorities of the analysis devices 1 and the analysis schedules.

(5) Functional structure of fluid remaining amount management device 2

Fig. 5 is a block diagram showing a functional structure of the fluid remaining amount management device 2 of fig. 1.

As shown in fig. 5, the data processing apparatus 21 includes a specific time period acquisition unit 211, a specific time period update unit 212, a remaining amount initial value acquisition unit 213, a usage amount acquisition unit 214, a remaining amount calculation unit 215, and a remaining amount update unit 216. The data processing device 21 includes a scheduled usage amount prediction unit 217, a remaining amount shortage time determination unit 218, a replacement time setting unit 219, a replacement time prediction unit 220, a replacement determination unit 221, a replacement time arrival determination unit 222, a warning notification unit 223, and an execution time change unit 224. The data processing apparatus 21 further includes a schedule table acquisition unit 225, a schedule information generation unit 226, a management screen generation unit 227, and a priority setting unit 228. The functions of the components (211 to 227) are realized by the CPU executing a fluid remaining amount management program, which is a computer program stored in a storage medium (recording medium) such as the ROM or the storage device 22. Some or all of the components of the fluid remaining amount management device 2 may be implemented by hardware such as an electronic circuit.

The storage device 22 includes a specific time storage unit 231, a remaining amount storage unit 232, a usage amount change storage unit 233, and a schedule information storage unit 234.

The specific time period acquisition unit 211 acquires a specific time period based on the calendar information. In this case, the specific periods are saturday, sunday, holiday, and holiday. The specific time period acquisition unit 211 may acquire a weather forecast via the internet or the like, and acquire a rainy day as the specific time period based on the acquired weather forecast. The specific time storage unit 231 stores the specific time acquired by the specific time acquisition unit 211. The specific time update unit 212 updates the specific time stored in the specific time storage unit 231. For example, the specific period updating part 212 updates the specific period based on the calendar information of the new year when the year changes. Further, the specific time period updating unit 212 updates the specific time period when the weather forecast is updated. The user can set or change the specific time period using the information input unit 23.

When the user replaces the used gas cylinders 3a and 3b with new gas cylinders 3a and 3b, the amount of gas stored in the new gas cylinders 3a and 3b is input as the initial value of the remaining amount using the information input unit 23. The amount of gas in the gas cylinders 3a, 3b is expressed by the volume of gas or the pressure of gas. The remaining amount initial value acquisition unit 213 acquires an input remaining amount initial value. The remaining amount storage unit 232 stores the initial value of the remaining amount of each of the gas cylinders 3a and 3b as the remaining amount. The usage amount acquiring unit 214 acquires the usage amount of each gas from each analyzer 1. In this case, each analyzer 1 may periodically transmit the usage amount of each gas to the remaining fluid amount management device 2, and the usage amount acquiring unit 214 may acquire the received usage amount. Alternatively, the usage amount acquiring unit 214 may request each analysis device 1 to transmit the usage amount, and the usage amount acquiring unit 214 may acquire the usage amount transmitted from each analysis device 1 according to the request.

The remaining amount calculating unit 215 calculates the total amount of use of each gas in the plurality of analysis devices 1 based on the amount of use of each gas acquired by the use amount acquiring unit 214. The remaining amount updating unit 216 updates the remaining amount of each gas stored in the remaining amount storage unit 232 by subtracting the total usage amount calculated by the remaining amount calculating unit 215 from the remaining amount stored in the remaining amount storage unit 232.

The usage amount change storage unit 233 stores the temporal change in the usage amount of each gas acquired by the usage amount acquisition unit 214. The scheduled usage amount prediction unit 217 predicts the transition (change) of the scheduled usage amount of each gas after the current time based on the change in the usage amount of each gas stored in the usage amount change storage unit 233. The passage of the predetermined amount of usage is represented, for example, by a function or functions. Alternatively, the scheduled usage amount prediction unit 217 predicts the transition of the scheduled usage amount of each gas after the current time based on the flow rate and supply time of each gas in the analysis method file determined by the schedule band ST acquired from each analysis device 1.

The remaining amount shortage time determination unit 218 calculates, as remaining amount shortage times, the times at which the remaining amounts of the respective gas cylinders 3a and 3b are insufficient, based on the remaining amounts of the respective gases stored in the remaining amount storage unit 232 and the changes in the scheduled usage amounts of the respective gases predicted by the scheduled usage amount prediction unit 217. Here, the shortage of the remaining amount is not limited to the case where the remaining amount of each of the gas cylinders 3a and 3b is 0, and refers to the case where the remaining amount of each of the gas cylinders 3a and 3b does not satisfy the amount necessary for completing the one-time analysis schedule.

