阅读说明:本技术 一种防破损的石材夹具 (Breakage-proof stone material anchor clamps ) 是由 不公告发明人 于 2020-12-25 设计创作,主要内容包括:本发明公开了一种防破损的石材夹具,包括保护壳、操作箱、伸缩推杆和齿轮,所述保护壳的顶部固定有操作箱,所述固定块的内壁设置有活动杆,所述保护壳的内壁开设有两个滑道,所述滑轨的两侧设置有若干个卡块,所述固定杆的外壁固定有调节杆,所述调节杆的一侧固定有固定架,所述挂环的外壁固定有第二调节螺栓。该防破损的石材夹具,设置有固定架、第一弹簧、第二弹簧和防滑垫,增加了对石材进行夹持时的缓冲力,防止了防滑垫直接与石材进行接触,对石材造成破损的现象,同时通过防滑垫增加了对石材进行夹持的稳定性,提高了石材与夹具之间的摩擦力,防止了石材发生掉落的现象,进而提高了对石材的保护效果。(The invention discloses a breakage-proof stone clamp which comprises a protective shell, an operation box, a telescopic push rod and a gear, wherein the operation box is fixed at the top of the protective shell, a movable rod is arranged on the inner wall of a fixed block, two slide ways are formed in the inner wall of the protective shell, a plurality of clamping blocks are arranged on two sides of each slide way, an adjusting rod is fixed on the outer wall of each fixed rod, a fixed frame is fixed on one side of each adjusting rod, and a second adjusting bolt is fixed on the outer wall of a hanging ring. This breakage-proof stone material anchor clamps is provided with mount, first spring, second spring and slipmat, has increased the cushion effect when carrying out the centre gripping to the stone material, has prevented that the slipmat from directly contacting with the stone material, causes damaged phenomenon to the stone material, has increased the stability of carrying out the centre gripping to the stone material through the slipmat simultaneously, has improved the frictional force between stone material and the anchor clamps, has prevented that the stone material from taking place the phenomenon that drops, and then has improved the protection effect to the stone material.)

1. The utility model provides a breakage-proof stone material anchor clamps, includes protective housing (1), control box (2), flexible push rod (4) and gear (11), its characterized in that: the top of the protective shell (1) is fixed with an operation box (2), the inner wall of the operation box (2) is fixed with fixed blocks (3), the two fixed blocks (3) are respectively fixed on two sides of a telescopic push rod (4), the top of the operation box (2) is fixed with the telescopic push rod (4), the inner wall of each fixed block (3) is provided with a movable rod (6), the outer wall of each movable rod (6) is fixed with a sliding rail (7), the inner wall of the protective shell (1) is provided with two sliding ways (8), the inner walls of the two sliding ways (8) are respectively provided with a sliding block (9), two sides of each sliding rail (7) are provided with a plurality of clamping blocks (10), the outer walls of the clamping blocks (10) are provided with gears (11), the inner walls of the gears (11) are fixed with fixed rods (12), the outer walls of the fixed rods (12) are fixed with adjusting rods (13), and the intersection of the two adjusting rods, one side of adjusting pole (13) is fixed with mount (15), and the outer wall of mount (15) is provided with snap ring (16) to the outer wall of snap ring (16) is provided with first spring (17), and the other end of first spring (17) is fixed with couple (18), and the inner wall of couple (18) is provided with link (19), the outer wall of link (19) is fixed with second adjusting bolt (21), and the inner wall setting and second adjusting bolt (21) of limiting plate (20), and the outer wall of second adjusting bolt (21) runs through two fixed plates (24), the opposite side of limiting plate (20) is fixed with second spring (22), and the other end of second spring (22) is fixed with slipmat (23).

2. The breakage-proof stone clamp of claim 1, wherein: the quantity of fixed block (3) has 2, and the inner wall in control box (2) is fixed to one side of 2 fixed blocks (3) to 2 fixed blocks (3) are symmetrical axisymmetric setting with the perpendicular bisector of telescopic push rod (4).

3. The breakage-proof stone clamp of claim 1, wherein: the outer wall of flexible push rod (4) is provided with movable rod (6), and flexible push rod (4) and movable rod (6) constitute extending structure to the outer wall of movable rod (6) is fixed with slide rail (7), and slide rail (7) pass through movable rod (6) and flexible push rod (4) constitution integral structure moreover.