The replacement timing setting unit 219 sets the replacement timing of each of the gas cylinders 3a and 3b based on the remaining amount shortage timing calculated by the remaining amount shortage timing determining unit 218 and the specific timing stored in the specific timing storage unit 231. When the remaining amount replacement timing is within a specific period, the replacement timing is set to a period that is earlier than the specific period by a predetermined number of days. Further, for example, assuming that the gas cylinders 3a and 3b are not stored, the predetermined number of days is set in consideration of the time from the ordering to the connection of the gas cylinders 3a and 3 b. The replacement timing advance notifying unit 220 controls the display device 24 so that the replacement timing of each of the gas cylinders 3a and 3b set by the replacement timing setting unit 219 is displayed on the management screen AD shown in fig. 4. The replacement timing advance notifying unit 220 issues a command to the analysis control unit 11 of each analysis device 1 so that the display unit 14 of each analysis device 1 displays the replacement timing of each gas cylinder 3a, 3 b. The replacement timing advance notifying unit 220 may display the replacement timing of each of the gas cylinders 3a and 3b on the display device 24 or the display unit 14 at all times, or may display the replacement timing on the display device 24 or the display unit 14 at the time of arrival or at a time from a predetermined date before the arrival to the time of arrival of the replacement timing.

The schedule table acquisition unit 225 acquires the schedule table ST from the plurality of analysis devices 1. The schedule information generator 226 generates the schedule information by integrating the schedules ST of the plurality of analysis devices 1 acquired by the schedule acquisition unit 225. The schedule information storage unit 234 stores the schedule information generated by the schedule information generation unit 226. When the user of each analysis device 1 updates the schedule table ST, the schedule information generation unit 226 updates the schedule information stored in the schedule information storage unit 234 based on the schedule table ST acquired by the schedule table acquisition unit 225.

The management screen generating unit 227 generates the management screen AD based on the schedule information stored in the schedule information storing unit 234, and displays the generated management screen AD on the display device 24. When the user changes the presence or absence of checkings in the check boxes CHa to CHc, CHa1 to CHa3, CHb1 to CHb3, and CHc1 to CHc3 on the management screen AD, the schedule information generating unit 226 updates the schedule information stored in the schedule information storage unit 234.

The user can set priorities for the plurality of analysis devices 1 and the plurality of analysis schedules on the management screen AD using the information input unit 23. The priority setting unit 228 sets the priorities input through the information input unit 23 for each analysis device 1 and each analysis schedule.

The replacement determination unit 221 determines whether or not the gas cylinders 3a and 3b connected to the plurality of analyzers 1 are replaced with new gas cylinders 3a and 3 b. For example, when the user replaces the gas cylinders 3a and 3b, the information input unit 23 notifies the data processing device 21 that the gas cylinder 3a has been replaced, and the information input unit 23 inputs the initial values of the remaining amounts of the new gas cylinders 3a and 3 b.

The replacement timing arrival determination unit 222 determines whether or not the replacement timing of the gas cylinders 3a and 3b has arrived. When the replacement time has come without replacing the gas cylinders 3a and 3b, the warning notification unit 223 notifies a warning indicating that the used gas cylinders 3a and 3b should be replaced with new gas cylinders 3a and 3b via the display device 24. The warning notification unit 223 may cause the display unit 14 of each analysis device 1 to display a warning. In the present embodiment, one or both of the warning display units 31a and 31b shown in fig. 4 are blinked. Note that the method of notifying the warning is not limited to the method of the present embodiment, and the warning may be displayed in characters or may be notified by sound.

When the gas cylinders 3a and 3b are not replaced within a predetermined period after the warning display units 31a and 31b blink, the execution timing changing unit 224 changes the operation timing of a part of the analysis devices 1 or the execution timing of a part of the analysis schedule based on the priority set by the priority setting unit 228. Specifically, the execution timing changing unit 224 stops the operation of the analysis device 1 having a low priority, or suspends the execution of the analysis schedule having a low priority. Thus, the analysis device 1 having a high priority can be operated or an analysis schedule having a high priority can be executed without causing shortage of the remaining amount of each gas. In this case, the replacement timing of the gas cylinders 3a and 3b is delayed. After the gas cylinders 3a and 3b are replaced, the stopped analysis apparatus 1 is operated to execute the suspended analysis schedule.