4. The breakage-proof stone clamp of claim 1, wherein: the inner wall of slide (8) is provided with slider (9), and slide (8) and slider (9) constitute sliding construction, the both sides of slide rail (7) are fixed with slider (9), and slide rail (7) pass through slider (9) and slide (8) constitution integral structure.

5. The breakage-proof stone clamp of claim 1, wherein: the number of the gears (11) is 2, the inner walls of the 2 gears (11) are fixedly provided with fixing rods (12), the outer walls of the fixing rods (12) are fixedly provided with adjusting rods (13), and the adjusting rods (13) and the gears (11) form an integrated structure through the fixing rods (12).

6. The breakage-proof stone clamp of claim 1, wherein: the number of the adjusting rods (13) is 2, a first adjusting bolt (14) is arranged at the center of each adjusting rod (13), and the 2 adjusting rods (13) form a rotating structure through the first adjusting bolts (14).

7. The breakage-proof stone clamp of claim 1, wherein: the outer wall of mount (15) is provided with snap ring (16), and the inside of snap ring (16) has seted up the slide opening to snap ring (16) rely on the slide opening to constitute sliding construction with mount (15), the outer wall of snap ring (16) is fixed with first spring (17), and first spring (17) rely on snap ring (16) and mount (15) to constitute the integral structure.

8. The breakage-proof stone clamp of claim 1, wherein: the inner wall of couple (18) is provided with link (19), and couple (18) and link (19) constitution block structure, the one end of first spring (17) is fixed with couple (18), and first spring (17) rely on couple (18) and link (19) to constitute the integral structure to the outer wall of link (19) is fixed with limiting plate (20), and limiting plate (20) rely on link (19) and couple (18) to constitute the integral structure, and limiting plate (20) and first spring (17) constitute the integral structure.

9. The breakage-proof stone clamp of claim 1, wherein: one side of limiting plate (20) is fixed with second spring (22), and second spring (22) and limiting plate (20) constitute extending structure to the other end of second spring (22) is fixed with slipmat (23), and slipmat (23) constitute integrated structure through second spring (22) and limiting plate (20) moreover, the quantity of second spring (22) has 8, and every 4 second springs (22) are a set of, and 2 group's second spring (22) use the perpendicular bisector of first adjusting bolt (14) to set up as symmetry axis symmetry.

Technical Field

The invention relates to the technical field of stones, in particular to a breakage-proof stone clamp.

Background

The stone is widely applied to indoor and outdoor decoration design, curtain wall decoration and public facility construction as a high-grade building decoration material, common stones in the market at present are mainly divided into natural stones and artificial stones, the natural stones are divided into slates and granites according to the quality of physical and chemical characteristics, the artificial stones are divided into terrazzo and synthetic stones according to the working procedures, and the terrazzo is formed by forging and pressing raw materials such as cement, concrete and the like; the synthetic stone is made up by using broken stone of natural stone as raw material, adding adhesive and making them pass through such processes of pressurization and polishing, and then the two are made up by using artificial stone, so that its strength is not high as that of natural stone.

When people transport stones, users are usually required to go to the stone clamp to help the users finish the transportation, the stone clamp known in the market at present has the problem of poor anti-breakage capability, when a user transports stones, the stability of the stones during transportation needs to be ensured, and the stones are prevented from being damaged during transportation, so that stone clamps in the market generally need to be manually clamped by the user, thereby easily causing the damage of the stone when the stone is moved, meanwhile, the clamps on the market are generally directly contacted with the stone, thereby causing collision between the stone and the fixing plate and easily causing damage of the stone, so that the integrity of the stone can not be ensured when the stone is processed, and then reduced the user and processed the effect that the stone material was gone out, can't satisfy user's daily work demand.

We have therefore proposed a breakage-proof stone clamp in order to solve the problems set forth above.

Disclosure of Invention

The invention aims to provide a breakage-proof stone clamp to solve the problem that the existing stone clamp in the market has poor breakage-proof capability and effect.

In order to achieve the purpose of good anti-damage capability effect of the stone clamp, the invention provides the following technical scheme: a damage-proof stone clamp comprises a protective shell, an operation box, a telescopic push rod and a gear, wherein the operation box is fixed at the top of the protective shell, fixed blocks are fixed on the inner wall of the operation box, the two fixed blocks are respectively fixed on two sides of the telescopic push rod, the telescopic push rod is fixed at the top of the operation box, a movable rod is arranged on the inner wall of each fixed block, a slide rail is fixed on the outer wall of each movable rod, two slide ways are arranged on the inner wall of the protective shell, slide blocks are respectively arranged on the inner walls of the two slide ways, a plurality of clamping blocks are arranged on two sides of each slide rail, the gear is arranged on the outer wall of each clamping block, a fixed rod is fixed on the inner wall of each gear, an adjusting rod is fixed on the outer wall of each fixed rod, a first adjusting bolt is arranged at the intersection of, and the outer wall of snap ring is provided with first spring, and the other end of first spring is fixed with the couple to the inner wall of couple is provided with the link, the outer wall of link is fixed with second adjusting bolt, and the inner wall setting of limiting plate and second adjusting bolt to two fixed plates are run through to the outer wall of second adjusting bolt, the opposite side of limiting plate is fixed with the second spring, and the other end of second spring is fixed with the slipmat.

Preferably, the quantity of fixed block has 2, and the inner wall at the control box is fixed to one side of 2 fixed blocks to 2 fixed blocks use the perpendicular bisector of flexible push rod as symmetry axis symmetry setting.

Preferably, the outer wall of the telescopic push rod is provided with a movable rod, the telescopic push rod and the movable rod form a telescopic structure, a sliding rail is fixed on the outer wall of the movable rod, and the sliding rail and the telescopic push rod form an integrated structure through the movable rod.

Preferably, the inner wall of slide is provided with the slider, and slide and slider constitute sliding structure, the both sides of slide rail are fixed with the slider, and the slide rail passes through the slider and constitutes integrated structure with the slide.

Preferably, the number of the gears is 2, the inner walls of the 2 gears are fixed with fixing rods, the outer walls of the fixing rods are fixed with adjusting rods, and the adjusting rods and the gears form an integrated structure through the fixing rods.

Preferably, the number of the adjusting rods is 2, a first adjusting bolt is arranged at the center of each of the 2 adjusting rods, and the 2 adjusting rods form a rotating structure through the first adjusting bolt.

Preferably, the outer wall of mount is provided with the snap ring, and the inside of snap ring has seted up the slide opening to the snap ring relies on the slide opening to constitute sliding structure with the mount, the outer wall of snap ring is fixed with first spring, and first spring relies on snap ring and mount to constitute integrated configuration.

Preferably, the inner wall of couple is provided with the link, and couple and link constitution block structure, the one end of first spring is fixed with the couple, and just first spring relies on the couple to constitute the integral structure with the link to the outer wall of link is fixed with the limiting plate, and the limiting plate relies on the link to constitute the integral structure with the couple, and the limiting plate constitutes the integral structure with first spring.

Preferably, one side of limiting plate is fixed with the second spring, and the second spring constitutes extending structure with the limiting plate to the other end of second spring is fixed with the slipmat, and the slipmat passes through the second spring and constitutes the integral structure with the limiting plate moreover, the quantity of second spring has 8, and every 4 second springs are a set of, and 2 sets of second springs use the perpendicular bisector of first adjusting bolt to set up as symmetry axis symmetry.

Compared with the prior art, the invention has the beneficial effects that: the stone clamp for preventing damage;

1. the stone clamping device is provided with a fixing frame, a first spring, a second spring and a non-slip mat, when a user needs to ensure the stone clamping effect to prevent the stone from being damaged, the adjusting rod is adjusted by a first adjusting bolt through the arranged fixing frame, a snap ring slides along the fixing frame, and the first spring is driven to stretch through the snap ring, so that the stability of angle adjustment between the two adjusting rods is increased through the arranged first spring, the stone fixing effect is ensured, the phenomenon that the adjusting rod shakes to influence the stone fixing effect is prevented, the phenomenon that the stone drops due to the instability of the adjusting rod is prevented, the stone is prevented from being damaged, the buffering force when the stone is clamped is increased through the arranged second spring and the non-slip mat, the phenomenon that the non-slip mat directly contacts with the stone and damages the stone is prevented, meanwhile, the anti-slip pad increases the stability of clamping the stone, improves the friction force between the stone and the clamp, prevents the stone from falling off, and further improves the protection effect on the stone;