(6) Fluid residual amount management program

Fig. 6 and 7 are flowcharts showing the algorithm of the fluid remaining amount management program. Fig. 8 and 9 are diagrams for explaining the relationship between the remaining amount shortage timing, the replacement timing, and the specific timing. Hereinafter, a method of managing the remaining amount of fluid in the gas cylinder 3a will be described. The same applies to the method of managing the remaining amount of fluid in the gas cylinder 3 b.

First, the specific time period acquisition unit 211 in fig. 5 acquires a specific time period (step S1), and stores the acquired specific time period in the specific time period storage unit 231 (step S2). In the present embodiment, the specific period is saturday, sunday, holiday, and rainy day based on weather forecast. In the example of fig. 8, saturday, sunday, and rainy day are the specific periods SP.

Here, when the user replaces the used gas cylinder 3a with a new gas cylinder 3a, the amount of gas stored in the new gas cylinder 3a is input as the initial value of the remaining amount through the information input unit 23. The remaining amount initial value acquiring unit 213 acquires the input remaining amount initial value (step S3), and stores the acquired remaining amount initial value as the remaining amount in the remaining amount storage unit 232 (step S4).

Next, the specific time update unit 212 determines whether or not the specific time is updated by the information input unit 23 (step S5). For example, it is determined whether or not a specific time such as a holiday is changed by the user using the information input unit 23. In addition, it is determined whether the rainy day is changed due to a change in the weather forecast. If the specific time period has not been updated, the specific time period updating unit 212 proceeds to step S7. When the specific time is updated, the specific time updating unit 212 updates the specific time stored in the specific time storage unit 231 (step S6).

The usage amount acquiring unit 214 acquires the usage amount of the gas from the last time the usage amount of the gas was acquired to the current time point from each of the plurality of analysis devices 1 (step S7). The remaining amount calculating part 215 calculates the remaining amount of gas in the gas bomb 3a by subtracting the sum of the usage amounts of the plurality of analyzing devices 1 from the remaining amount stored in the remaining amount storing part 232 (step S8). Remaining amount updating unit 216 updates the remaining amount stored in remaining amount storage unit 232 to the remaining amount calculated by remaining amount calculating unit 215 (step S9). In the example of fig. 8, the change in the remaining amount before the current time point is shown by a thick solid line L1.

The schedule table acquisition unit 225 acquires the schedule table ST from the plurality of analysis apparatuses 1 (step S10). The schedule information generation unit 226 generates schedule information by integrating the acquired schedule tables ST of the plurality of analysis devices 1a to 1c (step S11). The schedule information generator 226 stores the generated schedule information in the schedule information storage 234 (step S12). The management screen generating unit 227 generates the management screen AD based on the schedule information stored in the schedule information storage unit 234, and causes the display device 24 to display the generated management screen AD (step S13).

The user can input priorities to the input fields PR1 to PR3, PR11 to PR13, PR21 to PR23, and PR31 to PR33 of the management screen AD through the information input unit 23. The priority setting unit 228 determines whether or not the user inputs the priority on the management screen AD (step S14). When the priority is input, the priority setting unit 228 sets the priority of each analysis device 1 or each analysis schedule in the schedule information (step S15). In the case where the priority is not input in step S14, step S15 is skipped.

The schedule information generator 226 determines whether or not the selection state of each analysis device 1 or each analysis schedule is changed on the management screen AD (step S16). When the selection state of each analysis device 1 or each analysis schedule is changed, the schedule information generation unit 226 returns to step S11 to update the schedule information. Then, the processing of steps S12 to 16 is performed.

The schedule table acquisition unit 225 determines which analysis device 1 has changed the schedule table ST (step S17). For example, the user can add, change, or delete the analysis schedule to the schedule table ST of fig. 3. When the schedule ST is changed in any of the analyzers 1, the schedule acquisition unit 225 returns to step S10 to acquire the changed schedule ST. Thereafter, the processing of steps S11 to S17 is performed.

When the schedule ST is not changed in any of the plurality of analyzers 1, the predicted usage amount predicting unit 217 predicts a transition of the predicted usage amount of the gas after the current time (step S18). In fig. 8, the transition of the predetermined usage amount of gas after the current time point is shown by a chain line.