2. be provided with the fixture block, gear and first adjusting bolt, when the user need carry out quick fixed to the stone material, fixture block and gear through setting up, make the user through starting flexible push rod, and then make flexible push rod drive the movable rod and stretch out and draw back, because the outer wall of movable rod is fixed with the slide rail, and then drive the slide rail and promote, because the both sides of slide rail are provided with the fixture block, and the fixture block constitutes block structure with the gear, and then make the gear rotate, it relies on first adjusting bolt to adjust the pole to drive, thereby shorten the distance between two slipmats and accomplish the fixed to the stone material, thereby the user has been simplified and has been carried out fixed flow to the stone material, the time that the user spent is fixed to the stone material has been practiced thrift, user's work efficiency has.

3. Be provided with the control box, fixed block and pull ring, when the user need carry out the centre gripping to large-scale stone material, control box and fixed block through setting up, stability between flexible push rod and the control box has been increased, the phenomenon that flexible push rod takes place to drop has been prevented, and then the stability of flexible push rod during operation has been increased, then accomplish the centre gripping back to the stone material through starting flexible push rod, through the pull ring that sets up, made things convenient for the user to be connected whole anchor clamps through pull ring and conveyer, and then make the user transport large-scale stone material, the practicality of integrated device has been increased.

Drawings

FIG. 1 is a schematic top view of the present invention;

FIG. 2 is a schematic view of the connection structure of the slide and the slide block of the present invention;

FIG. 3 is a schematic view of a connection structure of an adjusting lever and a first adjusting bolt according to the present invention;

FIG. 4 is a schematic view of the connection structure of the fixing frame and the snap ring according to the present invention;

FIG. 5 is a schematic view of a connection structure of a second adjusting bolt with a fixing plate and a limiting plate according to the present invention;

FIG. 6 is an enlarged view of the structure at A in FIG. 1 according to the present invention.

In the figure: 1. a protective shell; 2. an operation box; 3. a fixed block; 4. a telescopic push rod; 5. a pull ring; 6. a movable rod; 7. a slide rail; 8. a slideway; 9. a slider; 10. a clamping block; 11. a gear; 12. fixing the rod; 13. adjusting a rod; 14. a first adjusting bolt; 15. a fixed mount; 16. a snap ring; 17. a first spring; 18. hooking; 19. hanging a ring; 20. a limiting plate; 21. a second adjusting bolt; 22. a second spring; 23. a non-slip mat; 24. and (7) fixing the plate.

Detailed Description

The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative efforts based on the embodiments of the present invention belong to the protection scope of the present invention.

Referring to fig. 1-6, the present invention provides a technical solution: a damage-proof stone clamp comprises a protective shell 1, an operation box 2, fixed blocks 3, a telescopic push rod 4, a pull ring 5, a movable rod 6, a slide rail 7, a slide rail 8, a slide block 9, a clamping block 10, a gear 11, a fixed rod 12, an adjusting rod 13, a first adjusting bolt 14, a fixed frame 15, a clamping ring 16, a first spring 17, a hook 18, a hanging ring 19, a limiting plate 20, a second adjusting bolt 21, a second spring 22, an anti-skid pad 23 and a fixed plate 24, wherein the top of the protective shell 1 is fixed with the operation box 2, the inner wall of the operation box 2 is fixed with the fixed blocks 3, the two fixed blocks 3 are respectively fixed at two sides of the telescopic push rod 4, the top of the operation box 2 is fixed with the telescopic push rod 4, the inner wall of the fixed block 3 is provided with the movable rod 6, the outer wall of the movable rod 6 is fixed with the slide rail 7, the inner wall of the protective, the two sides of the sliding rail 7 are provided with a plurality of clamping blocks 10, the outer wall of each clamping block 10 is provided with a gear 11, the inner wall of each gear 11 is fixed with a fixing rod 12, the outer wall of each fixing rod 12 is fixed with an adjusting rod 13, the intersection of the two adjusting rods 13 is provided with a first adjusting bolt 14, one side of each adjusting rod 13 is fixed with a fixing frame 15, the outer wall of each fixing frame 15 is provided with a clamping ring 16, the outer wall of each clamping ring 16 is provided with a first spring 17, the other end of each first spring 17 is fixed with a hook 18, the inner wall of each hook 18 is provided with a hanging ring 19, the outer wall of each hanging ring 19 is fixed with a second adjusting bolt 21, the inner wall of each limiting plate 20 is provided with a second adjusting bolt 21, the outer wall of each second adjusting bolt 21 penetrates through the two fixing plates 24, the other side of each limiting plate 20.

The quantity of fixed block 3 has 2, and one side of 2 fixed blocks 3 is fixed at the inner wall of control box 2 to 2 fixed blocks 3 use the perpendicular bisector of telescopic push rod 4 to set up as symmetry axis symmetry, through the fixed block 3 that sets up, have increased the stability between telescopic push rod 4 and the control box 2, have prevented that telescopic push rod 4 from taking place the phenomenon that drops, and then have increased telescopic push rod 4 and have carried out the stability of during operation.

The outer wall of telescopic push rod 4 is provided with movable rod 6, and telescopic push rod 4 constitutes extending structure with movable rod 6 to the outer wall of movable rod 6 is fixed with slide rail 7, and slide rail 7 passes through movable rod 6 and telescopic push rod 4 constitutes the integral structure moreover, through the telescopic push rod 4 who sets up, has made things convenient for the user to carry out quick centre gripping to the stone material, has practiced thrift the time that the user carries out the centre gripping cost to the stone material, has improved user's work efficiency.

The inner wall of slide 8 is provided with slider 9, and slide 8 and slider 9 constitute sliding structure, and the both sides of slide rail 7 are fixed with slider 9, and slide rail 7 passes through slider 9 and slide 8 constitution integrated structure, and through the slider 9 that sets up, increased slide rail 7 and carried out the stability that removes under the effect of telescopic push rod 4, reduced the frictional force between slide rail 7 and the protective housing 1, reduced the loss of slide rail 7, increased the life of integrated device.

The number of the gears 11 is 2, the inner wall of each gear 11 is fixed with a fixed rod 12, the outer wall of each fixed rod 12 is fixed with an adjusting rod 13, and the adjusting rods 13 and the gears 11 form an integrated structure through the fixed rods 12. Through the gear 11 that sets up, made things convenient for the user through slip slide rail 7 for the fixture block 10 and the gear 11 of slide rail 7 both sides constitute the block, and then drive gear 11 and rotate, make the angle of adjusting pole 13 adjust through dead lever 12 simultaneously and carry out the centre gripping to the stone material.

The quantity of adjusting pole 13 has 2, and 2 center departments of adjusting pole 13 are provided with first adjusting bolt 14 to 2 adjust pole 13 constitute revolution mechanic through first adjusting bolt 14, through the first adjusting bolt 14 that sets up, made things convenient for the angle of adjusting pole 13 to adjust the back, rely on first adjusting bolt 14 to carry out the change of angle to two regulation poles 13, accomplish and carry out the centre gripping to the stone material of different width.

The outer wall of mount 15 is provided with snap ring 16, and the inside of snap ring 16 has seted up the slide opening, and snap ring 16 relies on the slide opening to constitute sliding structure with mount 15, snap ring 16's outer wall is fixed with first spring 17, and first spring 17 relies on snap ring 16 and mount 15 to constitute integrated configuration, snap ring 16 through setting up, two stability of forming the angle between adjusting pole 13 after adjusting the pole 13 angle have been increased, it takes place to rock the fixed effect of influence to the stone material to have prevented to adjust pole 13, thereby it leads to the phenomenon that the stone material takes place to drop to take place to have prevented to adjust pole 13 unstability, the phenomenon that the stone material takes place to damage has been prevented.