Remaining amount shortage time determination unit 218 calculates a remaining amount shortage time based on the remaining amount stored in remaining amount storage unit 232 and the transition of the scheduled usage predicted by scheduled usage prediction unit 217 (step S19). In the example of fig. 8, the remaining amount shortage period is saturday of the specific period SP.

The replacement timing setting unit 219 determines whether or not the remaining amount shortage timing is within a specific timing (step S20). In the example of fig. 8, the remaining amount shortage period is saturday of the specific period SP. When the remaining amount shortage time is within the specific time, the replacement time setting unit 219 sets the replacement time to a time earlier than the remaining amount shortage time by a predetermined number of days (step S21). In the example of fig. 8, the replacement period is set to wednesday three days before saturday of the specific period SP.

When the remaining amount shortage period is out of the specified period, the replacement period setting unit 219 sets the replacement period to a period that is earlier than the remaining amount shortage period by a predetermined number of days (step S22). The replacement timing advance notifying unit 220 advances the replacement timing set by the replacement timing setting unit 219 via the display device 24 (step S23). For example, the display column 30a of the management screen AD of fig. 4 displays the replacement timing of the gas cylinder 3 a. Further, the display unit 14 of each analyzer 1 may display the replacement timing of the gas cylinder 3 a. In addition, the replacement timing may be notified in advance by sound.

Next, the replacement determination unit 221 determines whether or not the used gas cylinder 3a is replaced with a new gas cylinder 3a (step S24). When the used gas cylinder 3a is replaced with a new gas cylinder 3a, the replacement determination unit 221 returns to step S3, and the remaining amount initial value acquisition unit 213 acquires the remaining amount initial value of the new gas cylinder 3 a. Thereafter, the processing of steps S4 to S24 is performed.

When the used gas cylinder 3a is not replaced with a new gas cylinder 3a, the replacement timing arrival determination unit 222 determines whether or not the replacement timing has arrived (step S25). When the replacement time does not arrive, the replacement time arrival determination unit 222 returns to step S7, and the usage amount acquisition unit 214 acquires the usage amount of the gas in each analysis device 1. Thereafter, the processing of steps S8 to S25 is performed.

When the replacement time has come in step S25, the warning notification unit 223 notifies a warning through the display device 24 (step S26). In the example of fig. 8, when it is determined that the replacement time of the used gas cylinder 3a has not been replaced with a new gas cylinder 3a, a warning is notified at the replacement time. Specifically, the warning display unit 31a of the management screen AD of fig. 4 blinks. In addition, a warning is notified on the display unit 14 of each analysis device 1.

After the fixed period, the replacement determination unit 221 determines whether or not the used gas cylinder 3a is replaced with a new gas cylinder 3a (step S27). When the used gas cylinder 3a is replaced with a new gas cylinder 3a, the replacement determination unit 221 returns to step S3, and the remaining amount initial value acquisition unit 213 acquires the remaining amount initial value of the new gas cylinder 3 a. Thereafter, the processing of steps S4 to S27 is performed.

In step S27, when the used gas cylinder 3a is not replaced with a new gas cylinder 3a, the execution timing changing unit 224 changes the operation timing of at least a part of the analysis apparatus 1 or the execution timing of at least a part of the analysis schedule based on the priority set by the priority setting unit 228 (step S28). Specifically, the operation of the analysis device 1 having a low priority or the execution of the analysis schedule having a low priority is stopped. For example, the execution time changing unit 224 cancels checking of a check box corresponding to the analysis device 1 having a low priority or the analysis schedule on the management screen AD in fig. 4. Thereby, the corresponding analysis device 1 or the corresponding analysis schedule becomes a non-selection state. The execution time changing unit 224 instructs the analyzer 1 in the non-selected state or the analyzer 1 corresponding to the analysis schedule in the non-selected state to change the schedule table ST. After the schedule ST is changed, the execution time changing unit 224 returns to step S10, and the schedule acquiring unit 225 acquires the changed schedule ST. Thereafter, the processing of steps S11 to S28 is performed.

In step S16, when any one of the analysis devices 1 or any one of the analysis schedules is changed to the non-selection state by canceling the check of any one of the check boxes on the management screen AD, the transition of the remaining amount at the current time point and thereafter is changed as shown by a chain line L2 in fig. 9. In the example of fig. 9, the remaining amount insufficient period is changed from saturday in the example of fig. 8 to thursday of the next week. Thus, the remaining amount shortage time is a time other than the specific time SP. In this case, the replacement time is set to monday again, and a warning is notified when the replacement time for monday comes.