The inner wall of couple 18 is provided with link 19, and couple 18 and link 19 constitute the block structure, the one end of first spring 17 is fixed with couple 18, and first spring 17 relies on couple 18 and link 19 to constitute the integral structure, and the outer wall of link 19 is fixed with limiting plate 20, and limiting plate 20 relies on link 19 and couple 18 to constitute the integral structure, and limiting plate 20 and first spring 17 constitute the integral structure, through the first spring 17 that sets up, made things convenient for the user to adjust back to adjusting lever 13, the phenomenon that first spring 17 can take place tensile, and then make snap ring 16 slide along mount 15, make limiting plate 20 rely on the angle between second adjusting bolt 21 and the fixed plate 24 to take place the skew by the tensile dependence of first spring 17 simultaneously, carry out the fine setting.

One side of limiting plate 20 is fixed with second spring 22, and second spring 22 constitutes extending structure with limiting plate 20, and the other end of second spring 22 is fixed with slipmat 23, and slipmat 23 passes through second spring 22 and limiting plate 20 constitution integral structure, the quantity of second spring 22 has 8, and every 4 second springs 22 are a set of, and 2 group's second springs 22 use the perpendicular bisector of first adjusting bolt 14 to set up as symmetry axis symmetry, through the second spring 22 that sets up, the buffer power when having increased and having carried out the centre gripping to the stone material, the slipmat 23 has been prevented directly to contact with the stone material, cause damaged phenomenon to the stone material.

The working principle is as follows: when the damage-proof stone clamp is used, firstly, the telescopic push rod 4 is started, and then the telescopic push rod 4 drives the movable rod 6 to stretch, because the outer wall of the movable rod 6 is fixed with the slide rail 7, and then the slide rail 7 is driven to push, and simultaneously, the slide blocks 9 at two sides of the slide rail 7 slide along the slide ways 8 arranged on the inner wall of the protective shell 1, so that the stability of the slide rail 7 moving under the action of the telescopic push rod 4 is increased, the friction force between the slide rail 7 and the protective shell 1 is reduced, the loss of the slide rail 7 is reduced, the service life of the whole device is prolonged, because the fixture blocks 10 are arranged at two sides of the slide rail 7, and the fixture blocks 10 and the gear 11 form a clamping structure, and further the gear 11 rotates, through the fixed rod 12 fixed inside the gear 11, the adjusting rod 13 is driven to be adjusted by the first adjusting bolt 14, so that the distance, then, through the fixing frame 15, after the adjusting rod 13 is adjusted by the first adjusting bolt 14, the snap ring 16 slides along the fixing frame 15, and then the first spring 17 is driven by the snap ring 16 to stretch, so that the stability of angle adjustment between the two adjusting rods 13 is increased by the first spring 17, thereby ensuring the fixing effect of the stone material, preventing the adjusting rod 13 from shaking to affect the fixing effect of the stone material, preventing the stone material from dropping due to instability of the adjusting rod 13, preventing the stone material from being damaged, because the inner wall of the first spring 17 is provided with the hook 18, and the outer wall of the hook 18 is fixed with the limiting plate 20, after the first spring 17 is stretched, the limiting plate 20 is adjusted by depending on the angle between the second adjusting bolt 21 and the fixing plate 24, and completing the angle adjustment of the second spring 22 and the anti-skid pad 23, the buffer force is increased when the stone is clamped through the second spring 22 and the anti-slip mat 23, the anti-slip mat 23 is prevented from directly contacting the stone to damage the stone, meanwhile, the stability of clamping the stone is increased through the anti-slip mat 23, the friction force between the stone and the clamp is improved, the stone is prevented from falling off, the protection effect on the stone is further improved, when a user needs to clamp a large stone, the stability between the telescopic push rod 4 and the operation box 2 is increased through the operation box 2 and the fixing block 3, the phenomenon that the telescopic push rod 4 falls off is prevented, the stability of the telescopic push rod 4 during working is further increased, then after the stone is clamped through starting the telescopic push rod 4, the whole clamp is conveniently connected with a transportation device through the pull ring 5 by the arranged pull ring 5, and then make the user can transport large-scale stone material, increased the practicality of whole device.

To thereby carry out a series of tasks, the contents of which are not described in detail in the present specification are prior art well known to those skilled in the art.

Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.

11页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种高安全系数的超临界釜体快开装置

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类