(7) Effects of the embodiments

According to the fluid remaining amount management device 2 of the present embodiment, the transition of the scheduled usage amount of gas used in one or more analysis devices 1 at or after the current time point is predicted, and the remaining amount shortage time is determined based on the predicted transition of the scheduled usage amount. In this case, the remaining amount of gas in each of the gas cylinders 3a, 3b is not directly detected, and the remaining amount shortage timing of the gas in each of the gas cylinders 3a, 3b is determined regardless of the number of the analyzers 1 connected to each of the gas cylinders 3a, 3 b. Further, a warning is notified at the time of replacement of each of the gas cylinders 3a and 3 b. This prompts the user to replace the gas cylinders 3a and 3 b. Therefore, the user can perform the ordering operation or the replacement operation of each of the gas cylinders 3a and 3b before the remaining amount of the gas in each of the gas cylinders 3a and 3b becomes insufficient. As a result, the analysis can be prevented from being stopped due to the shortage of the remaining amount of the gas.

In addition, the replacement timing of each of the gas cylinders 3a and 3b is notified in advance. This enables the user to know the replacement timing of each of the gas cylinders 3a and 3b in advance.

If the remaining amount shortage time is within a specific time, a time earlier than the timer time is notified as a replacement time. In addition, a warning is notified when a replacement period earlier than the bit timing period comes. Thus, when it is difficult to replace the gas cylinders 3a and 3b at a specific time, the gas cylinders 3a and 3b can be replaced in advance. Thus, the analysis device 1 can be prevented from being stopped in a certain period. As a result, the downtime of the analyzer 1 can be reduced.

In addition, when the gas cylinders 3a and 3b are not replaced before the remaining amount of the gas cylinders 3a and 3b is insufficient, the operation timing of the analysis device 1 having a low priority or the execution timing of the analysis schedule having a low priority is changed. Thereby, the analysis device 1 having a high priority can continue to operate or can execute the analysis schedule having a high priority. As a result, the downtime of the analyzer 1 can be reduced.

Further, the operation timing of the analysis device 1 of which at least a part is changed based on the priority or the execution timing of at least a part of the analysis schedule is changed so that the remaining amount shortage timing is out of the specific timing. In this case, the analysis apparatus 1 having a low priority is stopped, or the execution of the analysis schedule having a low priority is suspended, thereby preventing the remaining amount of gas of each gas cylinder 3a, 3b from being insufficient at a certain period. This enables the analysis device 1 having a high priority to be operated at a specific time or to execute an analysis schedule having a high priority at a specific time.

(8) Other embodiments

(8-1) in the above embodiment, the fluid is helium gas and hydrogen gas, but the liquid may be N2And other gases such as (nitrogen gas) and Ar (argon gas). The fluid may be liquid carbon or liquid such as liquid nitrogen. In the above embodiment, the analysis device 1 is a gas chromatograph, but the analysis device 1 is not limited to the gas chromatograph, and may be another analysis device that performs analysis using a fluid. For example, the present invention can also be applied to a case where the analysis device 1 is, for example, a gas chromatograph/mass spectrometer, a total organic carbon analyzer (TOC), a Supercritical Fluid Chromatograph (SFC), or the like.

(8-2) in the above-described embodiment, the fluid residual amount managing device 2 is provided separately from the plurality of analyzing devices 1, but any one of the analyzing devices 1 may include the fluid residual amount managing device 2.

(8-3) in the above embodiment, the warning is notified when the set replacement timing comes, but the warning may be notified from before the fixed period of the replacement timing to the replacement timing.

(9) Correspondence between each constituent element of claims and each part of the embodiments

Hereinafter, examples of correspondence between the components of the claims and the components of the embodiments will be described, but the present invention is not limited to the examples described below. The gas cylinders 3a and 3b in the above-described embodiment are examples of a fluid source, the scheduled usage amount prediction unit 217 is an example of a prediction unit, the remaining amount shortage period determination unit 218 is an example of a determination unit, and the warning notification unit 223 is an example of a notification unit. The priority setting unit 228 is an example of a first or second setting unit, and the execution time changing unit 224 is an example of a first or second changing unit. As each constituent element of the claims, various other elements that realize the structures and functions described in the claims can be used.

22页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:用于指示氧化处理的设备、方法和系统

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!